{"audience":"S/4HANA conversion project teams, finance and logistics module leads, master data teams and IT managers.","authorization_objects":[],"compatibility":"SAP ECC 6.0 systems preparing a system conversion to S/4HANA (on-premise or Private Edition). The CVI, subledger and material view checks can be run again on S/4HANA after the conversion; the cost element check is meant for the ECC system only.","components":[{"id":"ca-customer-vendor-bp-cvi-sync-check","note":"Master data: customers and vendors without a business partner or a missing role","title":"Customer/Vendor to Business Partner (CVI) Sync Check Report for S/4HANA Conversion","url":"https://nekuhub.com/en/reports/customer-vendor-business-partner-cvi-sync-check-report/"},{"id":"fi-subledger-reconciliation-account-check","note":"Finance: differences between subledger and reconciliation account","title":"Subledger vs Reconciliation Account Balance Check Report (S/4HANA Migration Check)","url":"https://nekuhub.com/en/reports/subledger-reconciliation-account-balance-check-report/"},{"id":"co-cost-element-gl-account-s4-readiness","note":"Controlling: cost elements that would block the merge with G/L accounts","title":"Cost Element vs G/L Account Consistency Check (S/4HANA Conversion Readiness)","url":"https://nekuhub.com/en/reports/cost-element-gl-account-consistency-check-s4hana/"},{"id":"mm-materials-missing-views-by-plant","note":"Logistics: missing purchasing, MRP, accounting and sales views by plant","title":"Materials Missing Required Views by Plant Report (S/4HANA Migration Check)","url":"https://nekuhub.com/en/reports/materials-missing-views-by-plant-report/"},{"id":"pp-production-version-readiness-s4","note":"Production: missing or faulty production versions","title":"Missing Production Versions Check Report for S/4HANA Migration","url":"https://nekuhub.com/en/reports/missing-production-versions-s4hana-migration-check-report/"}],"countries":[],"deliverables":"- Transport request: ABAP source code, transaction codes and message class\n- Settings tables for expected business partner roles and views\n- Installation and user guide (TR/EN)\n- Account group, material type and authorization adjustment for your system\n- Training for the project team on reading the results","effort_days_max":18,"effort_days_min":12,"effort_size":"XL","faq":[{"a":"No. SAP's standard readiness checks and conversion tools are still used; the pack lists the data side of the topics they raise record by record and distributes the corrections to the teams.","q":"Does the pack replace SAP's readiness checks?"},{"a":"An LE-WM to EWM migration readiness check and an employee to business partner link check are offered as separate components and can be added to the pack for companies that use those areas.","q":"Are there checks for warehouse management and HR data?"},{"a":"As often as needed. The reports only read data; they are run again after every clean-up round and trial conversion to track the number of remaining findings.","q":"How often can the checks be run?"}],"features":[{"code":"transport","label":"Delivered as a transport request","note":""},{"code":"layout","label":"User-specific layout variants","note":"Each team works with a saved layout showing its own findings."},{"code":"drilldown","label":"Double-click drill-down to the document","note":"Finding rows drill down to the customer, vendor, account or material master."},{"code":"excel","label":"Export to Excel","note":"Findings are exported to Excel for the project tracker and mass corrections."}],"functions":[],"gap":"Conversion tools reveal many blockers only during a trial conversion, and each trial takes weeks. The pack lists five common blockers in the ECC system in advance and splits them by responsible team: business partner synchronization goes to master data, reconciliation and cost element differences to finance, missing views and versions to logistics. Because the checks run with the same company code and plant selection, the project team tracks readiness in one table and re-runs the same reports between trial conversions.","id":"ca-s4hana-conversion-readiness-pack","industries":[],"input_columns":[],"kind":"package","language":"en","lastmod":"2026-11-17","license":"One-time license; the source code stays with you. Optional yearly support and updates.","module":"CA","object_type":"package","output_columns":[],"parameters":[],"part_of":[],"quote_url":"https://nekuhub.com/en/request-a-quote/?report=ca-s4hana-conversion-readiness-pack","related":["ca-business-partner-data-quality-pack","pp-production-master-data-pack","r2r-currency-vat-reconciliation-pack"],"releases":[{"notes":"First release: five readiness checks and a shared company code and plant selection.","released_at":"2026-11-17","version":"1.0"}],"source":"custom","standard_alternatives":[],"summary":"A five-component pack that finds the master data and finance inconsistencies to clean up before a system conversion from ECC to S/4HANA: business partner (CVI) synchronization status of customers and vendors, subledger and reconciliation account differences, cost element and G/L account consistency, missing material views by plant, and missing production versions. Installation is a single transport.","tables":[],"title":"S/4HANA Conversion Readiness Pack","url":"https://nekuhub.com/en/packages/s4hana-conversion-readiness-pack/","vendor_id":"nekudos","version":"1.0"}