{"audience":"Buyers, purchasing managers and supply chain planners.","authorization_objects":[{"note":"Display authorization by purchasing document type","object":"M_BEST_BSA"},{"note":"Display authorization by purchasing organization","object":"M_BEST_EKO"},{"note":"Display authorization by purchasing group","object":"M_BEST_EKG"},{"note":"Display authorization by plant","object":"M_BEST_WRK"}],"components":[],"countries":[],"effort_days_max":4,"effort_days_min":2,"effort_size":"S","faq":[{"a":"For each schedule line, EKET-MENGE (scheduled quantity) minus EKET-WEMNG (quantity delivered). Items flagged as delivery completed (EKPO-ELIKZ) are not treated as open.","q":"How is the open order quantity calculated?"},{"a":"Yes. EKKO, EKPO and EKET keep the same structure in S/4HANA. For a clean core approach, the I_PurchaseOrderItemAPI01 CDS view can replace EKPO.","q":"Does this report work on S/4HANA?"},{"a":"ME2L gives the order list; it does not give days late, total open value per vendor and schedule-line detail on the same screen. The custom report combines them and can distribute the result by email.","q":"Why build a custom report when ME2L exists?"}],"features":[{"code":"alv","label":"ALV list (sort, filter, subtotals)","note":""},{"code":"layout","label":"User-specific layout variants","note":""},{"code":"drilldown","label":"Double-click drill-down to the document","note":"Double-clicking the order number opens ME23N."},{"code":"excel","label":"Export to Excel","note":""},{"code":"background","label":"Runs as a background job","note":""},{"code":"email","label":"Send the result by email","note":"Each purchasing group can receive its own delays weekly."}],"functions":[],"gap":"ME2L and ME2N list open orders, but they do not show the total open value per vendor, the number of days late and the open quantity per schedule line on one screen. Teams usually build this by merging several lists in Excel. The custom report does it in one run and can email it weekly to each purchasing group.","id":"mm-open-po-by-vendor","industries":[],"input_columns":[],"kind":"report","language":"en","lastmod":"2026-11-16","logic":"1. EKKO and EKPO are read with the selection-screen criteria; items with a deletion indicator (LOEKZ) or the delivery completed flag (ELIKZ) are skipped.\n2. The EKET schedule lines of each item are read. Open quantity = scheduled quantity (MENGE) − quantity delivered (WEMNG). Lines with zero open quantity are skipped.\n3. Open value = open quantity × net price (NETPR) ÷ price unit (PEINH). If the order price unit differs from the order unit, a conversion is applied.\n4. Days late = key date − delivery date (EINDT). With \"Overdue only\" selected, only positive values remain.\n5. The vendor name is added from LFA1. The result is shown in ALV with subtotals per vendor.","module":"MM","object_type":"alv_report","output_columns":[{"calculated":false,"formula":"","label":"Purchase order","source_field":"EBELN","source_table":"EKKO"},{"calculated":false,"formula":"","label":"Item","source_field":"EBELP","source_table":"EKPO"},{"calculated":false,"formula":"","label":"Vendor","source_field":"LIFNR","source_table":"EKKO"},{"calculated":false,"formula":"","label":"Vendor name","source_field":"NAME1","source_table":"LFA1"},{"calculated":false,"formula":"","label":"Material","source_field":"MATNR","source_table":"EKPO"},{"calculated":false,"formula":"","label":"Short text","source_field":"TXZ01","source_table":"EKPO"},{"calculated":false,"formula":"","label":"Plant","source_field":"WERKS","source_table":"EKPO"},{"calculated":false,"formula":"","label":"Delivery date","source_field":"EINDT","source_table":"EKET"},{"calculated":false,"formula":"","label":"Scheduled qty","source_field":"MENGE","source_table":"EKET"},{"calculated":false,"formula":"","label":"Received