{"audience":"Controllers, budget owners, cost center managers and cost accountants.","authorization_objects":[],"compatibility":"SAP ECC 6.0 and S/4HANA (on-premise and Private Edition) systems that use classic cost center planning. On S/4HANA, actuals are read from ACDOCA and the COSP and COSS compatibility views.","components":[{"id":"co-cost-center-plan-upload","note":"Planning: yearly cost plan uploaded from Excel","title":"Cost Center Cost Plan Upload from Excel","url":"https://nekuhub.com/en/programs/cost-center-cost-plan-upload-from-excel/"},{"id":"co-cost-center-plan-actual-commitment","note":"Tracking: plan, actual and commitments with the remaining budget","title":"Cost Center Plan vs Actual with Commitments Report","url":"https://nekuhub.com/en/reports/cost-center-plan-actual-commitment-report/"},{"id":"co-activity-price-absorption","note":"Rates: activity type plan and actual rate, under- and over-absorption","title":"Activity Type Plan vs Actual Rate and Under/Over-Absorption Report","url":"https://nekuhub.com/en/reports/activity-plan-vs-actual-rate-absorption-report/"}],"countries":[],"deliverables":"- Transport request: ABAP source code, transaction codes and message class\n- Excel template and filling guide for the plan upload\n- Shared controlling area, cost center group and version selection\n- Installation and user guide (TR/EN)\n- Field and authorization adjustment for your system\n- User training","effort_days_max":11,"effort_days_min":7,"effort_size":"L","faq":[{"a":"Yes. The version is given on the selection screen or in the file; budget and forecast versions are uploaded with the same template and compared in the reports.","q":"Can several plan versions be uploaded?"},{"a":"Yes. The reports check the standard cost center authorization object; a manager sees only the cost centers they are authorized for, and the email summary follows the same rule.","q":"Do cost center managers see only their own cost centers?"},{"a":"Yes. Each solution is also offered on its own page; the pack goes live faster with a shared selection screen and one installation.","q":"Can I buy the solutions separately?"}],"features":[{"code":"transport","label":"Delivered as a transport request","note":""},{"code":"test_run","label":"Test mode (check without posting)","note":"The plan file is checked first without posting."},{"code":"error_file","label":"Download failed lines as a separate file","note":""},{"code":"background","label":"Runs as a background job","note":"Both reports run together in the month-end job."},{"code":"email","label":"Send the result by email","note":"Cost center managers receive a summary of their own cost centers."}],"functions":[],"gap":"The budget is prepared in Excel, keyed into SAP by hand and tracked during the year with other reports; the plan version and cost center group are chosen again at every step. The pack ties the plan upload program and the two reports that follow it to the same selection: the uploaded plan is compared with actuals and commitments at month end, and activity rates with the costs actually incurred.","id":"co-cost-center-controlling-pack","industries":[],"input_columns":[],"kind":"package","language":"en","lastmod":"2026-11-17","license":"One-time license; the source code stays with you. Optional yearly support and updates.","module":"CO","object_type":"package","output_columns":[],"parameters":[],"part_of":[],"process":"R2R","quote_url":"https://nekuhub.com/en/request-a-quote/?report=co-cost-center-controlling-pack","related":["co-product-cost-variance-pack","ps-project-controlling-pack","r2r-month-end-close-pack"],"releases":[{"notes":"First release: plan upload program, two reports and a shared version selection.","released_at":"2026-11-17","version":"1.0"}],"source":"custom","standard_alternatives":[],"summary":"A three-solution pack that covers the cost center planning cycle from start to end: plan upload from Excel, plan vs actual vs commitment comparison and activity type rate absorption analysis. All three use the same controlling area, cost center group and plan version selection.","tables":[],"title":"Cost Center Planning and Controlling Pack","url":"https://nekuhub.com/en/packages/cost-center-planning-and-controlling-pack/","vendor_id":"nekudos","version":"1.0"}