{"audience":"Project managers, planning engineers, project offices and site managers.","authorization_objects":[{"note":"Network authorization by plant and order type","object":"C_AFKO_AWK"},{"note":"WBS element authorization by responsible person","object":"C_PRPS_VNR"}],"components":[],"countries":[],"effort_days_max":4,"effort_days_min":3,"effort_size":"S","faq":[{"a":"The float in AFVV is the result of the last scheduling run. If the network is not rescheduled after confirmations or date changes, the float stays old; overall scheduling at night before the report is therefore recommended.","q":"Why do the float values look out of date?"},{"a":"Yes, if relationships between networks are scheduled together in overall scheduling (CN24N), the float reflects them. The report shows the value SAP calculated and does not recalculate it.","q":"Are relationships between networks taken into account?"},{"a":"Yes. The network tables (AFKO, AFVC, AFVV) are the same in S/4HANA. In systems that use enterprise portfolio and project management, the same logic can be adapted to those structures.","q":"Does the report work on S/4HANA?"}],"features":[{"code":"alv","label":"ALV list (sort, filter, subtotals)","note":""},{"code":"layout","label":"User-specific layout variants","note":""},{"code":"drilldown","label":"Double-click drill-down to the document","note":"The network and activity open CJ20N on that activity."},{"code":"excel","label":"Export to Excel","note":""},{"code":"background","label":"Runs as a background job","note":""},{"code":"email","label":"Send the result by email","note":"Critical and negative float activities can be sent to each responsible person weekly."}],"functions":[],"gap":"CN41N and CN47N show activity dates; even if the total float field is added, filtering by float across several projects, flagging negative float separately and grouping by responsible person are not possible. The project planning board shows the critical path graphically for one network. Planners therefore export the list every week and filter it in Excel.","id":"ps-network-activities-low-float","industries":[],"input_columns":[],"kind":"report","language":"en","lastmod":"2026-11-17","logic":"1. PROJ and PRPS are read by project, WBS element and responsible person (VERNR); networks linked to these WBS elements are found through AUFK (PSPEL) and AFKO.\n2. Activities are read from AFVC (AUFPL), and date and float fields from AFVV: earliest start and finish (FSAVD, FSEDD), latest start and finish (SSAVD, SSEDD), total float (PUFFR), actual start (ISDD).\n3. The activity status is read from JEST; if P_OPEN is set, finally confirmed (CNF), technically completed (TECO) or deleted activities are excluded.\n4. Activities with a total float equal to or below P_FLOAT remain; float 0 is classified as critical, negative as negative float and the rest as low float.\n5. Completion = AFVV-ISMNW ÷ AFVV-ARBEI × 100; days to latest finish = AFVV-SSEDD − key date. The work center comes from CRHD; the list is sorted by float and latest finish.","module":"PS","object_type":"alv_report","output_columns":[{"calculated":false,"formula":"","label":"Project","source_field":"PSPID","source_table":"PROJ"},{"calculated":false,"formula":"","label":"WBS element","source_field":"POSID","source_table":"PRPS"},{"calculated":false,"formula":"","label":"Responsible","source_field":"VERNA","source_table":"PRPS"},{"calculated":false,"formula":"","label":"Network","source_field":"AUFNR","source_table":"AFKO"},{"calculated":false,"formula":"","label":"Activity","source_field":"VORNR","source_table":"AFVC"},{"calculated":false,"formula":"","label":"Activity text","source_field":"LTXA1","source_table":"AFVC"},{"calculated":false,"formula":"","label":"Work center","source_field":"ARBPL","source_table":"CRHD"},{"calculated":false,"formula":"","label":"Earliest start","source_field":"FSAVD","source_table":"AFVV"},{"calculated":false,"formula":"","label":"Earliest finish","source_field":"FSEDD","source_table":"AFVV"},{"calculated":false,"formula":"","label":"Latest