Project Planning and Earned Value Pack
Short answer: A four-component pack that brings the project plan into SAP and measures performance with earned value: WBS cost plan upload from Excel, transfer of the Primavera or MS Project schedule to network activities, plan cost compared with original and current budget, and CPI, SPI and estimate at completion per WBS element. Installation is a single transport.
- Installation and adaptation
- XL · 11–16 working days
- Version
- 1.0
- What's in the package
- 4 components
- Scope
- Global
- Built by
- NeKuDos Teknoloji
- Last updated
Why a package?
Earned value is only meaningful if the plan is current: if the cost plan stays in Excel and the schedule in another tool, CPI and SPI in SAP are calculated on old data. The pack first brings the cost plan and the schedule into SAP, then compares plan with budget and calculates earned value with the same project and WBS selection. In the monthly project meeting, plan, budget and performance are discussed on the same data.
Who uses it? Project controllers, project managers, planning engineers and PMO teams.
What's in the package
Cost plan: plan upload per WBS, cost element and period
WBS Element Cost Element Plan Upload from Excel Program
A custom program that loads the WBS × cost element × period plan prepared by project teams in Excel into SAP in one run, tests it first and returns a …
Schedule: transfer of duration, work and constraint dates to network activities
Primavera / MS Project Schedule Import to Network Activities Interface
A custom interface program that transfers activity duration, work and constraint dates updated in the scheduling tool (Primavera P6, MS Project or …
Budget: gap between plan cost and original and current budget
WBS Plan Cost vs Original Budget vs Current Budget Comparison Report
A custom ALV report that places the original budget, supplements, returns, budget transfers, current budget and plan cost of each WBS element side by …
Performance: PV, EV, AC, CPI, SPI and estimate at completion
Project Earned Value Report (CPI, SPI and Estimate at Completion)
A custom ALV report that shows, per WBS element, planned value (PV), earned value (EV), actual cost (AC), the cost and schedule performance indices …
What you receive
- Transport request: ABAP source code, transaction codes and message class
- Cost plan upload template and schedule file definition
- Installation and user guide (TR/EN)
- Plan version, field and authorization adjustment for your system
- User training
- Compatibility
- SAP ECC 6.0 and S/4HANA systems (on-premise and Private Edition) that use classic Project System. On S/4HANA, actual costs are read from ACDOCA. The schedule interface needs a file export from Primavera P6, MS Project or Excel.
- License
- One-time license; the source code stays with you. Optional yearly support and updates.
Version history
- v1.0 First release: two upload programs, two reports and a shared project selection.
Features
- Delivered as a transport request
- Test mode (check without posting) The cost plan and schedule transfer are checked in test mode first.
- Download failed lines as a separate file Plan and activity rows that could not be transferred are written to a separate file.
- Send the result by email WBS elements with a red light can be sent to project managers every month.
- Double-click drill-down to the document Performance rows drill down to the WBS element and the actual cost line items.
Frequently asked questions
Does earned value need a progress analysis setup?
No. The percentage of completion is derived from confirmed work hours on network activities, so it also works in systems without a standard progress analysis setup.
Does the schedule transfer overwrite the plan in SAP?
The transfer only updates duration, work and constraint dates of the activities in the file; test mode shows the fields that will change in advance.
Can I buy the components separately?
Yes. Each component is also offered on its own page; the pack gives a shared selection screen and faster installation with one transport.
Related reports
Cost Center Reorganization Pack
A four-component pack for rebuilding the cost center structure after an organizational change: mass cost center creation and change from Excel, cost …
Project Closing Control Pack
A five-component pack for closing projects without leaving open items behind: a technical completion readiness check, reconciliation of project …
Let us install this package on your system
Briefly describe your system and expectations. We will clarify the scope and come back with an effort and price quote.