{"audience":"Controllers, cost center owners, budgeting teams and finance managers.","authorization_objects":[{"note":"Display authorization by cost center","object":"K_CSKS"},{"note":"General cost center accounting authorization","object":"K_CCA"}],"components":[],"countries":[],"effort_days_max":5,"effort_days_min":3,"effort_size":"M","faq":[{"a":"Open purchase requisitions and purchase orders with the cost center as account assignment are included. If other commitment types such as funds reservations are used, they can be added to the value type list.","q":"Which commitments are included?"},{"a":"Yes. A cost center group is added to the selection; the group is resolved into a list of cost centers and the result can be subtotaled by hierarchy node.","q":"Can I select by cost center group or hierarchy?"},{"a":"Yes. COSP and COSS are read as compatibility views on S/4HANA and actuals come from ACDOCA. If the new planning (ACDOCP) is used, the report is adapted to read plan values from there.","q":"Does it work on S/4HANA?"}],"features":[{"code":"alv","label":"ALV list (sort, filter, subtotals)","note":""},{"code":"layout","label":"User-specific layout variants","note":"Variants with subtotals by cost center or profit center can be saved."},{"code":"drilldown","label":"Double-click drill-down to the document","note":"The actual amount drills down to KSB1 and the commitment amount to the open order items."},{"code":"excel","label":"Export to Excel","note":""},{"code":"background","label":"Runs as a background job","note":""},{"code":"email","label":"Send the result by email","note":"Each cost center owner can receive their own rows."}],"functions":[],"gap":"S_ALR_87013611 shows plan, actual and variance but does not include open purchase requisition and order commitments, so managers see more remaining budget than there really is. Commitments are listed in a separate report and KSB1 shows only actual line items. There is no standard Excel-ready list that deducts actuals and commitments together to give the remaining budget.","id":"co-cost-center-plan-actual-commitment","industries":[],"input_columns":[],"kind":"report","language":"en","lastmod":"2026-11-17","logic":"1. Cost centers of the controlling area are read from CSKS with their validity in the selected period (DATAB/DATBI) and their texts from CSKT in the logon language; the object number (OBJNR) is built from the cost center.\n2. Plan: value type 01 (plan) in COSP and COSS for the selected plan version (VERSN).\n3. Actual: value type 04 in COSP and COSS, version 0. Commitment: value types 21 (purchase requisition) and 22 (purchase order) in COSP.\n4. Period amounts are summed from WKG001…WKG016 for the P_PERFR–P_PERTO range in controlling area currency (TKA01-WAERS).\n5. Remaining = plan − actual − commitment; consumption % = (actual + commitment) / plan × 100. The P_WARN threshold and 100% set the traffic light.","module":"CO","object_type":"alv_report","output_columns":[{"calculated":false,"formula":"","label":"Cost center","source_field":"KOSTL","source_table":"CSKS"},{"calculated":false,"formula":"","label":"Description","source_field":"KTEXT","source_table":"CSKT"},{"calculated":false,"formula":"","label":"Profit center","source_field":"PRCTR","source_table":"CSKS"},{"calculated":false,"formula":"","label":"Cost element","source_field":"KSTAR","source_table":"COSP"},{"calculated":true,"formula":"Sum of COSP + COSS WKG001…WKG016, value type 01, P_VERSN","label":"Plan","source_field":null,"source_table":null},{"calculated":true,"formula":"COSP + COSS period total, value type 04","label":"Actual","source_field":null,"source_table":null},{"calculated":true,"formula":"COSP period total, value types 21 and 22","label":"Commitment","source_field":null,"source_table":null},{"calculated":true,"formula":"Actual + commitment","label":"Actual + commitment","source_field":null,"source_table":null},{"calculated":true,"formula":"Plan − actual − commitment","label":"Remaining","source_field":null,"source_table":null},{"calculated":true,"formula":"(Actual + commitment) / plan × 100","label":"Consumption (%)","source_field":null,"source_table":null},{"calculated":true,"formula":"Consumption \u003c P_WARN green, P_WARN–100 yellow, \u003e 100 red","label":"Light","source_field":null,"source_table":null},{"calculated":false,"formula":"","label":"Currency","source_field":"WAERS","source_table":"TKA01"}],"parameters":[{"example":"1000","kind":"parameter","label":"Controlling area","name":"P_KOKRS","ref_field":"CSKS-KOKRS","required":true},{"example":"4100–4599","kind":"select_option","label":"Cost center","name":"S_KOSTL","ref_field":"CSKS-KOSTL","required":false},{"example":"770000–779999","kind":"select_option","label":"Cost element","name":"S_KSTAR","ref_field":"COSP-KSTAR","required":false},{"example":"2026","kind":"parameter","label":"Fiscal year","name":"P_GJAHR","ref_field":"COSP-GJAHR","required":true},{"example":"1","kind":"parameter","label":"From period","name":"P_PERFR","ref_field":"","required":true},{"example":"10","kind":"parameter","label":"To period","name":"P_PERTO","ref_field":"","required":true},{"example":"0","kind":"parameter","label":"Plan version","name":"P_VERSN","ref_field":"COSP-VERSN","required":false},{"example":"X","kind":"checkbox","label":"Include commitments","name":"P_CMMT","ref_field":"","required":false},{"example":"85","kind":"parameter","label":"Warning threshold (%)","name":"P_WARN","ref_field":"","required":false}],"part_of":["co-cost-center-controlling-pack"],"performance":"Read COSP and COSS by the object number list, fiscal year, value type and version; the totals tables are small, so the report is much faster than one based on line items. In S/4HANA, do the aggregation in the database.","process":"R2R","quote_url":"https://nekuhub.com/en/request-a-quote/?report=co-cost-center-plan-actual-commitment","related":["co-activity-price-absorption","co-cost-center-plan-upload","co-internal-order-budget-availability"],"releases":[],"source":"custom","standard_alternatives":[{"note":"Shows plan, actual and variance; does not include commitments or remaining budget.","tcode":"S_ALR_87013611"},{"note":"Lists actual line items; does not compare with plan and commitments.","tcode":"KSB1"}],"summary":"A custom ALV report that shows plan, actual and open purchasing commitments per cost center and cost element on one row, and calculates the remaining budget and consumption rate. Rows above the consumption threshold are flagged with a traffic light.","tables":[{"access":"read","join_on":"","role":"Primary cost totals: plan, actual and commitments (driving table)","table":"COSP","variant":"both"},{"access":"read","join_on":"COSS-OBJNR = COSP-OBJNR AND COSS-GJAHR = COSP-GJAHR","role":"Secondary cost totals: plan and actual allocations","table":"COSS","variant":"both"},{"access":"read","join_on":"OBJNR = 'KS' + CSKS-KOKRS + CSKS-KOSTL","role":"Cost center master: validity, profit center, category","table":"CSKS","variant":"both"},{"access":"read","join_on":"CSKT-KOKRS = CSKS-KOKRS AND CSKT-KOSTL = CSKS-KOSTL AND CSKT-DATBI = CSKS-DATBI","role":"Cost center description","table":"CSKT","variant":"both"},{"access":"read","join_on":"TKA01-KOKRS = CSKS-KOKRS","role":"Controlling area currency","table":"TKA01","variant":"both"}],"title":"Cost Center Plan vs Actual with Commitments Report","url":"https://nekuhub.com/en/reports/cost-center-plan-actual-commitment-report/","vendor_id":"nekudos"}