{"audience":"Project controllers, project accounting, project managers and period-end closing teams.","authorization_objects":[],"compatibility":"SAP ECC 6.0 and S/4HANA systems (on-premise and Private Edition) that use classic Project System. On S/4HANA, actual costs and revenue are read from ACDOCA and sales document statuses from VBAK and VBAP fields.","components":[{"id":"ps-wbs-teco-readiness-check","note":"Readiness: open orders, requisitions, reservations and billing dates","title":"WBS Technical Completion (TECO) Readiness Check Report for Open Items","url":"https://nekuhub.com/en/reports/wbs-technical-completion-teco-readiness-check-report/"},{"id":"ps-project-revenue-vs-sales-order-billing","note":"Revenue: order value, amount billed and revenue posted to the project","title":"Project Revenue vs Sales Order Billing Reconciliation Report","url":"https://nekuhub.com/en/reports/project-revenue-sales-order-billing-reconciliation-report/"},{"id":"ps-closed-wbs-unsettled-balance","note":"Balance: unsettled amount on technically completed WBS elements","title":"Technically Completed WBS Elements with Unsettled Balance Report","url":"https://nekuhub.com/en/reports/technically-completed-wbs-unsettled-balance-report/"},{"id":"ps-project-stock-on-completed-wbs","note":"Stock: project stock left on closed WBS elements","title":"Project Stock Left on Technically Completed or Closed WBS Elements Report","url":"https://nekuhub.com/en/reports/project-stock-left-on-technically-completed-or-closed-wbs-elements-report/"},{"id":"ps-wbs-mass-status-change","note":"Close: mass TECO and CLSD for those that pass the checks","title":"Mass TECO and Close (CLSD) Status Change Program for WBS Elements","url":"https://nekuhub.com/en/programs/mass-teco-and-close-status-change-program-for-wbs-elements/"}],"countries":[],"deliverables":"- Transport request: ABAP source code, transaction codes and message class\n- Background job variant for the mass status change\n- Installation and user guide (TR/EN)\n- Status profile, field and authorization adjustment for your system\n- User training","effort_days_max":19,"effort_days_min":13,"effort_size":"XL","faq":[{"a":"No. WBS elements with open commitments, a non-zero balance or open networks are skipped and listed with their reasons; only those that pass the checks get TECO or CLSD.","q":"Does the mass close change statuses without checks?"},{"a":"The report gives a suggestion for every line, such as moving it to own stock, transferring it to another project or scrapping it; the movement is posted with standard transactions.","q":"What is suggested for stock left on the project?"},{"a":"Yes. Each component is also offered on its own page; the pack gives a shared selection screen and faster installation with one transport.","q":"Can I buy the components separately?"}],"features":[{"code":"transport","label":"Delivered as a transport request","note":""},{"code":"test_run","label":"Test mode (check without posting)","note":"In test mode, the mass status change shows which WBS element cannot be closed and why."},{"code":"log","label":"Line-by-line result and error log","note":"The status set or the rejection reason for each WBS element is kept in a log."},{"code":"email","label":"Send the result by email","note":"Items blocking the close can be sent to project managers."},{"code":"drilldown","label":"Double-click drill-down to the document","note":"Blocking rows drill down to the related order, reservation or billing plan."}],"functions":[],"gap":"Closing a project is not a single status change: if open orders, reservations, unbilled dates, unsettled balances and stock left on the project are not cleared one by one, costs land on the closed project later. The pack gathers the pre-closing checks, the revenue reconciliation and the stock and balance lists on one project selection and closes the ones that pass in bulk. Closing is done with one checklist, and fewer surprises appear afterwards.","id":"ps-project-closing-pack","industries":[],"input_columns":[],"kind":"package","language":"en","lastmod":"2026-11-17","license":"One-time license; the source code stays with you. Optional yearly support and updates.","module":"PS","object_type":"package","output_columns":[],"parameters":[],"part_of":[],"process":"R2R","quote_url":"https://nekuhub.com/en/request-a-quote/?report=ps-project-closing-pack","related":["ps-project-planning-earned-value-pack","r2r-currency-vat-reconciliation-pack"],"releases":[{"notes":"First release: four control reports, the mass status change program and a shared project selection.","released_at":"2026-11-17","version":"1.0"}],"source":"custom","standard_alternatives":[],"summary":"A five-component pack for closing projects without leaving open items behind: a technical completion readiness check, reconciliation of project revenue with sales order billing, balances left on technically completed WBS elements, project stock left on closed WBS elements, and mass TECO and CLSD for the WBS elements that pass the checks. Installation is a single transport.","tables":[],"title":"Project Closing Control Pack","url":"https://nekuhub.com/en/packages/project-closing-control-pack/","vendor_id":"nekudos","version":"1.0"}