{"audience":"Production planners, MRP controllers, shift supervisors and production managers.","authorization_objects":[],"compatibility":"SAP ECC 6.0 and S/4HANA (on-premise and Private Edition). Production order and capacity tables keep the same structure; on S/4HANA, stock is read from material documents through a compatibility view.","components":[{"id":"pp-overdue-production-orders","note":"Overdue orders and remaining quantity","title":"Overdue Production Orders and Remaining Quantity Report","url":"https://nekuhub.com/en/reports/overdue-production-orders-report/"},{"id":"pp-missing-parts-with-covering-po","note":"Missing parts and the purchase orders that cover them","title":"Production Order Missing Parts with Covering Purchase Order Report","url":"https://nekuhub.com/en/reports/production-order-missing-parts-with-open-purchase-order-report/"},{"id":"pp-weekly-capacity-load-by-work-center","note":"Weekly capacity load by work center","title":"Weekly Capacity Load by Work Center Report","url":"https://nekuhub.com/en/reports/weekly-capacity-load-by-work-center-report/"},{"id":"pp-cogi-failed-goods-movements-aging","note":"Failed movements from confirmations waiting in COGI","title":"COGI Failed Goods Movements Aging Report","url":"https://nekuhub.com/en/reports/cogi-failed-goods-movements-aging-report/"},{"id":"pp-auto-teco-production-orders","note":"Automatic technical completion of finished orders","title":"Automatic Technical Completion (TECO) of Production Orders Program","url":"https://nekuhub.com/en/programs/automatic-production-order-technical-completion-program/"}],"countries":[],"deliverables":"- Transport request: ABAP source code of the four reports and the TECO program, transaction codes and message class\n- Shared plant, MRP controller and work center selection screen\n- Sample variant for the TECO background job\n- Installation and user guide (TR/EN)\n- Field, order type and authorization adjustment for your system\n- User training","effort_days_max":18,"effort_days_min":12,"effort_size":"XL","faq":[{"a":"Only orders that meet the rules set during installation, for example fully delivered orders with no open reservations and no pending COGI entries. In test mode the list is shown first.","q":"Which orders does the TECO program complete?"},{"a":"The pack is built for production orders. If process orders are used, the order category and table differences are assessed during installation and the adaptation is priced by effort range.","q":"Are process orders (PP-PI) supported as well?"},{"a":"Yes. Each solution is also offered on its own page; the pack goes live faster with a shared selection screen and one installation.","q":"Can I buy the solutions separately?"}],"features":[{"code":"transport","label":"Delivered as a transport request","note":""},{"code":"background","label":"Runs as a background job","note":"The reports run before the shift starts and the TECO program runs at night."},{"code":"test_run","label":"Test mode (check without posting)","note":"The TECO program first lists the orders it would complete."},{"code":"log","label":"Line-by-line result and error log","note":""},{"code":"drilldown","label":"Double-click drill-down to the document","note":""}],"functions":[],"gap":"In the production meeting, delays, material shortages and capacity problems are usually discussed from separate screens, and the same order is looked up in three lists. The pack runs the reports with the same plant, MRP controller and work center selection; whether an overdue order is waiting for parts or for capacity is seen in one session. The automatic TECO program keeps the lists clean by closing finished orders.","id":"pp-production-control-pack","industries":[],"input_columns":[],"kind":"package","language":"en","lastmod":"2026-11-17","license":"One-time license; the source code stays with you. Optional yearly support and updates.","module":"PP","object_type":"package","output_columns":[],"parameters":[],"part_of":[],"quote_url":"https://nekuhub.com/en/request-a-quote/?report=pp-production-control-pack","related":["co-product-cost-variance-pack","inv-inventory-control-pack","qm-quality-control-pack"],"releases":[{"notes":"First release: four reports, the TECO program and a shared plant selection.","released_at":"2026-11-17","version":"1.0"}],"source":"custom","standard_alternatives":[],"summary":"A pack that combines four reports and one background program for the daily production meeting with one plant and MRP controller selection: overdue orders, missing parts, weekly capacity load, COGI errors and automatic technical completion of finished orders.","tables":[],"title":"Production Order Control Pack","url":"https://nekuhub.com/en/packages/production-order-control-pack/","vendor_id":"nekudos","version":"1.0"}