{"audience":"Manufacturing engineering, work scheduling, production master data teams and product cost controllers.","authorization_objects":[],"compatibility":"SAP ECC 6.0 and S/4HANA (on-premise and Private Edition). BOM, routing and production version tables keep the same structure. Because MRP on S/4HANA requires production versions, the version check is used both before a conversion and in daily master data work.","components":[{"id":"pp-routing-mass-upload","note":"Load: routing creation with operations, work centers and standard values","title":"Mass Routing Creation Upload Program from Excel","url":"https://nekuhub.com/en/programs/mass-routing-creation-upload-from-excel-program/"},{"id":"pp-bom-component-mass-change-upload","note":"Change: mass BOM component replacement and affected open orders","title":"Mass BOM Component Replacement Upload Program","url":"https://nekuhub.com/en/programs/mass-bom-component-replacement-upload-program/"},{"id":"pp-routing-standard-value-change-audit","note":"Audit: standard value changes, the user who made them and the change percentage","title":"Routing Standard Value Change Audit Report","url":"https://nekuhub.com/en/reports/routing-standard-value-change-history-report/"},{"id":"pp-production-version-readiness-s4","note":"Consistency: materials with missing versions or versions pointing to deleted routings","title":"Missing Production Versions Check Report for S/4HANA Migration","url":"https://nekuhub.com/en/reports/missing-production-versions-s4hana-migration-check-report/"},{"id":"pp-expired-production-version-orders","note":"Impact: production and planned orders using expiring versions","title":"Orders Using Expired or Locked Production Versions Report","url":"https://nekuhub.com/en/reports/production-orders-with-expired-or-locked-production-version-report/"}],"countries":[],"deliverables":"- Transport request: ABAP source code, transaction codes and message class\n- Routing and BOM change upload templates (Excel/CSV)\n- Installation and user guide (TR/EN)\n- Field, control key and authorization adjustment for your system\n- User training","effort_days_max":20,"effort_days_min":14,"effort_size":"XL","faq":[{"a":"Yes. The valid-from date is set with a change number; test mode shows what will change in each BOM and how many open orders still use the old component.","q":"Are BOM changes made with a change number?"},{"a":"No. For materials with one BOM and one routing, the check report shows the proposed version on the line and provides the result as a mass upload template; the versions are created with your approval.","q":"Does the pack create missing production versions itself?"},{"a":"Yes. Each component is also offered on its own page; the pack gives a shared selection screen and faster installation with one transport.","q":"Can I buy the components separately?"}],"features":[{"code":"transport","label":"Delivered as a transport request","note":""},{"code":"test_run","label":"Test mode (check without posting)","note":"Routing and BOM uploads show in test mode what will change, without saving."},{"code":"error_file","label":"Download failed lines as a separate file","note":"Rows that could not be loaded are written to a separate file to be corrected and loaded again."},{"code":"email","label":"Send the result by email","note":"Standard value changes can be sent to the costing team every week."},{"code":"excel","label":"Export to Excel","note":"The version check result can be downloaded as an Excel template for mass correction."}],"functions":[],"gap":"BOMs, routings and production versions depend on each other: a routing is loaded but no version is created, a component is replaced but open orders keep the old one, a standard time changes and the costing team never hears about it. With separate tools, these links break. The pack combines the upload programs with the control reports on the same plant and material selection; the master data team loads the change, checks version consistency on the same day and sees who made time changes that affect product costs.","id":"pp-production-master-data-pack","industries":[],"input_columns":[],"kind":"package","language":"en","lastmod":"2026-11-17","license":"One-time license; the source code stays with you. Optional yearly support and updates.","module":"PP","object_type":"package","output_columns":[],"parameters":[],"part_of":[],"quote_url":"https://nekuhub.com/en/request-a-quote/?report=pp-production-master-data-pack","related":["ca-s4hana-conversion-readiness-pack","qm-complaint-root-cause-pack"],"releases":[{"notes":"First release: two upload programs, three control reports and a shared plant selection.","released_at":"2026-11-17","version":"1.0"}],"source":"custom","standard_alternatives":[],"summary":"A five-component pack that loads, changes and audits production master data: mass routing creation from Excel, mass BOM component changes, an audit of routing standard value changes, open orders using expired or locked versions, and a missing production version check. Installation is a single transport.","tables":[],"title":"BOM, Routing and Production Version Pack","url":"https://nekuhub.com/en/packages/bom-routing-and-production-version-pack/","vendor_id":"nekudos","version":"1.0"}