CO Package Custom development

Cost Center Reorganization Pack

Short answer: A four-component pack for rebuilding the cost center structure after an organizational change: mass cost center creation and change from Excel, cost centers with a missing or invalid profit center assignment, mass reposting of primary costs posted to the wrong object, and a sender-to-receiver statement of assessment and distribution cycles. Installation is a single transport.

Installation and adaptation
L · 8–12 working days
Version
1.0
What's in the package
4 components
Scope
Global
Built by
NeKuDos Teknoloji
Last updated

Why a package?

When a new department opens, two units merge or the profit center structure changes, the work is not done in one step: cost centers are created, linked to profit centers, costs that landed in the wrong place are moved, and someone checks that allocation cycles distribute correctly to the new structure. The pack links these four steps with one controlling area and standard hierarchy selection; the reorganization is completed as one project, and at the first month end cost center owners see the allocations they received in one list.

Who uses it? Controllers, cost accounting teams, CO master data owners and cost center owners.

What's in the package

Structure: mass upload of new and changed cost centers

Check: missing or invalid profit center assignments

Correction: moving costs posted to the wrong cost center

CO Program Custom Mass upload

Mass Primary Cost Reposting Upload from Excel

A custom program that moves primary costs posted to the wrong cost center or internal order to the right object in bulk from Excel rows. It reposts in …

COBK · COEP · CSKS · AUFK

Verification: amounts the allocation cycles pass to the new structure

What you receive

  • Transport request: ABAP source code, transaction codes and message class
  • Cost center and reposting upload templates (Excel/CSV)
  • Installation and user guide (TR/EN)
  • Field and authorization adjustment for your system
  • User training
Compatibility
SAP ECC 6.0 and S/4HANA (on-premise and Private Edition). Cost center master data keeps the same structure; on S/4HANA, CO actuals and reposting documents are read from ACDOCA.
License
One-time license; the source code stays with you. Optional yearly support and updates.

Version history

  1. v1.0 First release: two upload programs, two control reports and a shared controlling area selection.

Features

  • Delivered as a transport request
  • Test mode (check without posting) Both upload programs run in test mode first and show all checks without saving.
  • Line-by-line result and error log The result of every row and the CO document number created are kept in a log.
  • Download failed lines as a separate file Faulty rows are written to a separate file to be corrected and loaded again.
  • Send the result by email Cost center owners can receive the list of allocations they received.

Frequently asked questions

Does the reposting change the FI document?

No. Primary costs are reposted within CO; the original FI document is not changed and the CO document number created for each row is listed.

Does the pack change the allocation cycles?

No. Cycles are updated with the standard transactions; the report in the pack shows what the cycles distribute to the new structure, compared with the previous period.

Does the profit center check cover internal orders too?

Yes, optionally the profit center assignment of internal orders is checked with the same rules.

Related reports

PS Package Custom

Project Planning and Earned Value Pack

A four-component pack that brings the project plan into SAP and measures performance with earned value: WBS cost plan upload from Excel, transfer of …

4 components · v1.0

FI Package Custom

Currency Valuation and VAT Reconciliation Pack

A four-component pack that brings period-end valuation and tax checks together: daily automatic import of central bank exchange rates, an exchange …

4 components · v1.0

Let us install this package on your system

Briefly describe your system and expectations. We will clarify the scope and come back with an effort and price quote.

Related report: Cost Center Reorganization Pack