{"audience":"Controllers, marketing and project budget owners, and teams that track investment and maintenance orders.","authorization_objects":[{"note":"Internal order display authorization by order type","object":"K_ORDER"}],"components":[],"countries":[],"effort_days_max":5,"effort_days_min":3,"effort_size":"M","faq":[{"a":"Because the report reads budget, actuals and commitments from the same value types, it usually gives the same remaining amount. If the availability control has cost element exemptions or tolerances, they are applied to the report the same way during installation.","q":"Does it give the same result as the availability control?"},{"a":"Yes. When budget records are split by business transaction (VORGA), original budget, supplements and returns can be shown in separate columns.","q":"Can the budget be split into original, supplement and return?"},{"a":"Yes. BPJA and BPGE are still used on S/4HANA; COSP and COSS are read as compatibility views and actuals come from ACDOCA.","q":"Does it work on S/4HANA?"}],"features":[{"code":"alv","label":"ALV list (sort, filter, subtotals)","note":""},{"code":"layout","label":"User-specific layout variants","note":""},{"code":"drilldown","label":"Double-click drill-down to the document","note":"The order opens KO03 and the actual amount drills down to KOB1."},{"code":"excel","label":"Export to Excel","note":""},{"code":"background","label":"Runs as a background job","note":"Can run weekly and send orders above the threshold to their owners."},{"code":"email","label":"Send the result by email","note":""}],"functions":[],"gap":"KO03 shows the budget per order and KOB1 lists actual line items; neither shows budget, actual, commitment and remaining side by side for many orders. The standard budget comparison reports are based on Report Painter, do not offer a current-year remaining-budget column in one Excel-ready row and give no warning by consumption threshold.","id":"co-internal-order-budget-availability","industries":[],"input_columns":[],"kind":"report","language":"en","lastmod":"2026-11-17","logic":"1. Internal orders (order category 01) matching the selection are read from AUFK; the system status is taken from JEST (inactive statuses excluded). Closed orders are skipped unless P_CLOSED is set.\n2. Budget: value type 41 records are summed in controlling area currency from BPJA for P_GJAHR in the annual view, or from BPGE in the overall view (WLJHR / WLGES); original budget, supplements and returns are all included.\n3. Actual: value type 04 in COSP and COSS; only P_GJAHR in the annual view, all years in the overall view.\n4. Commitment: value types 21 and 22 in COSP.\n5. Remaining = budget − actual − commitment; consumption % and the traffic light by the P_WARN threshold are calculated.","module":"CO","object_type":"alv_report","output_columns":[{"calculated":false,"formula":"","label":"Order","source_field":"AUFNR","source_table":"AUFK"},{"calculated":false,"formula":"","label":"Description","source_field":"KTEXT","source_table":"AUFK"},{"calculated":false,"formula":"","label":"Order type","source_field":"AUART","source_table":"AUFK"},{"calculated":true,"formula":"BPJA-WLJHR (annual) or BPGE-WLGES (overall), value type 41","label":"Budget","source_field":null,"source_table":null},{"calculated":true,"formula":"COSP + COSS, value type 04","label":"Actual","source_field":null,"source_table":null},{"calculated":true,"formula":"COSP, value types 21 and 22","label":"Commitment","source_field":null,"source_table":null},{"calculated":true,"formula":"Actual + commitment","label":"Assigned","source_field":null,"source_table":null},{"calculated":true,"formula":"Budget − assigned","label":"Available budget","source_field":null,"source_table":null},{"calculated":true,"formula":"Assigned / budget × 100","label":"Consumption (%)","source_field":null,"source_table":null},{"calculated":true,"formula":"Short text of the active system statuses in JEST","label":"System status","source_field":null,"source_table":null},{"calculated":true,"formula":"Consumption \u003c P_WARN green, P_WARN–100 yellow, \u003e 100 red","label":"Light","source_field":null,"source_table":null},{"calculated":false,"formula":"","label":"Currency","source_field":"WAERS","source_table":"TKA01"}],"parameters":[{"example":"1000","kind":"parameter","label":"Controlling area","name":"P_KOKRS","ref_field":"AUFK-KOKRS","required":true},{"example":"400100–400199","kind":"select_option","label":"Internal order","name":"S_AUFNR","ref_field":"AUFK-AUFNR","required":false},{"example":"0400","kind":"select_option","label":"Order type","name":"S_AUART","ref_field":"AUFK-AUART","required":false},{"example":"1000","kind":"select_option","label":"Company code","name":"S_BUKRS","ref_field":"AUFK-BUKRS","required":false},{"example":"2026","kind":"parameter","label":"Fiscal year","name":"P_GJAHR","ref_field":"BPJA-GJAHR","required":true},{"example":"X","kind":"radio","label":"Annual budget","name":"P_ANNUAL","ref_field":"","required":false},{"example":"","kind":"radio","label":"Overall budget","name":"P_OVERAL","ref_field":"","required":false},{"example":"90","kind":"parameter","label":"Warning threshold (%)","name":"P_WARN","ref_field":"","required":false},{"example":"","kind":"checkbox","label":"Also show closed orders","name":"P_CLOSED","ref_field":"","required":false}],"part_of":[],"performance":"Select the orders from AUFK first, then read BPJA/BPGE and COSP/COSS once with the object number list. The JEST read is limited to active statuses.","process":"R2R","quote_url":"https://nekuhub.com/en/request-a-quote/?report=co-internal-order-budget-availability","related":["co-cost-center-plan-actual-commitment","co-internal-order-mass-create","co-orders-settlement-check"],"releases":[],"source":"custom","standard_alternatives":[{"note":"Lists the order's actual line items; gives no budget or remaining amount.","tcode":"KOB1"},{"note":"Shows order master data and budget one at a time; no comparison across many orders.","tcode":"KO03"}],"summary":"A custom ALV report that compares the annual or overall budget of internal orders with actual costs and open commitments, and shows the remaining budget, consumption rate and system status for each order on one row.","tables":[{"access":"read","join_on":"","role":"Internal order master: type, description, company code, object number (driving table)","table":"AUFK","variant":"both"},{"access":"read","join_on":"BPJA-OBJNR = AUFK-OBJNR","role":"Annual budget totals (value type 41)","table":"BPJA","variant":"both"},{"access":"read","join_on":"BPGE-OBJNR = AUFK-OBJNR","role":"Overall budget (value type 41)","table":"BPGE","variant":"both"},{"access":"read","join_on":"COSP-OBJNR = AUFK-OBJNR","role":"Primary actual costs and commitments","table":"COSP","variant":"both"},{"access":"read","join_on":"COSS-OBJNR = AUFK-OBJNR","role":"Secondary actual costs","table":"COSS","variant":"both"},{"access":"read","join_on":"JEST-OBJNR = AUFK-OBJNR","role":"System status (created, released, technically complete, closed)","table":"JEST","variant":"both"},{"access":"read","join_on":"TKA01-KOKRS = AUFK-KOKRS","role":"Controlling area currency","table":"TKA01","variant":"both"}],"title":"Internal Order Budget Availability Report","url":"https://nekuhub.com/en/reports/internal-order-budget-availability-report/","vendor_id":"nekudos"}