{"audience":"MRP controllers, buyers and warehouse managers.","authorization_objects":[{"note":"MRP display authorization by plant and MRP controller","object":"M_MTDI_ORG"},{"note":"Purchase order display authorization by plant","object":"M_BEST_WRK"},{"note":"Requisition display authorization by plant","object":"M_BANF_WRK"}],"components":[],"countries":[],"effort_days_max":5,"effort_days_min":4,"effort_size":"M","faq":[{"a":"By default only unrestricted stock (MARD-LABST) is used. Quality inspection stock (MARD-INSME) can be added with a separate option if needed.","q":"Is quality inspection or blocked stock counted?"},{"a":"The base version focuses on the safety stock shortage and does not subtract requirements. If reservations (RESB) or sales requirements should be subtracted as well, the scope and effort increase.","q":"Are reservations and sales order requirements subtracted?"},{"a":"Yes. In S/4HANA the MARD stock quantities are read from MATDOC through a compatibility view, and the report keeps using the same fields. For clean core, stock can be read with I_StockQuantityCurrentValue_2.","q":"Does this report work on S/4HANA?"}],"features":[{"code":"alv","label":"ALV list (sort, filter, subtotals)","note":""},{"code":"layout","label":"User-specific layout variants","note":""},{"code":"drilldown","label":"Double-click drill-down to the document","note":"Double-clicking the material opens the MD04 stock/requirements list."},{"code":"excel","label":"Export to Excel","note":""},{"code":"background","label":"Runs as a background job","note":""},{"code":"email","label":"Send the result by email","note":"Red and yellow lines can be sent to each MRP controller every morning."}],"functions":[],"gap":"MB52 shows stock, and MD04 shows the stock and requirements of one material at a time. MD07 gives a collective view but focuses on exception messages and does not subtract open order and requisition quantities from the safety stock shortage to show the net coverage with the earliest delivery date on one line. Planners check critical materials one by one in MD04 every morning.","id":"mm-below-safety-stock-coverage","industries":[],"input_columns":[],"kind":"report","language":"en","lastmod":"2026-11-17","logic":"1. MARC is read by plant, MRP controller and purchasing group; materials with safety stock (EISBE) or reorder point (MINBE) above zero and no deletion flag (LVORM) remain.\n2. Unrestricted stock = Σ MARD-LABST over storage locations (with an optional storage location filter).\n3. Threshold = MINBE if a reorder point is maintained, otherwise EISBE. Shortage = threshold − stock; materials without a shortage are skipped.\n4. The open order quantity is summed from EKPO/EKET (EKET-MENGE − EKET-WEMNG on items that are not deleted or delivery completed) and the earliest EKET-EINDT is taken; a different order unit is converted to the base unit with the MARM factors. Optionally, the open requisition quantity from EBAN (MENGE − BSMNG) is added.\n5. Net coverage = stock + open orders + open requisitions − threshold. Status: red (not covered), yellow (covered only by requisitions or after the planned delivery time), green (covered by orders in time).","module":"MM","object_type":"alv_report","output_columns":[{"calculated":false,"formula":"","label":"Material","source_field":"MATNR","source_table":"MARC"},{"calculated":false,"formula":"","label":"Description","source_field":"MAKTX","source_table":"MAKT"},{"calculated":false,"formula":"","label":"Plant","source_field":"WERKS","source_table":"MARC"},{"calculated":false,"formula":"","label":"MRP controller","source_field":"DISPO","source_table":"MARC"},{"calculated":false,"formula":"","label":"Purchasing group","source_field":"EKGRP","source_table":"MARC"},{"calculated":false,"formula":"","label":"Unit","source_field":"MEINS","source_table":"MARA"},{"calculated":true,"formula":"Σ MARD-LABST","label":"Unrestricted stock","source_field":null,"source_table":null},{"calculated":false,"formula":"","label":"Safety stock","source_field":"EISBE","source_table":"MARC"},{"calculated":false,"formula":"","label":"Reorder point","source_field":"MINBE","source_table":"MARC"},{"calculated":true,"formula":"Threshold (MINBE, else EISBE) − unrestricted stock","label":"Shortage","source_field":null,"source_table":null},{"calculated":true,"formula":"Σ (EKET-MENGE − EKET-WEMNG), in base unit","label":"Open PO qty","source_field":null,"source_table":null},{"calculated":true,"formula":"Σ (EBAN-MENGE − EBAN-BSMNG)","label":"Open PR qty","source_field":null,"source_table":null},{"calculated":true,"formula":"Unrestricted stock + open PO qty + open PR qty − threshold","label":"Net coverage","source_field":null,"source_table":null},{"calculated":false,"formula":"","label":"Earliest delivery","source_field":"EINDT","source_table":"EKET"},{"calculated":false,"formula":"","label":"Planned delivery time (days)","source_field":"PLIFZ","source_table":"MARC"},{"calculated":true,"formula":"Red / yellow / green: net coverage and earliest delivery compared with today + PLIFZ","label":"Status","source_field":null,"source_table":null}],"parameters":[{"example":"1000","kind":"select_option","label":"Plant","name":"S_WERKS","ref_field":"MARC-WERKS","required":true},{"example":"RM-1001","kind":"select_option","label":"Material","name":"S_MATNR","ref_field":"MARC-MATNR","required":false},{"example":"001","kind":"select_option","label":"MRP controller","name":"S_DISPO","ref_field":"MARC-DISPO","required":false},{"example":"001","kind":"select_option","label":"Purchasing group","name":"S_EKGRP","ref_field":"MARC-EKGRP","required":false},{"example":"ROH","kind":"select_option","label":"Material type","name":"S_MTART","ref_field":"MARA-MTART","required":false},{"example":"0001","kind":"select_option","label":"Storage location","name":"S_LGORT","ref_field":"MARD-LGORT","required":false},{"example":"X","kind":"checkbox","label":"Include open requisitions in coverage","name":"P_INCPR","ref_field":"","required":false},{"example":"","kind":"checkbox","label":"Uncovered only","name":"P_UNCOV","ref_field":"","required":false}],"part_of":["inv-inventory-control-pack"],"performance":"Narrow the MARC selection by plant and MRP controller, and take the MARD, EKET and EBAN totals for the material list in SQL with GROUP BY. For large plants, run the report every morning as a background job and email it to the planners.","process":"INV","quote_url":"https://nekuhub.com/en/request-a-quote/?report=mm-below-safety-stock-coverage","related":["mm-mb52-warehouse-stock","mm-open-po-by-vendor","mm-open-purchase-requisitions-aging"],"releases":[],"source":"custom","standard_alternatives":[{"note":"Shows stock and requirements of one material in detail; gives no net coverage list for many materials.","tcode":"MD04"},{"note":"Lists warehouse stock; no comparison with safety stock, open orders or requisitions.","tcode":"MB52"}],"summary":"A custom ALV report that lists materials whose stock has fallen below safety stock or the reorder point, and shows whether the shortage is covered by open purchase orders and requisitions. Planners see in one list which material is not covered at all and when the earliest delivery is due.","tables":[{"access":"read","join_on":"","role":"Safety stock, reorder point, MRP controller and planned delivery time (driving table)","table":"MARC","variant":"both"},{"access":"read","join_on":"MARD-MATNR = MARC-MATNR AND MARD-WERKS = MARC-WERKS","role":"Unrestricted stock per storage location","table":"MARD","variant":"both"},{"access":"read","join_on":"MARA-MATNR = MARC-MATNR","role":"Material type and base unit","table":"MARA","variant":"both"},{"access":"read","join_on":"MAKT-MATNR = MARC-MATNR AND MAKT-SPRAS = SY-LANGU","role":"Material description","table":"MAKT","variant":"both"},{"access":"read","join_on":"EKPO-MATNR = MARC-MATNR AND EKPO-WERKS = MARC-WERKS","role":"Open order items (not deleted, not delivery completed)","table":"EKPO","variant":"both"},{"access":"read","join_on":"EKET-EBELN = EKPO-EBELN AND EKET-EBELP = EKPO-EBELP","role":"Open quantity and delivery date","table":"EKET","variant":"both"},{"access":"read","join_on":"EBAN-MATNR = MARC-MATNR AND EBAN-WERKS = MARC-WERKS","role":"Requisition quantity not yet ordered","table":"EBAN","variant":"both"},{"access":"read","join_on":"MARM-MATNR = EKPO-MATNR AND MARM-MEINH = EKPO-MEINS","role":"Conversion from order unit to base unit","table":"MARM","variant":"both"}],"title":"Materials Below Safety Stock with Open Purchase Order Coverage Report","url":"https://nekuhub.com/en/reports/materials-below-safety-stock-open-po-coverage-report/","vendor_id":"nekudos"}