BOM, Routing and Production Version Pack
Short answer: A five-component pack that loads, changes and audits production master data: mass routing creation from Excel, mass BOM component changes, an audit of routing standard value changes, open orders using expired or locked versions, and a missing production version check. Installation is a single transport.
- Installation and adaptation
- XL · 14–20 working days
- Version
- 1.0
- What's in the package
- 5 components
- Scope
- Global
- Built by
- NeKuDos Teknoloji
- Last updated
Why a package?
BOMs, routings and production versions depend on each other: a routing is loaded but no version is created, a component is replaced but open orders keep the old one, a standard time changes and the costing team never hears about it. With separate tools, these links break. The pack combines the upload programs with the control reports on the same plant and material selection; the master data team loads the change, checks version consistency on the same day and sees who made time changes that affect product costs.
Who uses it? Manufacturing engineering, work scheduling, production master data teams and product cost controllers.
What's in the package
Load: routing creation with operations, work centers and standard values
Mass Routing Creation Upload Program from Excel
A custom program that creates material routings in bulk from operation rows in an Excel or CSV file, with header, operations, work centers, control …
Change: mass BOM component replacement and affected open orders
Mass BOM Component Replacement Upload Program
A custom program that replaces, adds or deletes components or updates quantities in many material BOMs from Excel or CSV rows. Validity is set with a …
Audit: standard value changes, the user who made them and the change percentage
Routing Standard Value Change Audit Report
A custom ALV report that lists operations changed in routings within a date range, with the old and new setup, machine and labor standard values, the …
Consistency: materials with missing versions or versions pointing to deleted routings
Missing Production Versions Check Report for S/4HANA Migration
A custom ALV report that compares BOM alternatives, routings and production versions of in-house produced materials and lists, with a finding code, …
Impact: production and planned orders using expiring versions
Orders Using Expired or Locked Production Versions Report
A custom ALV report that checks production versions against their validity dates, lock status and the validity of the BOM and routing they point to, …
What you receive
- Transport request: ABAP source code, transaction codes and message class
- Routing and BOM change upload templates (Excel/CSV)
- Installation and user guide (TR/EN)
- Field, control key and authorization adjustment for your system
- User training
- Compatibility
- SAP ECC 6.0 and S/4HANA (on-premise and Private Edition). BOM, routing and production version tables keep the same structure. Because MRP on S/4HANA requires production versions, the version check is used both before a conversion and in daily master data work.
- License
- One-time license; the source code stays with you. Optional yearly support and updates.
Version history
- v1.0 First release: two upload programs, three control reports and a shared plant selection.
Features
- Delivered as a transport request
- Test mode (check without posting) Routing and BOM uploads show in test mode what will change, without saving.
- Download failed lines as a separate file Rows that could not be loaded are written to a separate file to be corrected and loaded again.
- Send the result by email Standard value changes can be sent to the costing team every week.
- Export to Excel The version check result can be downloaded as an Excel template for mass correction.
Frequently asked questions
Are BOM changes made with a change number?
Yes. The valid-from date is set with a change number; test mode shows what will change in each BOM and how many open orders still use the old component.
Does the pack create missing production versions itself?
No. For materials with one BOM and one routing, the check report shows the proposed version on the line and provides the result as a mass upload template; the versions are created with your approval.
Can I buy the components separately?
Yes. Each component is also offered on its own page; the pack gives a shared selection screen and faster installation with one transport.
Related reports
S/4HANA Conversion Readiness Pack
A five-component pack that finds the master data and finance inconsistencies to clean up before a system conversion from ECC to S/4HANA: business …
Customer Complaint and Root Cause Pack
A five-component pack that follows a customer complaint from intake to improvement: automatic complaint notifications from a portal or call centre …
Let us install this package on your system
Briefly describe your system and expectations. We will clarify the scope and come back with an effort and price quote.