{"audience":"Project managers, sales operations and billing teams, finance teams that monitor cash flow.","authorization_objects":[{"note":"Sales document display authorization by sales organization","object":"V_VBAK_VKO"},{"note":"Display authorization by sales document type","object":"V_VBAK_AAT"},{"note":"WBS element authorization by responsible person","object":"C_PRPS_VNR"}],"components":[],"countries":[],"effort_days_max":5,"effort_days_min":3,"effort_size":"M","faq":[{"a":"No, it only reads. Billing is done with VF04 or VF01. If automatic block removal is wanted, it is assessed as a separate program.","q":"Does the report create the invoice or remove the block?"},{"a":"No. The report covers billing plan dates linked to milestones. Resource-related billing with DP91 is tracked with a different logic.","q":"Is resource-related billing covered as well?"},{"a":"Yes. MLST, FPLA and FPLT are used in S/4HANA as well; VBAK and KNA1 are read with the same fields.","q":"Does this report work on S/4HANA?"}],"features":[{"code":"alv","label":"ALV list (sort, filter, subtotals)","note":""},{"code":"layout","label":"User-specific layout variants","note":""},{"code":"drilldown","label":"Double-click drill-down to the document","note":"The sales document opens VA03 (billing plan), the WBS element opens CJ20N."},{"code":"excel","label":"Export to Excel","note":""},{"code":"background","label":"Runs as a background job","note":""},{"code":"email","label":"Send the result by email","note":"Can be sent to project and sales owners for the weekly collections meeting."}],"functions":[],"gap":"The VF04 billing due list shows SD billing plan dates, but it does not show items whose milestone is completed while the billing block is still set or the billing date is still in the future, together with the WBS element and project responsible. CN53N lists milestones without billing status or amount. As a result, completed work can stay uninvoiced for weeks.","id":"ps-billing-milestones-not-invoiced","industries":[],"input_columns":[],"kind":"report","language":"en","lastmod":"2026-11-17","logic":"1. Milestones with an actual date (LST_ACTDT) in the selected range and before the key date, not deleted (LOEKZ), are read from MLST; the WBS element is added from PRPS.\n2. Billing plan dates are found in FPLT by milestone number (FPLT-MLSTN = MLST-MLSTN); dates whose billing status (FKSAF) is fully processed are skipped.\n3. The sales document comes from FPLA, the customer and sales organization from VBAK and the customer name from KNA1.\n4. The billing value FPLT-FAKWR, percentage FPLT-FPROZ, billing date FPLT-AFDAT and block FPLT-FAKSP are shown. Days since = key date − LST_ACTDT.\n5. Status: \"block set\" (FAKSP filled), \"billing date not reached\" (AFDAT \u003e key date) or \"due, not invoiced\".","module":"PS","object_type":"alv_report","output_columns":[{"calculated":false,"formula":"","label":"WBS element","source_field":"POSID","source_table":"PRPS"},{"calculated":false,"formula":"","label":"Milestone","source_field":"MLSTN","source_table":"MLST"},{"calculated":false,"formula":"","label":"Actual date","source_field":"LST_ACTDT","source_table":"MLST"},{"calculated":false,"formula":"","label":"Sales document","source_field":"VBELN","source_table":"VBAK"},{"calculated":false,"formula":"","label":"Customer","source_field":"KUNNR","source_table":"VBAK"},{"calculated":false,"formula":"","label":"Customer name","source_field":"NAME1","source_table":"KNA1"},{"calculated":false,"formula":"","label":"Billing plan item","source_field":"FPLTR","source_table":"FPLT"},{"calculated":false,"formula":"","label":"Billing date","source_field":"AFDAT","source_table":"FPLT"},{"calculated":false,"formula":"","label":"Percentage","source_field":"FPROZ","source_table":"FPLT"},{"calculated":false,"formula":"","label":"Value to bill","source_field":"FAKWR","source_table":"FPLT"},{"calculated":false,"formula":"","label":"Currency","source_field":"WAERS","source_table":"FPLT"},{"calculated":false,"formula":"","label":"Billing block","source_field":"FAKSP","source_table":"FPLT"},{"calculated":false,"formula":"","label":"Billing status","source_field":"FKSAF","source_table":"FPLT"},{"calculated":true,"formula":"Key date − MLST-LST_ACTDT","label":"Days since completion","source_field":null,"source_table":null},{"calculated":true,"formula":"Block set / billing date not reached / due, not invoiced","label":"Status","source_field":null,"source_table":null}],"parameters":[{"example":"1000","kind":"select_option","label":"Sales organization","name":"S_VKORG","ref_field":"VBAK-VKORG","required":false},{"example":"200310","kind":"select_option","label":"Customer","name":"S_KUNNR","ref_field":"VBAK-KUNNR","required":false},{"example":"0000012045","kind":"select_option","label":"Sales document","name":"S_VBELN","ref_field":"VBAK-VBELN","required":false},{"example":"P-26-0012-*","kind":"select_option","label":"WBS element","name":"S_POSID","ref_field":"PRPS-POSID","required":false},{"example":"01.01.2026 – 17.11.2026","kind":"select_option","label":"Milestone actual date","name":"S_ACTDT","ref_field":"MLST-LST_ACTDT","required":false},{"example":"","kind":"checkbox","label":"Billing block only","name":"P_BLOCK","ref_field":"","required":false},{"example":"17.11.2026","kind":"parameter","label":"Key date","name":"P_KEYDT","ref_field":"SY-DATUM","required":true}],"part_of":["ps-project-controlling-pack"],"performance":"MLST and FPLT are small tables, so the report runs fast online. The selection order is set to read VBAK/FPLA first when a sales organization is given, and MLST first otherwise. A background job with email is recommended for the weekly collections meeting.","process":"O2C","quote_url":"https://nekuhub.com/en/request-a-quote/?report=ps-billing-milestones-not-invoiced","related":["ps-wbs-schedule-slippage","sd-order-delivery-invoice-status"],"releases":[],"source":"custom","standard_alternatives":[{"note":"Processes the billing due list; does not show items whose milestone is completed but blocked or dated in the future, with the WBS element.","tcode":"VF04"},{"note":"Lists milestones; no billing plan value or status.","tcode":"CN53N"}],"summary":"A custom ALV report that lists completed project milestones, those with an actual date, whose billing plan date in the sales order is still not invoiced, with customer, amount, billing block and days since completion. It shows project and sales teams together where delayed collections come from.","tables":[{"access":"read","join_on":"","role":"Milestone: number, WBS element and actual date (driving table)","table":"MLST","variant":"both"},{"access":"read","join_on":"PRPS-PSPNR = MLST-PSPNR","role":"WBS element and responsible person","table":"PRPS","variant":"both"},{"access":"read","join_on":"FPLT-MLSTN = MLST-MLSTN","role":"Billing plan date: value, percentage, billing date, status and block","table":"FPLT","variant":"both"},{"access":"read","join_on":"FPLA-FPLNR = FPLT-FPLNR","role":"Billing plan header and sales document","table":"FPLA","variant":"both"},{"access":"read","join_on":"VBAK-VBELN = FPLA-VBELN","role":"Sales order: customer and sales organization","table":"VBAK","variant":"both"},{"access":"read","join_on":"KNA1-KUNNR = VBAK-KUNNR","role":"Customer name","table":"KNA1","variant":"both"}],"title":"Billing Milestones Reached but Not Invoiced Report","url":"https://nekuhub.com/en/reports/billing-milestones-reached-not-invoiced-report/","vendor_id":"nekudos"}