# Production Order Control Pack

> A pack that combines four reports and one background program for the daily production meeting with one plant and MRP controller selection: overdue orders, missing parts, weekly capacity load, COGI errors and automatic technical completion of finished orders.

- Type: Package, Custom development
- Module: PP
- Installation and adaptation: XL (12–18 working days)
- Version: 1.0
- Last updated: 2026-11-17
- URL: https://nekuhub.com/en/packages/production-order-control-pack/


## Why a package?

In the production meeting, delays, material shortages and capacity problems are usually discussed from separate screens, and the same order is looked up in three lists. The pack runs the reports with the same plant, MRP controller and work center selection; whether an overdue order is waiting for parts or for capacity is seen in one session. The automatic TECO program keeps the lists clean by closing finished orders.

## What's in the package

- Overdue Production Orders and Remaining Quantity Report (https://nekuhub.com/en/reports/overdue-production-orders-report/): Overdue orders and remaining quantity
- Production Order Missing Parts with Covering Purchase Order Report (https://nekuhub.com/en/reports/production-order-missing-parts-with-open-purchase-order-report/): Missing parts and the purchase orders that cover them
- Weekly Capacity Load by Work Center Report (https://nekuhub.com/en/reports/weekly-capacity-load-by-work-center-report/): Weekly capacity load by work center
- COGI Failed Goods Movements Aging Report (https://nekuhub.com/en/reports/cogi-failed-goods-movements-aging-report/): Failed movements from confirmations waiting in COGI
- Automatic Technical Completion (TECO) of Production Orders Program (https://nekuhub.com/en/programs/automatic-production-order-technical-completion-program/): Automatic technical completion of finished orders

## What you receive

- Transport request: ABAP source code of the four reports and the TECO program, transaction codes and message class
- Shared plant, MRP controller and work center selection screen
- Sample variant for the TECO background job
- Installation and user guide (TR/EN)
- Field, order type and authorization adjustment for your system
- User training

- Compatibility: SAP ECC 6.0 and S/4HANA (on-premise and Private Edition). Production order and capacity tables keep the same structure; on S/4HANA, stock is read from material documents through a compatibility view.
- License: One-time license; the source code stays with you. Optional yearly support and updates.

## Version history

- v1.0 (2026-11-17): First release: four reports, the TECO program and a shared plant selection.

## Frequently asked questions

### Which orders does the TECO program complete?

Only orders that meet the rules set during installation, for example fully delivered orders with no open reservations and no pending COGI entries. In test mode the list is shown first.

### Are process orders (PP-PI) supported as well?

The pack is built for production orders. If process orders are used, the order category and table differences are assessed during installation and the adaptation is priced by effort range.

### Can I buy the solutions separately?

Yes. Each solution is also offered on its own page; the pack goes live faster with a shared selection screen and one installation.

---
Let us install this package on your system: https://nekuhub.com/en/request-a-quote/?report=pp-production-control-pack
