Short answer: A pack that delivers the four core indicators of the monthly maintenance review with one plant, work center and equipment selection: maintenance backlog, MTBF and MTTR, maintenance cost and downtime by equipment, and preventive maintenance compliance.

Installation and adaptation
XL · 10–16 working days
Version
1.0
What's in the package
4 components
Scope
Global
Built by
NeKuDos Teknoloji
Last updated

Why a package?

Maintenance indicators are often combined in Excel every month from different lists, and the equipment list and period are chosen again in every report. The pack runs the four reports with the same plant, work center and equipment selection; equipment that fails often, costs the most and misses planned maintenance is discussed side by side in one meeting.

Who uses it? Maintenance managers, maintenance planners, reliability engineers and plant managers.

What's in the package

Backlog: overdue maintenance orders by work center

Reliability: MTBF and MTTR by equipment

PM Report Custom ALV report

MTBF and MTTR Reliability Report by Equipment

A custom ALV report that calculates, from breakdown notifications, the number of breakdowns, total downtime, mean time to repair (MTTR), mean time …

QMIH · QMEL · QMFE · QMUR

Cost: maintenance cost and downtime by equipment

PM Report Custom ALV report

Maintenance Cost and Downtime by Equipment Report

A custom ALV report that splits the actual cost of maintenance orders per equipment in a period into labor, material, external services and other, and …

AFIH · AUFK · COEP · QMIH

Discipline: share of preventive maintenance done on time

PM Report Custom ALV report

Preventive Maintenance Compliance Report

A custom ALV report that shows per maintenance plan how many preventive maintenance calls due in a period were completed within tolerance, completed …

MHIS · MPLA · MPOS · AFIH

What you receive

  • Transport request: ABAP source code of the four reports, transaction codes and message class
  • Shared plant, work center and equipment selection screen
  • Installation and user guide (TR/EN)
  • Field, order type and authorization adjustment for your system
  • User training
Compatibility
SAP ECC 6.0 and S/4HANA (on-premise and Private Edition). PM tables keep the same structure; on S/4HANA, actual cost line items are read from ACDOCA.
License
One-time license; the source code stays with you. Optional yearly support and updates.

Version history

  1. v1.0 First release: four KPI reports and a shared equipment selection.

Features

  • Delivered as a transport request
  • Runs as a background job All four reports run in one job at the start of the month.
  • Send the result by email A monthly KPI summary is sent to maintenance and plant management.
  • Export to Excel
  • Double-click drill-down to the document

Frequently asked questions

Which notifications are MTBF and MTTR calculated from?

From maintenance notifications with the breakdown indicator set and the malfunction start and end times on them. Which notification types are included is decided with you during installation.

Can the indicators be seen by functional location as well?

Yes. A functional location can be given on the selection screen and results can be totaled by functional location; extra hierarchy levels are priced by effort range.

Can I buy the reports separately?

Yes. Each report is also offered on its own page; the pack goes live faster with a shared selection screen and one installation.

Related reports

CA Package Custom

Excel Mass Data Upload Pack

A pack that puts the five bulk uploads key users run most often into one upload structure: material master, equipment master with installation at a …

5 components · v1.0

PP Package Custom

Production Order Control Pack

A pack that combines four reports and one background program for the daily production meeting with one plant and MRP controller selection: overdue …

5 components · v1.0

Let us install this package on your system

Briefly describe your system and expectations. We will clarify the scope and come back with an effort and price quote.

Related report: Maintenance KPI Pack