{"audience":"Project controllers, project managers, planning engineers and PMO teams.","authorization_objects":[],"compatibility":"SAP ECC 6.0 and S/4HANA systems (on-premise and Private Edition) that use classic Project System. On S/4HANA, actual costs are read from ACDOCA. The schedule interface needs a file export from Primavera P6, MS Project or Excel.","components":[{"id":"ps-wbs-cost-plan-upload","note":"Cost plan: plan upload per WBS, cost element and period","title":"WBS Element Cost Element Plan Upload from Excel Program","url":"https://nekuhub.com/en/programs/wbs-element-cost-plan-upload-from-excel-program/"},{"id":"ps-schedule-import-network-activities","note":"Schedule: transfer of duration, work and constraint dates to network activities","title":"Primavera / MS Project Schedule Import to Network Activities Interface","url":"https://nekuhub.com/en/programs/primavera-ms-project-schedule-import-to-network-activities/"},{"id":"ps-wbs-plan-original-current-budget","note":"Budget: gap between plan cost and original and current budget","title":"WBS Plan Cost vs Original Budget vs Current Budget Comparison Report","url":"https://nekuhub.com/en/reports/wbs-plan-cost-original-current-budget-report/"},{"id":"ps-earned-value-cpi-spi","note":"Performance: PV, EV, AC, CPI, SPI and estimate at completion","title":"Project Earned Value Report (CPI, SPI and Estimate at Completion)","url":"https://nekuhub.com/en/reports/project-earned-value-cpi-spi-report/"}],"countries":[],"deliverables":"- Transport request: ABAP source code, transaction codes and message class\n- Cost plan upload template and schedule file definition\n- Installation and user guide (TR/EN)\n- Plan version, field and authorization adjustment for your system\n- User training","effort_days_max":16,"effort_days_min":11,"effort_size":"XL","faq":[{"a":"No. The percentage of completion is derived from confirmed work hours on network activities, so it also works in systems without a standard progress analysis setup.","q":"Does earned value need a progress analysis setup?"},{"a":"The transfer only updates duration, work and constraint dates of the activities in the file; test mode shows the fields that will change in advance.","q":"Does the schedule transfer overwrite the plan in SAP?"},{"a":"Yes. Each component is also offered on its own page; the pack gives a shared selection screen and faster installation with one transport.","q":"Can I buy the components separately?"}],"features":[{"code":"transport","label":"Delivered as a transport request","note":""},{"code":"test_run","label":"Test mode (check without posting)","note":"The cost plan and schedule transfer are checked in test mode first."},{"code":"error_file","label":"Download failed lines as a separate file","note":"Plan and activity rows that could not be transferred are written to a separate file."},{"code":"email","label":"Send the result by email","note":"WBS elements with a red light can be sent to project managers every month."},{"code":"drilldown","label":"Double-click drill-down to the document","note":"Performance rows drill down to the WBS element and the actual cost line items."}],"functions":[],"gap":"Earned value is only meaningful if the plan is current: if the cost plan stays in Excel and the schedule in another tool, CPI and SPI in SAP are calculated on old data. The pack first brings the cost plan and the schedule into SAP, then compares plan with budget and calculates earned value with the same project and WBS selection. In the monthly project meeting, plan, budget and performance are discussed on the same data.","id":"ps-project-planning-earned-value-pack","industries":[],"input_columns":[],"kind":"package","language":"en","lastmod":"2026-11-17","license":"One-time license; the source code stays with you. Optional yearly support and updates.","module":"PS","object_type":"package","output_columns":[],"parameters":[],"part_of":[],"quote_url":"https://nekuhub.com/en/request-a-quote/?report=ps-project-planning-earned-value-pack","related":["co-cost-center-reorganization-pack","ps-project-closing-pack"],"releases":[{"notes":"First release: two upload programs, two reports and a shared project selection.","released_at":"2026-11-17","version":"1.0"}],"source":"custom","standard_alternatives":[],"summary":"A four-component pack that brings the project plan into SAP and measures performance with earned value: WBS cost plan upload from Excel, transfer of the Primavera or MS Project schedule to network activities, plan cost compared with original and current budget, and CPI, SPI and estimate at completion per WBS element. Installation is a single transport.","tables":[],"title":"Project Planning and Earned Value Pack","url":"https://nekuhub.com/en/packages/project-planning-and-earned-value-pack/","vendor_id":"nekudos","version":"1.0"}