CO Package Custom development

Product Cost and Production Variance Pack

Short answer: A four-report pack that shows where product cost variance comes from, with one plant and period selection: standard vs current cost estimate comparison, production order target vs actual variance, orders with consumption but no goods receipt, and scrap and yield by work center.

Installation and adaptation
XL · 10–16 working days
Version
1.0
What's in the package
4 components
Scope
Global
Built by
NeKuDos Teknoloji
Last updated

Why a package?

When the variance is calculated, its cause is usually searched in different places: price changes in the cost estimate, excess consumption on the order, scrap at the work center. The pack runs the four reports with the same plant and period; in the monthly cost meeting, a variance is split in one session into price, quantity, or an order that has no goods receipt yet.

Who uses it? Plant controllers, product costing specialists, production managers and cost accountants.

What's in the package

Price effect: standard vs current cost estimate by cost component

Order effect: target vs actual cost variance

Quantity effect: scrap and yield by work center

PP Report Custom ALV report

Scrap and Yield Analysis by Work Center Report

A custom ALV report that totals yield, scrap and rework from production confirmations per work center and operation, and compares the actual scrap …

AFRU · AFVC · AFVV · CRHD

Before month end: orders with consumption but no goods receipt

What you receive

  • Transport request: ABAP source code of the four reports, transaction codes and message class
  • Shared plant and period selection screen
  • Installation and user guide (TR/EN)
  • Field, cost component structure and authorization adjustment for your system
  • User training
Compatibility
SAP ECC 6.0 and S/4HANA (on-premise and Private Edition). On S/4HANA, product costing tables stay the same; material movements and actual costs are read from MATDOC, ACDOCA and the compatibility views.
License
One-time license; the source code stays with you. Optional yearly support and updates.

Version history

  1. v1.0 First release: four reports and a shared plant and period selection.

Features

  • Delivered as a transport request
  • Runs as a background job All four reports can run in one job before the variance calculation.
  • Double-click drill-down to the document
  • Export to Excel
  • User-specific layout variants

Frequently asked questions

Does the pack replace the standard variance calculation?

No. Variance calculation and settlement run in the standard process. The pack shows the orders to fix before the calculation and the cause of the variance.

What if our cost component structure is different?

During installation your cost component structure is read and the comparison columns are set up for it; extra breakdowns are priced by effort range.

Can I buy the reports separately?

Yes. Each report is also offered on its own page; the pack goes live faster with a shared selection screen and one installation.

Related reports

CO Package Custom

Cost Center Planning and Controlling Pack

A three-solution pack that covers the cost center planning cycle from start to end: plan upload from Excel, plan vs actual vs commitment comparison …

3 components · v1.0

PP Package Custom

Production Order Control Pack

A pack that combines four reports and one background program for the daily production meeting with one plant and MRP controller selection: overdue …

5 components · v1.0

FI Package Custom

Month-End Close Control Pack

A pack that lists the five topics to clean up before the close with one company code and period selection: parked documents, unmatched bank items, …

5 components · v1.0

Let us install this package on your system

Briefly describe your system and expectations. We will clarify the scope and come back with an effort and price quote.

Related report: Product Cost and Production Variance Pack