{"audience":"Reliability engineers, maintenance managers, production managers and TPM teams.","authorization_objects":[{"note":"Display maintenance notifications by notification type","object":"I_QMEL"},{"note":"Display by maintenance plant","object":"I_SWERK"}],"components":[],"countries":[],"effort_days_max":6,"effort_days_min":4,"effort_size":"M","faq":[{"a":"It is set by the operating hours per day parameter: 24 gives calendar time, the shift length gives operating time. For equipment with counters, the real operating hours can also be read from measurement documents.","q":"Is MTBF based on calendar time or operating time?"},{"a":"They are counted as breakdowns, but add zero downtime and are flagged in a separate warning column, so the data quality issue becomes visible.","q":"What happens to notifications without downtime?"},{"a":"Yes. QMEL, QMIH, QMFE and QMUR keep the same structure in S/4HANA. For a clean core approach, I_MaintenanceNotification and related CDS views can be used.","q":"Does it work on S/4HANA?"}],"features":[{"code":"alv","label":"ALV list (sort, filter, subtotals)","note":""},{"code":"layout","label":"User-specific layout variants","note":""},{"code":"drilldown","label":"Double-click drill-down to the document","note":"An equipment line lists the breakdown notifications of the period; a notification opens IW23."},{"code":"excel","label":"Export to Excel","note":""},{"code":"background","label":"Runs as a background job","note":""},{"code":"email","label":"Send the result by email","note":"A monthly reliability summary can be sent to managers."}],"functions":[],"gap":"MTBF and MTTR analyses in the maintenance information system (MCI7, MCJB) depend on statistics updates and do not give flexible filters for damage and cause codes, repeat failures or the company's own operating time. IW29 lists notifications but does not calculate the ratios. Reliability teams export the notification list to Excel every month and calculate these metrics by hand.","id":"pm-mtbf-mttr-by-equipment","industries":[],"input_columns":[],"kind":"report","language":"en","lastmod":"2026-11-17","logic":"1. Maintenance notifications with the breakdown flag (MSAUS) set and a malfunction start (AUSVN) inside the selected period are read from QMIH; notification type (QMART) and date are added from QMEL and deleted notifications are skipped.\n2. Downtime = QMIH-AUSZT, converted to hours with unit MAUEH. The number of breakdowns N and total downtime D are calculated per equipment.\n3. MTTR = D ÷ N. Period hours = days in period × operating hours per day. MTBF = (period hours − D) ÷ N. Availability % = (period hours − D) ÷ period hours × 100.\n4. Repeat failures: breakdowns on the same equipment that start within the repeat window (days) after the start of the previous breakdown are counted.\n5. The damage code (FEGRP/FECOD) from QMFE and the cause code (URGRP/URCOD) from QMUR are added as the most frequent value. The functional location comes through QMIH-ILOAN → ILOA-TPLNR and the equipment description from EQKT.\n6. Equipment below the minimum number of breakdowns is skipped; ALV is sorted by MTBF ascending, so the least reliable equipment comes first.","module":"PM","object_type":"alv_report","output_columns":[{"calculated":false,"formula":"","label":"Equipment","source_field":"EQUNR","source_table":"QMIH"},{"calculated":false,"formula":"","label":"Description","source_field":"EQKTX","source_table":"EQKT"},{"calculated":false,"formula":"","label":"Functional location","source_field":"TPLNR","source_table":"ILOA"},{"calculated":true,"formula":"Number of breakdown notifications in the period (N)","label":"Breakdowns","source_field":null,"source_table":null},{"calculated":true,"formula":"Σ QMIH-AUSZT, converted to hours (D)","label":"Total downtime (h)","source_field":null,"source_table":null},{"calculated":true,"formula":"D ÷ N","label":"MTTR (h)","source_field":null,"source_table":null},{"calculated":true,"formula":"(Period hours − D) ÷ N","label":"MTBF (h)","source_field":null,"source_table":null},{"calculated":true,"formula":"(Period hours − D) ÷ period hours × 100","label":"Availability %","source_field":null,"source_table":null},{"calculated":true,"formula":"Breakdowns that start within the repeat window after the previous one","label":"Repeat failures","source_field":null,"source_table":null},{"calculated":true,"formula":"Largest QMIH-AUSVN","label":"Last breakdown","source_field":null,"source_table":null},{"calculated":true,"formula":"Most frequent QMFE-FEGRP / QMFE-FECOD","label":"Top damage code","source_field":null,"source_table":null},{"calculated":true,"formula":"Most frequent QMUR-URGRP / QMUR-URCOD","label":"Top cause code","source_field":null,"source_table":null}],"parameters":[{"example":"1000","kind":"select_option","label":"Maintenance planning plant","name":"S_IWERK","ref_field":"QMIH-IWERK","required":true},{"example":"10000045","kind":"select_option","label":"Equipment","name":"S_EQUNR","ref_field":"QMIH-EQUNR","required":false},{"example":"TR01-URT-*","kind":"select_option","label":"Functional location","name":"S_TPLNR","ref_field":"ILOA-TPLNR","required":false},{"example":"M2","kind":"select_option","label":"Notification type","name":"S_QMART","ref_field":"QMEL-QMART","required":false},{"example":"01.08.2026 – 31.10.2026","kind":"select_option","label":"Malfunction start date (period)","name":"S_AUSVN","ref_field":"QMIH-AUSVN","required":true},{"example":"90","kind":"parameter","label":"Repeat window (days)","name":"P_REPDAY","ref_field":"","required":false},{"example":"24","kind":"parameter","label":"Operating hours per day (for MTBF)","name":"P_HRDAY","ref_field":"","required":true},{"example":"2","kind":"parameter","label":"Minimum number of breakdowns","name":"P_MINBR","ref_field":"","required":false}],"part_of":["pm-maintenance-kpi-pack"],"performance":"Narrow QMIH by planning plant and malfunction start date. Read QMFE and QMUR with FOR ALL ENTRIES only for the selected notifications. The report can run in the background before the monthly reliability meeting.","quote_url":"https://nekuhub.com/en/request-a-quote/?report=pm-mtbf-mttr-by-equipment","related":["pm-maintenance-cost-by-equipment","pm-open-notifications-without-order"],"releases":[],"source":"custom","standard_alternatives":[{"note":"Lists breakdown notifications; no MTBF, MTTR, availability or repeat failure calculation.","tcode":"IW29"}],"summary":"A custom ALV report that calculates, from breakdown notifications, the number of breakdowns, total downtime, mean time to repair (MTTR), mean time between failures (MTBF), availability percentage and repeat failures for each equipment. The most frequent damage and cause codes appear on the same line.","tables":[{"access":"read","join_on":"","role":"Breakdown flag, malfunction start and downtime (driving table)","table":"QMIH","variant":"both"},{"access":"read","join_on":"QMEL-QMNUM = QMIH-QMNUM","role":"Notification type, date and short text","table":"QMEL","variant":"both"},{"access":"read","join_on":"QMFE-QMNUM = QMIH-QMNUM","role":"Damage codes","table":"QMFE","variant":"both"},{"access":"read","join_on":"QMUR-QMNUM = QMFE-QMNUM AND QMUR-FENUM = QMFE-FENUM","role":"Cause codes","table":"QMUR","variant":"both"},{"access":"read","join_on":"EQKT-EQUNR = QMIH-EQUNR AND EQKT-SPRAS = SY-LANGU","role":"Equipment description","table":"EQKT","variant":"both"},{"access":"read","join_on":"ILOA-ILOAN = QMIH-ILOAN","role":"Functional location","table":"ILOA","variant":"both"}],"title":"MTBF and MTTR Reliability Report by Equipment","url":"https://nekuhub.com/en/reports/mtbf-mttr-by-equipment-report/","vendor_id":"nekudos"}