# Cost Center Reorganization Pack

> A four-component pack for rebuilding the cost center structure after an organizational change: mass cost center creation and change from Excel, cost centers with a missing or invalid profit center assignment, mass reposting of primary costs posted to the wrong object, and a sender-to-receiver statement of assessment and distribution cycles. Installation is a single transport.

- Type: Package, Custom development
- Module: CO
- Installation and adaptation: L (8–12 working days)
- Version: 1.0
- Last updated: 2026-11-17
- URL: https://nekuhub.com/en/packages/cost-center-reorganization-pack/


## Why a package?

When a new department opens, two units merge or the profit center structure changes, the work is not done in one step: cost centers are created, linked to profit centers, costs that landed in the wrong place are moved, and someone checks that allocation cycles distribute correctly to the new structure. The pack links these four steps with one controlling area and standard hierarchy selection; the reorganization is completed as one project, and at the first month end cost center owners see the allocations they received in one list.

## What's in the package

- Mass Cost Center Creation and Change Upload from Excel (https://nekuhub.com/en/programs/mass-cost-center-creation-upload-from-excel/): Structure: mass upload of new and changed cost centers
- Cost Centers with Missing or Invalid Profit Center Assignment Report (https://nekuhub.com/en/reports/cost-centers-missing-profit-center-assignment-report/): Check: missing or invalid profit center assignments
- Mass Primary Cost Reposting Upload from Excel (https://nekuhub.com/en/programs/mass-primary-cost-reposting-upload-from-excel/): Correction: moving costs posted to the wrong cost center
- Assessment and Distribution Cycle Sender-to-Receiver Report (https://nekuhub.com/en/reports/assessment-distribution-cycle-sender-receiver-report/): Verification: amounts the allocation cycles pass to the new structure

## What you receive

- Transport request: ABAP source code, transaction codes and message class
- Cost center and reposting upload templates (Excel/CSV)
- Installation and user guide (TR/EN)
- Field and authorization adjustment for your system
- User training

- Compatibility: SAP ECC 6.0 and S/4HANA (on-premise and Private Edition). Cost center master data keeps the same structure; on S/4HANA, CO actuals and reposting documents are read from ACDOCA.
- License: One-time license; the source code stays with you. Optional yearly support and updates.

## Version history

- v1.0 (2026-11-17): First release: two upload programs, two control reports and a shared controlling area selection.

## Frequently asked questions

### Does the reposting change the FI document?

No. Primary costs are reposted within CO; the original FI document is not changed and the CO document number created for each row is listed.

### Does the pack change the allocation cycles?

No. Cycles are updated with the standard transactions; the report in the pack shows what the cycles distribute to the new structure, compared with the previous period.

### Does the profit center check cover internal orders too?

Yes, optionally the profit center assignment of internal orders is checked with the same rules.

---
Let us install this package on your system: https://nekuhub.com/en/request-a-quote/?report=co-cost-center-reorganization-pack
