Production Order Control Pack

Short answer: A pack that combines four reports and one background program for the daily production meeting with one plant and MRP controller selection: overdue orders, missing parts, weekly capacity load, COGI errors and automatic technical completion of finished orders.

Installation and adaptation
XL · 12–18 working days
Version
1.0
What's in the package
5 components
Scope
Global
Built by
NeKuDos Teknoloji
Last updated

Why a package?

In the production meeting, delays, material shortages and capacity problems are usually discussed from separate screens, and the same order is looked up in three lists. The pack runs the reports with the same plant, MRP controller and work center selection; whether an overdue order is waiting for parts or for capacity is seen in one session. The automatic TECO program keeps the lists clean by closing finished orders.

Who uses it? Production planners, MRP controllers, shift supervisors and production managers.

What's in the package

Overdue orders and remaining quantity

Missing parts and the purchase orders that cover them

Weekly capacity load by work center

PP Report Custom ALV report

Weekly Capacity Load by Work Center Report

A custom ALV report that shows, for every work center of the selected plant, the available capacity, the production order and planned order load and …

KBED · CRHD · CRCA · KAKO

Failed movements from confirmations waiting in COGI

PP Report Custom ALV report

COGI Failed Goods Movements Aging Report

A custom ALV report that groups the backflush and automatic goods receipt errors waiting in COGI by age, error reason and material, and flags which of …

AFFW · T100 · MARD · MAKT

Automatic technical completion of finished orders

What you receive

  • Transport request: ABAP source code of the four reports and the TECO program, transaction codes and message class
  • Shared plant, MRP controller and work center selection screen
  • Sample variant for the TECO background job
  • Installation and user guide (TR/EN)
  • Field, order type and authorization adjustment for your system
  • User training
Compatibility
SAP ECC 6.0 and S/4HANA (on-premise and Private Edition). Production order and capacity tables keep the same structure; on S/4HANA, stock is read from material documents through a compatibility view.
License
One-time license; the source code stays with you. Optional yearly support and updates.

Version history

  1. v1.0 First release: four reports, the TECO program and a shared plant selection.

Features

  • Delivered as a transport request
  • Runs as a background job The reports run before the shift starts and the TECO program runs at night.
  • Test mode (check without posting) The TECO program first lists the orders it would complete.
  • Line-by-line result and error log
  • Double-click drill-down to the document

Frequently asked questions

Which orders does the TECO program complete?

Only orders that meet the rules set during installation, for example fully delivered orders with no open reservations and no pending COGI entries. In test mode the list is shown first.

Are process orders (PP-PI) supported as well?

The pack is built for production orders. If process orders are used, the order category and table differences are assessed during installation and the adaptation is priced by effort range.

Can I buy the solutions separately?

Yes. Each solution is also offered on its own page; the pack goes live faster with a shared selection screen and one installation.

Related reports

CO Package Custom

Product Cost and Production Variance Pack

A four-report pack that shows where product cost variance comes from, with one plant and period selection: standard vs current cost estimate …

4 components · v1.0

MM Package Custom

Inventory Control and GR/IR Pack

A five-report pack that tracks stock value and stock accuracy with one plant and storage location selection: stock aging, materials below safety …

5 components · v1.0

QM Package Custom

Quality Management Control Pack

A five-report pack for the weekly quality meeting: inspection lots awaiting a usage decision, decisions made before all results were recorded, blocked …

5 components · v1.0

Let us install this package on your system

Briefly describe your system and expectations. We will clarify the scope and come back with an effort and price quote.

Related report: Production Order Control Pack