{"audience":"Quality managers, quality control and quality assurance teams, supplier quality engineers.","authorization_objects":[],"compatibility":"SAP ECC 6.0 and S/4HANA (on-premise and Private Edition). QM tables keep the same structure; on S/4HANA, stock movements are read from MATDOC or the related CDS view.","components":[{"id":"qm-inspection-lots-pending-ud-aging","note":"Inspection lots awaiting a usage decision, by age","title":"Inspection Lots Awaiting Usage Decision Aging Report","url":"https://nekuhub.com/en/reports/inspection-lots-awaiting-usage-decision-report/"},{"id":"qm-ud-with-missing-results","note":"Decisions made before all characteristics were recorded","title":"Usage Decisions Made Before All Characteristics Were Recorded Report","url":"https://nekuhub.com/en/reports/usage-decisions-with-missing-inspection-results-report/"},{"id":"qm-rejected-ud-blocked-stock","note":"Stock left blocked after a rejected usage decision","title":"Blocked Stock Left from Rejected Usage Decisions Report","url":"https://nekuhub.com/en/reports/blocked-stock-from-rejected-usage-decisions-report/"},{"id":"qm-overdue-quality-notifications","note":"Overdue quality notifications and open tasks","title":"Overdue Quality Notifications and Open Tasks Report","url":"https://nekuhub.com/en/reports/overdue-quality-notifications-and-open-tasks-report/"},{"id":"qm-vendor-quality-scorecard","note":"Vendor quality scorecard and rejection rate (PPM)","title":"Vendor Quality Scorecard and Rejection Rate (PPM) Report","url":"https://nekuhub.com/en/reports/vendor-quality-scorecard-rejection-rate-ppm-report/"}],"countries":[],"deliverables":"- Transport request: ABAP source code of the five reports, transaction codes and message class\n- Shared plant, inspection type and period selection screen\n- Installation and user guide (TR/EN)\n- Field, inspection type and authorization adjustment for your system\n- User training","effort_days_max":16,"effort_days_min":10,"effort_size":"XL","faq":[{"a":"Yes. The program that sets usage decisions for lots that passed all characteristics is offered on its own page and can be added to the same transport; the extra effort follows that program's range.","q":"Can the mass usage decision program be added to the pack?"},{"a":"Yes. If weights are defined for rejection rate, PPM and notification count, a single quality score column is added; the weights follow your vendor evaluation rules and are set during installation.","q":"Can a single quality score be added to the vendor scorecard?"},{"a":"Yes. Each report is also offered on its own page; the pack goes live faster with a shared selection screen and one installation.","q":"Can I buy the reports separately?"}],"features":[{"code":"transport","label":"Delivered as a transport request","note":""},{"code":"background","label":"Runs as a background job","note":"All five reports run in one job before the weekly quality meeting."},{"code":"email","label":"Send the result by email","note":"Overdue notifications go to their owners and the vendor scorecard to purchasing."},{"code":"drilldown","label":"Double-click drill-down to the document","note":""},{"code":"excel","label":"Export to Excel","note":""}],"functions":[],"gap":"On the quality side, pending decisions, missing results, open notifications and vendor performance are tracked in different transactions. The pack runs the five reports with the same plant and period; in the weekly meeting both internal delays and vendor-related problems are discussed from the same lists, and missing records are seen before an audit.","id":"qm-quality-control-pack","industries":[],"input_columns":[],"kind":"package","language":"en","lastmod":"2026-11-17","license":"One-time license; the source code stays with you. Optional yearly support and updates.","module":"QM","object_type":"package","output_columns":[],"parameters":[],"part_of":[],"quote_url":"https://nekuhub.com/en/request-a-quote/?report=qm-quality-control-pack","related":["inv-inventory-control-pack","pp-production-control-pack"],"releases":[{"notes":"First release: five quality reports and a shared plant selection.","released_at":"2026-11-17","version":"1.0"}],"source":"custom","standard_alternatives":[],"summary":"A five-report pack for the weekly quality meeting: inspection lots awaiting a usage decision, decisions made before all results were recorded, blocked stock left from rejections, overdue quality notifications and the vendor quality scorecard. All run with the same plant and period selection.","tables":[],"title":"Quality Management Control Pack","url":"https://nekuhub.com/en/packages/quality-management-control-pack/","vendor_id":"nekudos","version":"1.0"}