finish","source_field":"SSEDD","source_table":"AFVV"},{"calculated":false,"formula":"","label":"Total float","source_field":"PUFFR","source_table":"AFVV"},{"calculated":false,"formula":"","label":"Actual start","source_field":"ISDD","source_table":"AFVV"},{"calculated":true,"formula":"AFVV-ISMNW ÷ AFVV-ARBEI × 100","label":"Completion (%)","source_field":null,"source_table":null},{"calculated":true,"formula":"AFVV-SSEDD − key date","label":"Days to latest finish","source_field":null,"source_table":null},{"calculated":true,"formula":"Float \u003c 0 negative, = 0 critical, ≤ P_FLOAT low float","label":"Category","source_field":null,"source_table":null}],"parameters":[{"example":"P-26-0014","kind":"select_option","label":"Project definition","name":"S_PSPID","ref_field":"PROJ-PSPID","required":true},{"example":"P-26-0014-02","kind":"select_option","label":"WBS element","name":"S_POSID","ref_field":"PRPS-POSID","required":false},{"example":"4000123","kind":"select_option","label":"Network","name":"S_AUFNR","ref_field":"AFKO-AUFNR","required":false},{"example":"SAHA1","kind":"select_option","label":"Work center","name":"S_ARBPL","ref_field":"CRHD-ARBPL","required":false},{"example":"12","kind":"select_option","label":"Responsible person no","name":"S_VERNR","ref_field":"PRPS-VERNR","required":false},{"example":"5","kind":"parameter","label":"Maximum total float (days)","name":"P_FLOAT","ref_field":"","required":true},{"example":"X","kind":"checkbox","label":"Exclude completed activities","name":"P_OPEN","ref_field":"","required":false},{"example":"17.11.2026","kind":"parameter","label":"Key date","name":"P_KEYDT","ref_field":"SY-DATUM","required":true}],"part_of":[],"performance":"Float values come from the last scheduling run; running overall network scheduling (CN24N) as a nightly job before the report gives correct results. The read works through AUFPL, so it is fast even for hundreds of networks.","quote_url":"https://nekuhub.com/en/request-a-quote/?report=ps-network-activities-low-float","related":["ps-network-activity-planned-vs-actual-hours","ps-wbs-schedule-slippage"],"releases":[],"source":"custom","standard_alternatives":[{"note":"Shows the project structure and dates; has no filtering or classification by float across projects.","tcode":"CN41N"},{"note":"Gives the activity list; negative float and days to latest finish are not calculated.","tcode":"CN47N"}],"summary":"A custom ALV report that filters network activities by the total float from the last scheduling run and lists critical (zero float), negative float and low float activities with responsible person, work center, earliest and latest dates and completion percentage. In the weekly project meeting the work that can delay the project shows up in one list.","tables":[{"access":"read","join_on":"","role":"WBS element and responsible person (driving table)","table":"PRPS","variant":"both"},{"access":"read","join_on":"PROJ-PSPNR = PRPS-PSPHI","role":"Project definition","table":"PROJ","variant":"both"},{"access":"read","join_on":"AUFK-PSPEL = PRPS-PSPNR","role":"Network header and linked WBS element","table":"AUFK","variant":"both"},{"access":"read","join_on":"AFKO-AUFNR = AUFK-AUFNR","role":"Network routing number of operations","table":"AFKO","variant":"both"},{"access":"read","join_on":"AFVC-AUFPL = AFKO-AUFPL","role":"Activity: number, text, work center","table":"AFVC","variant":"both"},{"access":"read","join_on":"AFVV-AUFPL = AFVC-AUFPL AND AFVV-APLZL = AFVC-APLZL","role":"Activity dates, total float, planned and actual work","table":"AFVV","variant":"both"},{"access":"read","join_on":"CRHD-OBJID = AFVC-ARBID AND CRHD-OBJTY = 'A'","role":"Work center code","table":"CRHD","variant":"both"},{"access":"read","join_on":"JEST-OBJNR = AFVC-OBJNR","role":"Activity status (CNF, TECO)","table":"JEST","variant":"both"}],"title":"Critical Path and Low Float Network Activities Report","url":"https://nekuhub.com/en/reports/critical-path-and-low-float-network-activities-report/","vendor_id":"nekudos"}