qty","source_field":"WEMNG","source_table":"EKET"},{"calculated":true,"formula":"EKET-MENGE − EKET-WEMNG","label":"Open qty","source_field":null,"source_table":null},{"calculated":false,"formula":"","label":"Unit","source_field":"MEINS","source_table":"EKPO"},{"calculated":true,"formula":"Open qty × EKPO-NETPR ÷ EKPO-PEINH","label":"Open value","source_field":null,"source_table":null},{"calculated":false,"formula":"","label":"Currency","source_field":"WAERS","source_table":"EKKO"},{"calculated":true,"formula":"Key date − EKET-EINDT (negative value: days until due)","label":"Days late","source_field":null,"source_table":null}],"parameters":[{"example":"1000","kind":"select_option","label":"Company code","name":"S_BUKRS","ref_field":"EKKO-BUKRS","required":true},{"example":"1000","kind":"select_option","label":"Purchasing organization","name":"S_EKORG","ref_field":"EKKO-EKORG","required":false},{"example":"001","kind":"select_option","label":"Purchasing group","name":"S_EKGRP","ref_field":"EKKO-EKGRP","required":false},{"example":"100245","kind":"select_option","label":"Vendor","name":"S_LIFNR","ref_field":"EKKO-LIFNR","required":false},{"example":"1000","kind":"select_option","label":"Plant","name":"S_WERKS","ref_field":"EKPO-WERKS","required":false},{"example":"RM-1001","kind":"select_option","label":"Material","name":"S_MATNR","ref_field":"EKPO-MATNR","required":false},{"example":"01.10.2026 – 30.11.2026","kind":"select_option","label":"Delivery date range","name":"S_EINDT","ref_field":"EKET-EINDT","required":false},{"example":"16.11.2026","kind":"parameter","label":"Key date for delay calculation (default: today)","name":"P_KEYDT","ref_field":"SY-DATUM","required":true},{"example":"X","kind":"checkbox","label":"Overdue only","name":"P_OVERDU","ref_field":"","required":false}],"part_of":["p2p-purchasing-payables-pack"],"performance":"Narrow the EKKO selection by company code and purchasing organization. Read EKET in a single JOIN or FOR ALL ENTRIES. On very large systems, run the report as a nightly background job.","process":"P2P","quote_url":"https://nekuhub.com/en/request-a-quote/?report=mm-open-po-by-vendor","related":["fi-vendor-open-items-aging","mm-stock-aging"],"releases":[],"source":"custom","standard_alternatives":[{"note":"Lists open orders per vendor with scope of list WE101; no days late and no total open value per vendor.","tcode":"ME2L"},{"note":"Open quantity and value can be added in ALV, but it does not calculate delay per schedule line.","tcode":"ME2N"}],"summary":"A custom ALV report that shows, per vendor, the quantity not yet received, the open order value and the days of delay since the delivery date in a single list. Purchasing teams see which vendor is late on which item, and by how many days, without stitching data together in Excel.","tables":[{"access":"read","join_on":"","role":"Vendor, company code, purchasing organization and currency (driving table)","table":"EKKO","variant":"both"},{"access":"read","join_on":"EKPO-EBELN = EKKO-EBELN","role":"Material, plant and price; deleted and completed items are excluded","table":"EKPO","variant":"both"},{"access":"read","join_on":"EKET-EBELN = EKPO-EBELN AND EKET-EBELP = EKPO-EBELP","role":"Delivery date, scheduled and delivered quantity","table":"EKET","variant":"both"},{"access":"read","join_on":"LFA1-LIFNR = EKKO-LIFNR","role":"Vendor name","table":"LFA1","variant":"both"},{"access":"read","join_on":"PurchaseOrder = EKKO-EBELN","role":"In S/4HANA it can replace EKPO with a clean core approach","table":"I_PurchaseOrderItemAPI01","variant":"s4"}],"title":"Open Purchase Orders by Vendor Report","url":"https://nekuhub.com/en/reports/open-purchase-orders-by-vendor-report/","vendor_id":"nekudos"}