{"audience":"Production controllers, cost accountants and CO teams responsible for rate planning.","authorization_objects":[{"note":"Display authorization by cost center","object":"K_CSKS"},{"note":"General cost center accounting authorization","object":"K_CCA"}],"components":[],"countries":[],"effort_days_max":6,"effort_days_min":4,"effort_size":"M","faq":[{"a":"Yes, that is its main purpose. The actual rate is calculated in the report from actual cost and quantity; once the actual price calculation has run, the system's rate is shown in an extra column as well.","q":"Can the report be used before the actual price calculation?"},{"a":"Yes. By reading the fixed rate portion in COST, the plan rate can be split into fixed and variable, so the deviation from capacity utilization becomes visible separately.","q":"Can fixed and variable rates be shown separately?"},{"a":"Yes. COST and COSL are still used on S/4HANA; COSP and COSS are read as compatibility views. If the new planning is used, plan quantities and rates are checked during installation.","q":"Does it work on S/4HANA?"}],"features":[{"code":"alv","label":"ALV list (sort, filter, subtotals)","note":""},{"code":"layout","label":"User-specific layout variants","note":""},{"code":"drilldown","label":"Double-click drill-down to the document","note":"The actual cost drills down to KSB1 and the rate to KSBT."},{"code":"excel","label":"Export to Excel","note":""},{"code":"background","label":"Runs as a background job","note":""},{"code":"email","label":"Send the result by email","note":""}],"functions":[],"gap":"KSBT shows only plan rates and does not compare them with actual costs. S_ALR_87013611 gives the cost center's plan and actual costs, but does not calculate the value allocated at actual quantity × plan rate or the actual rate per activity type. Under- or over-absorption is therefore usually worked out in Excel before the actual price calculation.","id":"co-activity-price-absorption","industries":[],"input_columns":[],"kind":"report","language":"en","lastmod":"2026-11-17","logic":"1. Cost centers of the controlling area are read from CSKS and CSKT, and activity types and their units from CSLA; the cost center / activity type object number is built.\n2. Plan rate: value type 01 in COST for P_VERSN; the total rate (TKG) of the periods is divided by the price unit. If the actual price calculation has run, the value type 04 rate is read as well.\n3. Quantities: plan (01) and actual (04) activity quantities in COSL are summed for P_PERFR–P_PERTO.\n4. Actual cost: the cost center's actual (04) debits in COSP and COSS, excluding the credits from activity output.\n5. Allocated value = actual quantity × plan rate. Under/over-absorption = actual cost − allocated value. Actual rate = actual cost / actual quantity; the deviation % is compared with P_TOL.","module":"CO","object_type":"alv_report","output_columns":[{"calculated":false,"formula":"","label":"Cost center","source_field":"KOSTL","source_table":"CSKS"},{"calculated":false,"formula":"","label":"Description","source_field":"KTEXT","source_table":"CSKT"},{"calculated":false,"formula":"","label":"Activity type","source_field":"LSTAR","source_table":"CSLA"},{"calculated":false,"formula":"","label":"Unit","source_field":"LEINH","source_table":"CSLA"},{"calculated":true,"formula":"Sum of COSL LST001…LST016, value type 01","label":"Plan quantity","source_field":null,"source_table":null},{"calculated":true,"formula":"Sum of COSL LST001…LST016, value type 04","label":"Actual quantity","source_field":null,"source_table":null},{"calculated":true,"formula":"COST TKG total rate / price unit, value type 01","label":"Plan rate","source_field":null,"source_table":null},{"calculated":true,"formula":"Actual debits of the cost center in COSP + COSS (activity credits excluded)","label":"Actual cost","source_field":null,"source_table":null},{"calculated":true,"formula":"Actual