{"audience":"Plant controllers, product costing specialists, production managers and cost accountants.","authorization_objects":[],"compatibility":"SAP ECC 6.0 and S/4HANA (on-premise and Private Edition). On S/4HANA, product costing tables stay the same; material movements and actual costs are read from MATDOC, ACDOCA and the compatibility views.","components":[{"id":"co-cost-estimate-comparison","note":"Price effect: standard vs current cost estimate by cost component","title":"Standard vs Current Cost Estimate Comparison by Cost Component","url":"https://nekuhub.com/en/reports/standard-vs-current-cost-estimate-comparison-report/"},{"id":"co-production-order-variance","note":"Order effect: target vs actual cost variance","title":"Production Order Target vs Actual Cost Variance Report","url":"https://nekuhub.com/en/reports/production-order-cost-variance-report/"},{"id":"pp-scrap-yield-by-work-center","note":"Quantity effect: scrap and yield by work center","title":"Scrap and Yield Analysis by Work Center Report","url":"https://nekuhub.com/en/reports/scrap-and-yield-by-work-center-report/"},{"id":"pp-consumption-without-goods-receipt","note":"Before month end: orders with consumption but no goods receipt","title":"Production Orders with Consumption but No Goods Receipt Report","url":"https://nekuhub.com/en/reports/production-orders-with-consumption-but-no-goods-receipt-report/"}],"countries":[],"deliverables":"- Transport request: ABAP source code of the four reports, transaction codes and message class\n- Shared plant and period selection screen\n- Installation and user guide (TR/EN)\n- Field, cost component structure and authorization adjustment for your system\n- User training","effort_days_max":16,"effort_days_min":10,"effort_size":"XL","faq":[{"a":"No. Variance calculation and settlement run in the standard process. The pack shows the orders to fix before the calculation and the cause of the variance.","q":"Does the pack replace the standard variance calculation?"},{"a":"During installation your cost component structure is read and the comparison columns are set up for it; extra breakdowns are priced by effort range.","q":"What if our cost component structure is different?"},{"a":"Yes. Each report is also offered on its own page; the pack goes live faster with a shared selection screen and one installation.","q":"Can I buy the reports separately?"}],"features":[{"code":"transport","label":"Delivered as a transport request","note":""},{"code":"background","label":"Runs as a background job","note":"All four reports can run in one job before the variance calculation."},{"code":"drilldown","label":"Double-click drill-down to the document","note":""},{"code":"excel","label":"Export to Excel","note":""},{"code":"layout","label":"User-specific layout variants","note":""}],"functions":[],"gap":"When the variance is calculated, its cause is usually searched in different places: price changes in the cost estimate, excess consumption on the order, scrap at the work center. The pack runs the four reports with the same plant and period; in the monthly cost meeting, a variance is split in one session into price, quantity, or an order that has no goods receipt yet.","id":"co-product-cost-variance-pack","industries":[],"input_columns":[],"kind":"package","language":"en","lastmod":"2026-11-17","license":"One-time license; the source code stays with you. Optional yearly support and updates.","module":"CO","object_type":"package","output_columns":[],"parameters":[],"part_of":[],"process":"R2R","quote_url":"https://nekuhub.com/en/request-a-quote/?report=co-product-cost-variance-pack","related":["co-cost-center-controlling-pack","pp-production-control-pack","r2r-month-end-close-pack"],"releases":[{"notes":"First release: four reports and a shared plant and period selection.","released_at":"2026-11-17","version":"1.0"}],"source":"custom","standard_alternatives":[],"summary":"A four-report pack that shows where product cost variance comes from, with one plant and period selection: standard vs current cost estimate comparison, production order target vs actual variance, orders with consumption but no goods receipt, and scrap and yield by work center.","tables":[],"title":"Product Cost and Production Variance Pack","url":"https://nekuhub.com/en/packages/product-cost-and-production-variance-pack/","vendor_id":"nekudos","version":"1.0"}