# Project Closing Control Pack

> A five-component pack for closing projects without leaving open items behind: a technical completion readiness check, reconciliation of project revenue with sales order billing, balances left on technically completed WBS elements, project stock left on closed WBS elements, and mass TECO and CLSD for the WBS elements that pass the checks. Installation is a single transport.

- Type: Package, Custom development
- Module: PS
- Installation and adaptation: XL (13–19 working days)
- Version: 1.0
- Last updated: 2026-11-17
- URL: https://nekuhub.com/en/packages/project-closing-control-pack/


## Why a package?

Closing a project is not a single status change: if open orders, reservations, unbilled dates, unsettled balances and stock left on the project are not cleared one by one, costs land on the closed project later. The pack gathers the pre-closing checks, the revenue reconciliation and the stock and balance lists on one project selection and closes the ones that pass in bulk. Closing is done with one checklist, and fewer surprises appear afterwards.

## What's in the package

- WBS Technical Completion (TECO) Readiness Check Report for Open Items (https://nekuhub.com/en/reports/wbs-technical-completion-teco-readiness-check-report/): Readiness: open orders, requisitions, reservations and billing dates
- Project Revenue vs Sales Order Billing Reconciliation Report (https://nekuhub.com/en/reports/project-revenue-sales-order-billing-reconciliation-report/): Revenue: order value, amount billed and revenue posted to the project
- Technically Completed WBS Elements with Unsettled Balance Report (https://nekuhub.com/en/reports/technically-completed-wbs-unsettled-balance-report/): Balance: unsettled amount on technically completed WBS elements
- Project Stock Left on Technically Completed or Closed WBS Elements Report (https://nekuhub.com/en/reports/project-stock-left-on-technically-completed-or-closed-wbs-elements-report/): Stock: project stock left on closed WBS elements
- Mass TECO and Close (CLSD) Status Change Program for WBS Elements (https://nekuhub.com/en/programs/mass-teco-and-close-status-change-program-for-wbs-elements/): Close: mass TECO and CLSD for those that pass the checks

## What you receive

- Transport request: ABAP source code, transaction codes and message class
- Background job variant for the mass status change
- Installation and user guide (TR/EN)
- Status profile, field and authorization adjustment for your system
- User training

- Compatibility: SAP ECC 6.0 and S/4HANA systems (on-premise and Private Edition) that use classic Project System. On S/4HANA, actual costs and revenue are read from ACDOCA and sales document statuses from VBAK and VBAP fields.
- License: One-time license; the source code stays with you. Optional yearly support and updates.

## Version history

- v1.0 (2026-11-17): First release: four control reports, the mass status change program and a shared project selection.

## Frequently asked questions

### Does the mass close change statuses without checks?

No. WBS elements with open commitments, a non-zero balance or open networks are skipped and listed with their reasons; only those that pass the checks get TECO or CLSD.

### What is suggested for stock left on the project?

The report gives a suggestion for every line, such as moving it to own stock, transferring it to another project or scrapping it; the movement is posted with standard transactions.

### Can I buy the components separately?

Yes. Each component is also offered on its own page; the pack gives a shared selection screen and faster installation with one transport.

---