quantity × plan rate","label":"Allocated value","source_field":null,"source_table":null},{"calculated":true,"formula":"Actual cost − allocated value","label":"Under(+) / over(−) absorption","source_field":null,"source_table":null},{"calculated":true,"formula":"Actual cost / actual quantity","label":"Actual rate","source_field":null,"source_table":null},{"calculated":true,"formula":"(Actual rate − plan rate) / plan rate × 100","label":"Deviation (%)","source_field":null,"source_table":null},{"calculated":false,"formula":"","label":"Currency","source_field":"WAERS","source_table":"TKA01"}],"parameters":[{"example":"1000","kind":"parameter","label":"Controlling area","name":"P_KOKRS","ref_field":"CSKS-KOKRS","required":true},{"example":"4200–4299","kind":"select_option","label":"Cost center","name":"S_KOSTL","ref_field":"CSKS-KOSTL","required":false},{"example":"MAK01","kind":"select_option","label":"Activity type","name":"S_LSTAR","ref_field":"CSLA-LSTAR","required":false},{"example":"2026","kind":"parameter","label":"Fiscal year","name":"P_GJAHR","ref_field":"COST-GJAHR","required":true},{"example":"1","kind":"parameter","label":"From period","name":"P_PERFR","ref_field":"","required":true},{"example":"10","kind":"parameter","label":"To period","name":"P_PERTO","ref_field":"","required":true},{"example":"0","kind":"parameter","label":"Plan version","name":"P_VERSN","ref_field":"COST-VERSN","required":false},{"example":"5","kind":"parameter","label":"Rate deviation tolerance (%)","name":"P_TOL","ref_field":"","required":false}],"part_of":["co-cost-center-controlling-pack"],"performance":"COST, COSL, COSP and COSS are totals tables and read quickly with an object number list. For large controlling areas, selecting by cost center group or plant-related cost centers is recommended.","process":"R2R","quote_url":"https://nekuhub.com/en/request-a-quote/?report=co-activity-price-absorption","related":["co-cost-center-plan-actual-commitment","co-production-order-variance"],"releases":[],"source":"custom","standard_alternatives":[{"note":"Shows plan rates; does not compare them with actual costs.","tcode":"KSBT"},{"note":"Gives the cost center's plan and actual costs; does not calculate the absorption difference per activity type.","tcode":"S_ALR_87013611"}],"summary":"A custom ALV report that compares the plan rate per cost center and activity type with the actual rate derived from actual costs, and shows the under- or over-absorption between the value allocated at actual quantity × plan rate and the cost actually incurred.","tables":[{"access":"read","join_on":"","role":"Plan and actual activity rates (driving table)","table":"COST","variant":"both"},{"access":"read","join_on":"COSL-OBJNR = COST-OBJNR AND COSL-GJAHR = COST-GJAHR","role":"Plan and actual activity quantities","table":"COSL","variant":"both"},{"access":"read","join_on":"COSP-OBJNR = masraf yeri nesne numarası","role":"Primary actual costs of the cost center","table":"COSP","variant":"both"},{"access":"read","join_on":"COSS-OBJNR = masraf yeri nesne numarası","role":"Secondary actual costs received by the cost center","table":"COSS","variant":"both"},{"access":"read","join_on":"CSKS-KOKRS = P_KOKRS","role":"Cost center master","table":"CSKS","variant":"both"},{"access":"read","join_on":"CSKT-KOKRS = CSKS-KOKRS AND CSKT-KOSTL = CSKS-KOSTL","role":"Cost center description","table":"CSKT","variant":"both"},{"access":"read","join_on":"CSLA-KOKRS = CSKS-KOKRS","role":"Activity type and activity unit","table":"CSLA","variant":"both"},{"access":"read","join_on":"TKA01-KOKRS = CSKS-KOKRS","role":"Controlling area currency","table":"TKA01","variant":"both"}],"title":"Activity Type Plan vs Actual Rate and Under/Over-Absorption Report","url":"https://nekuhub.com/en/reports/activity-plan-vs-actual-rate-absorption-report/","vendor_id":"nekudos"}