{"audience":"Cost accountants, controlling teams, sales pricing teams and production managers.","authorization_objects":[{"note":"Display by material ledger valuation area","object":"K_ML_VA"},{"note":"Material master by plant","object":"M_MATE_WRK"}],"components":[],"countries":[],"effort_days_max":18,"effort_days_min":12,"effort_size":"M","faq":[{"a":"The material ledger close finalises the multi-level roll-up, the distribution between ending stock and consumption and invoices not yet received. The report estimates from the movements so far; as the period progresses and invoices arrive, the estimate approaches the final value.","q":"Why can the figure in the report differ from the periodic unit price at period end?"},{"a":"The basic calculation can be done with MBEW, MSEG, RSEG/EKBE and COEP; only the previous period periodic price column stays empty. In S/4HANA the material ledger is mandatory, so all columns are filled.","q":"Does it work in ECC systems without the material ledger?"},{"a":"No. It only reads and produces an estimate; valuation and posting are still done by the standard material ledger close.","q":"Does the report post anything?"}],"features":[{"code":"alv","label":"ALV list (sort, filter, subtotals)","note":""},{"code":"layout","label":"User-specific layout variants","note":""},{"code":"drilldown","label":"Double-click drill-down to the document","note":"Drill down from the material to CKM3N and to the documents behind the difference."},{"code":"background","label":"Runs as a background job","note":""},{"code":"excel","label":"Export to Excel","note":""}],"functions":[{"name":"K_KKB_CO_OBJECT_READ","role":"Reads the cost object of the production order"},{"name":"CONVERSION_FACTOR_GET","role":"Converts between receipt and stock units"}],"gap":"The actual unit cost (periodic unit price) only exists after the material ledger close (CKMLCP) has run. During the period CKM3N shows only the price differences collected so far; it does not roll them up across levels or include variances of production orders not yet settled. When raw material prices change quickly, teams want a cost estimate without waiting for month end and prepare it in Excel.","id":"co-open-period-actual-unit-cost","industries":[],"input_columns":[],"kind":"report","language":"en","lastmod":"2026-11-19","logic":"1. For the selected plant and period, each material's standard price and stock quantity are read from MBEW, the material ledger number and period prices from CKMLHD/CKMLCR.\n2. Purchased materials: goods receipts (MATDOC in S/4HANA, MSEG in ECC) and invoices (RSEG, EKBE) in the period are summed; goods receipt and invoice differences are taken from the price difference items in ACDOCA (per material and period). Estimated actual unit cost = (standard value + price differences of the period) / receipt quantity of the period.\n3. Produced materials: the actual costs of the period's production orders (ACDOCA in S/4HANA, COEP in ECC) and the delivered quantity (AFRU confirmations, goods receipts) are read. Because the order is not yet settled, the variance is calculated as actual cost − delivered quantity × standard price and spread per unit.\n4. Optional single-level roll-up: the estimated unit cost difference of components is multiplied by the quantities from the product cost estimate (KEKO/CKIS) and added to the higher-level material. This way a raw material price change is roughly reflected in the finished product cost.\n5. The result shows per material the standard price, the estimated actual unit cost, the difference percentage and its source (purchasing, invoice, production, roll-up). The previous period's final periodic unit price is taken from CKMLCR for comparison.\n6. The report is an estimate; it does not replace the material ledger close and posts nothing.","module":"CO","object_type":"alv_report","output_columns":[{"calculated":false,"formula":"","label":"Material","source_field":"MATNR","source_table":"MBEW"},{"calculated":false,"formula":"","label":"Price control","source_field":"VPRSV","source_table":"MBEW"},{"calculated":false,"formula":"","label":"Standard price","source_field":"STPRS","source_table":"CKMLCR"},{"calculated":true,"formula":"Sum of goods receipts and production deliveries in the period","label":"Receipt quantity in period","source_field":null,"source_table":null},{"calculated":true,"formula":"ACDOCA price difference items (goods receipt and invoice)","label":"Purchase/invoice difference","source_field":null,"source_table":null},{"calculated":true,"formula":"Order actual cost − delivered quantity × standard price","label":"Production variance","source_field":null,"source_table":null},{"calculated":true,"formula":"Component unit difference × cost estimate quantity","label":"Roll-up difference","source_field":null,"source_table":null},{"calculated":true,"formula":"(Standard value + differences) / receipt quantity of the period × price unit","label":"Estimated actual unit cost","source_field":null,"source_table":null},{"calculated":true,"formula":"(Estimated actual − standard) / standard × 100","label":"Difference %","source_field":null,"source_table":null},{"calculated":false,"formula":"","label":"Previous period periodic price","source_field":"PVPRS","source_table":"CKMLCR"},{"calculated":false,"formula":"","label":"Currency","source_field":"WAERS","source_table":"CKMLCR"}],"parameters":[{"example":"1100","kind":"parameter","label":"Valuation area (plant)","name":"P_BWKEY","ref_field":"MBEW-BWKEY","required":true},{"example":"2026","kind":"parameter","label":"Year","name":"P_BDATJ","ref_field":"CKMLCR-BDATJ","required":true},{"example":"011","kind":"parameter","label":"Period","name":"P_POPER","ref_field":"CKMLCR-POPER","required":true},{"example":"HT-*","kind":"select_option","label":"Material","name":"S_MATNR","ref_field":"MBEW-MATNR","required":false},{"example":"ROH, HALB, FERT","kind":"select_option","label":"Material type","name":"S_MTART","ref_field":"MARA-MTART","required":false},{"example":"X","kind":"checkbox","label":"Roll component differences up to the higher-level material","name":"P_ROLL","ref_field":"","required":false}],"part_of":[],"performance":"Restrict ACDOCA by plant (valuation area), period and the relevant business transaction types and read it aggregated per material. For production orders select only those with movements in the period. Keep the roll-up step optional and run the report in the background for large plants.","process":"R2R","quote_url":"https://nekuhub.com/en/request-a-quote/?report=co-open-period-actual-unit-cost","related":["co-material-price-change-debit-credit-upload","co-production-order-variance"],"releases":[],"source":"custom","standard_alternatives":[{"note":"Material price analysis; shows differences collected in the period but makes no pre-close estimate or roll-up.","tcode":"CKM3N"},{"note":"Actual costing closing cockpit; produces the final periodic price only at period end.","tcode":"CKMLCP"},{"note":"Cost analysis of a single production order; does not aggregate unit costs per material.","tcode":"KKBC_ORD"}],"summary":"A report that calculates an estimated actual unit cost per material from the actual purchase and production costs of the current period, before the month is closed and before material ledger actual costing runs. Standard price, price differences in the period, invoice differences and production order variances are shown together, so pricing and profitability decisions do not have to wait for period end.","tables":[{"access":"read","join_on":"","role":"Material's standard price, price unit and stock quantity (driving table)","table":"MBEW","variant":"both"},{"access":"read","join_on":"CKMLHD-MATNR = MBEW-MATNR AND CKMLHD-BWKEY = MBEW-BWKEY","role":"Material ledger header: cost estimate number","table":"CKMLHD","variant":"both"},{"access":"read","join_on":"CKMLCR-KALNR = CKMLHD-KALNR","role":"Standard and periodic unit price per period","table":"CKMLCR","variant":"both"},{"access":"read","join_on":"ACDOCA-MATNR = MBEW-MATNR AND ACDOCA-KALNR = CKMLHD-KALNR","role":"Price difference items and production order actual costs (S/4HANA)","table":"ACDOCA","variant":"s4"},{"access":"read","join_on":"MATDOC-MATNR = MBEW-MATNR AND MATDOC-WERKS = MBEW-BWKEY","role":"Goods receipts of the period (S/4HANA)","table":"MATDOC","variant":"s4"},{"access":"read","join_on":"MSEG-MATNR = MBEW-MATNR AND MSEG-WERKS = MBEW-BWKEY","role":"Goods receipts of the period (ECC)","table":"MSEG","variant":"ecc"},{"access":"read","join_on":"COEP-OBJNR = AUFK-OBJNR","role":"Production order actual costs (ECC)","table":"COEP","variant":"ecc"},{"access":"read","join_on":"EKBE-MATNR = MBEW-MATNR AND EKBE-WERKS = MBEW-BWKEY","role":"Purchase order history: goods receipt and invoice values","table":"EKBE","variant":"both"},{"access":"read","join_on":"RSEG-MATNR = MBEW-MATNR AND RSEG-WERKS = MBEW-BWKEY","role":"Invoice items and invoice price difference","table":"RSEG","variant":"both"},{"access":"read","join_on":"","role":"Production orders with movements in the period","table":"AUFK","variant":"both"},{"access":"read","join_on":"AFRU-AUFNR = AUFK-AUFNR","role":"Production confirmations and delivered quantity","table":"AFRU","variant":"both"},{"access":"read","join_on":"KEKO-MATNR = MBEW-MATNR AND KEKO-WERKS = MBEW-BWKEY","role":"Product cost estimate header (for the roll-up)","table":"KEKO","variant":"both"},{"access":"read","join_on":"CKIS-KALNR = KEKO-KALNR","role":"Cost estimate items: component quantities","table":"CKIS","variant":"both"}],"title":"Open-Period Estimated Actual Unit Cost Report (Before the Material Ledger Close)","url":"https://nekuhub.com/en/reports/open-period-estimated-actual-unit-cost-report/","vendor_id":"nekudos"}