PS Package Custom development

Project Closing Control Pack

Short answer: A five-component pack for closing projects without leaving open items behind: a technical completion readiness check, reconciliation of project revenue with sales order billing, balances left on technically completed WBS elements, project stock left on closed WBS elements, and mass TECO and CLSD for the WBS elements that pass the checks. Installation is a single transport.

Installation and adaptation
XL · 13–19 working days
Version
1.0
What's in the package
5 components
Scope
Global
Built by
NeKuDos Teknoloji
Last updated

Why a package?

Closing a project is not a single status change: if open orders, reservations, unbilled dates, unsettled balances and stock left on the project are not cleared one by one, costs land on the closed project later. The pack gathers the pre-closing checks, the revenue reconciliation and the stock and balance lists on one project selection and closes the ones that pass in bulk. Closing is done with one checklist, and fewer surprises appear afterwards.

Who uses it? Project controllers, project accounting, project managers and period-end closing teams.

What's in the package

Readiness: open orders, requisitions, reservations and billing dates

Revenue: order value, amount billed and revenue posted to the project

Balance: unsettled amount on technically completed WBS elements

Stock: project stock left on closed WBS elements

Close: mass TECO and CLSD for those that pass the checks

What you receive

  • Transport request: ABAP source code, transaction codes and message class
  • Background job variant for the mass status change
  • Installation and user guide (TR/EN)
  • Status profile, field and authorization adjustment for your system
  • User training
Compatibility
SAP ECC 6.0 and S/4HANA systems (on-premise and Private Edition) that use classic Project System. On S/4HANA, actual costs and revenue are read from ACDOCA and sales document statuses from VBAK and VBAP fields.
License
One-time license; the source code stays with you. Optional yearly support and updates.

Version history

  1. v1.0 First release: four control reports, the mass status change program and a shared project selection.

Features

  • Delivered as a transport request
  • Test mode (check without posting) In test mode, the mass status change shows which WBS element cannot be closed and why.
  • Line-by-line result and error log The status set or the rejection reason for each WBS element is kept in a log.
  • Send the result by email Items blocking the close can be sent to project managers.
  • Double-click drill-down to the document Blocking rows drill down to the related order, reservation or billing plan.

Frequently asked questions

Does the mass close change statuses without checks?

No. WBS elements with open commitments, a non-zero balance or open networks are skipped and listed with their reasons; only those that pass the checks get TECO or CLSD.

What is suggested for stock left on the project?

The report gives a suggestion for every line, such as moving it to own stock, transferring it to another project or scrapping it; the movement is posted with standard transactions.

Can I buy the components separately?

Yes. Each component is also offered on its own page; the pack gives a shared selection screen and faster installation with one transport.

Related reports

PS Package Custom

Project Planning and Earned Value Pack

A four-component pack that brings the project plan into SAP and measures performance with earned value: WBS cost plan upload from Excel, transfer of …

4 components · v1.0

FI Package Custom

Currency Valuation and VAT Reconciliation Pack

A four-component pack that brings period-end valuation and tax checks together: daily automatic import of central bank exchange rates, an exchange …

4 components · v1.0

Let us install this package on your system

Briefly describe your system and expectations. We will clarify the scope and come back with an effort and price quote.

Related report: Project Closing Control Pack