# Cost Center Planning and Controlling Pack

> A three-solution pack that covers the cost center planning cycle from start to end: plan upload from Excel, plan vs actual vs commitment comparison and activity type rate absorption analysis. All three use the same controlling area, cost center group and plan version selection.

- Type: Package, Custom development
- Module: CO
- Installation and adaptation: L (7–11 working days)
- Version: 1.0
- Last updated: 2026-11-17
- URL: https://nekuhub.com/en/packages/cost-center-planning-and-controlling-pack/


## Why a package?

The budget is prepared in Excel, keyed into SAP by hand and tracked during the year with other reports; the plan version and cost center group are chosen again at every step. The pack ties the plan upload program and the two reports that follow it to the same selection: the uploaded plan is compared with actuals and commitments at month end, and activity rates with the costs actually incurred.

## What's in the package

- Cost Center Cost Plan Upload from Excel (https://nekuhub.com/en/programs/cost-center-cost-plan-upload-from-excel/): Planning: yearly cost plan uploaded from Excel
- Cost Center Plan vs Actual with Commitments Report (https://nekuhub.com/en/reports/cost-center-plan-actual-commitment-report/): Tracking: plan, actual and commitments with the remaining budget
- Activity Type Plan vs Actual Rate and Under/Over-Absorption Report (https://nekuhub.com/en/reports/activity-plan-vs-actual-rate-absorption-report/): Rates: activity type plan and actual rate, under- and over-absorption

## What you receive

- Transport request: ABAP source code, transaction codes and message class
- Excel template and filling guide for the plan upload
- Shared controlling area, cost center group and version selection
- Installation and user guide (TR/EN)
- Field and authorization adjustment for your system
- User training

- Compatibility: SAP ECC 6.0 and S/4HANA (on-premise and Private Edition) systems that use classic cost center planning. On S/4HANA, actuals are read from ACDOCA and the COSP and COSS compatibility views.
- License: One-time license; the source code stays with you. Optional yearly support and updates.

## Version history

- v1.0 (2026-11-17): First release: plan upload program, two reports and a shared version selection.

## Frequently asked questions

### Can several plan versions be uploaded?

Yes. The version is given on the selection screen or in the file; budget and forecast versions are uploaded with the same template and compared in the reports.

### Do cost center managers see only their own cost centers?

Yes. The reports check the standard cost center authorization object; a manager sees only the cost centers they are authorized for, and the email summary follows the same rule.

### Can I buy the solutions separately?

Yes. Each solution is also offered on its own page; the pack goes live faster with a shared selection screen and one installation.

---
Let us install this package on your system: https://nekuhub.com/en/request-a-quote/?report=co-cost-center-controlling-pack
