PS BAPI RFC Used the same way in S/4HANA

BAPI_BUS2002_ACT_CHANGE_MULTI Change Network Activities

Changes several activities of a network in one call, for example work, duration, dates or the assigned WBS element. Interfaces use it to keep activity data in line with an external scheduling tool. Fill IT_UPDATE_ACTIVITY with 'X' for every changed field. Call BAPI_PS_INITIALIZATION first, then BAPI_PS_PRECOMMIT and BAPI_TRANSACTION_COMMIT only when ET_RETURN has no type E or A messages.

Function group
CN2002_ACT
Remote-enabled (RFC)
Yes
Type
BAPI

Importing parameters

ParameterTypeDescriptionRequired
I_NUMBERBAPI_NETWORK_LIST-NETWORKNetwork numberYes

Tables parameters

ParameterTypeDescriptionRequired
IT_ACTIVITYBAPI_BUS2002_ACT_CHGActivity changesYes
IT_UPDATE_ACTIVITYBAPI_BUS2002_ACT_UPDActivity change flagsYes
ET_RETURNBAPIRET2Return messages—
EXTENSIONINBAPIPAREXCustomer fields (inbound)—

Call template (ABAP)

A skeleton generated from the interface. It lists mandatory importing parameters, exporting parameters and tables; declare the variables with suitable types in your own program.

CALL FUNCTION 'BAPI_BUS2002_ACT_CHANGE_MULTI'
  EXPORTING
    i_number = lv_i_number
  TABLES
    it_activity = lt_it_activity
    it_update_activity = lt_it_update_activity
    et_return = lt_et_return
    extensionin = lt_extensionin.

Related tables

Can't find the report you need?

We also build anything that is not in the catalog. Describe it briefly and we will suggest the right solution.

Request a custom report