# Project Planning and Earned Value Pack

> A four-component pack that brings the project plan into SAP and measures performance with earned value: WBS cost plan upload from Excel, transfer of the Primavera or MS Project schedule to network activities, plan cost compared with original and current budget, and CPI, SPI and estimate at completion per WBS element. Installation is a single transport.

- Type: Package, Custom development
- Module: PS
- Installation and adaptation: XL (11–16 working days)
- Version: 1.0
- Last updated: 2026-11-17
- URL: https://nekuhub.com/en/packages/project-planning-and-earned-value-pack/


## Why a package?

Earned value is only meaningful if the plan is current: if the cost plan stays in Excel and the schedule in another tool, CPI and SPI in SAP are calculated on old data. The pack first brings the cost plan and the schedule into SAP, then compares plan with budget and calculates earned value with the same project and WBS selection. In the monthly project meeting, plan, budget and performance are discussed on the same data.

## What's in the package

- WBS Element Cost Element Plan Upload from Excel Program (https://nekuhub.com/en/programs/wbs-element-cost-plan-upload-from-excel-program/): Cost plan: plan upload per WBS, cost element and period
- Primavera / MS Project Schedule Import to Network Activities Interface (https://nekuhub.com/en/programs/primavera-ms-project-schedule-import-to-network-activities/): Schedule: transfer of duration, work and constraint dates to network activities
- WBS Plan Cost vs Original Budget vs Current Budget Comparison Report (https://nekuhub.com/en/reports/wbs-plan-cost-original-current-budget-report/): Budget: gap between plan cost and original and current budget
- Project Earned Value Report (CPI, SPI and Estimate at Completion) (https://nekuhub.com/en/reports/project-earned-value-cpi-spi-report/): Performance: PV, EV, AC, CPI, SPI and estimate at completion

## What you receive

- Transport request: ABAP source code, transaction codes and message class
- Cost plan upload template and schedule file definition
- Installation and user guide (TR/EN)
- Plan version, field and authorization adjustment for your system
- User training

- Compatibility: SAP ECC 6.0 and S/4HANA systems (on-premise and Private Edition) that use classic Project System. On S/4HANA, actual costs are read from ACDOCA. The schedule interface needs a file export from Primavera P6, MS Project or Excel.
- License: One-time license; the source code stays with you. Optional yearly support and updates.

## Version history

- v1.0 (2026-11-17): First release: two upload programs, two reports and a shared project selection.

## Frequently asked questions

### Does earned value need a progress analysis setup?

No. The percentage of completion is derived from confirmed work hours on network activities, so it also works in systems without a standard progress analysis setup.

### Does the schedule transfer overwrite the plan in SAP?

The transfer only updates duration, work and constraint dates of the activities in the file; test mode shows the fields that will change in advance.

### Can I buy the components separately?

Yes. Each component is also offered on its own page; the pack gives a shared selection screen and faster installation with one transport.

---
Let us install this package on your system: https://nekuhub.com/en/request-a-quote/?report=ps-project-planning-earned-value-pack