# BAPI_BUS2001_GET_STATUS — Read Project Definition Status

> Returns the active system and user statuses of a project definition. Custom reports and interfaces use it to check, for example, whether a project is released or technically closed before further processing. Evaluate RETURN (BAPIRETURN1) and read the status texts from the returned tables.

- Modules: PS
- Type: BAPI
- Function group: CNIF_STATUS_2001
- Remote-enabled (RFC): Yes
- S/4HANA status: Used the same way in S/4HANA
- URL: https://nekuhub.com/en/functions/bapi-bus2001-get-status/

## Importing parameters

| Parameter | Type | Description | Required |
|---|---|---|---|
| PROJECT_DEFINITION | BAPIPR-PROJECT_DEFINITION | Project definition | Yes |

## Exporting parameters

| Parameter | Type | Description |
|---|---|---|
| RETURN | BAPIRETURN1 | Return messages |

## Tables parameters

| Parameter | Type | Description | Required |
|---|---|---|---|
| E_SYSTEM_STATUS | BAPI_SYSTEM_STATUS | System statuses | - |
| E_USER_STATUS | BAPI_USER_STATUS | User statuses | - |

## Call template (ABAP)

```abap
CALL FUNCTION 'BAPI_BUS2001_GET_STATUS'
  EXPORTING
    project_definition = lv_project_definition
  IMPORTING
    return = lv_return
  TABLES
    e_system_status = lt_e_system_status
    e_user_status = lt_e_user_status.
```

## Related tables

JEST, PROJ

