{"audience":"Maintenance managers, maintenance planners, team leads and site managers.","authorization_objects":[{"note":"Display orders by maintenance planning plant","object":"I_IWERK"},{"note":"Authorization by maintenance order type","object":"I_AUART"}],"components":[],"countries":[],"effort_days_max":5,"effort_days_min":3,"effort_size":"S","faq":[{"a":"The value shows how many weeks the work center needs to finish its open work without taking new jobs. In maintenance management 2–4 weeks is usually seen as healthy; a very low value means idle capacity, a very high value means accumulated risk.","q":"How should backlog weeks be read?"},{"a":"Yes. Orders waiting for material can be flagged in a separate column through a user status or an open reservation check; for detailed tracking, the Maintenance Orders Waiting for Material report is used.","q":"Can orders waiting for material be separated?"},{"a":"Yes. AUFK, AFIH, AFKO, AFVC and AFVV keep the same structure in S/4HANA. For a clean core approach, CDS views such as I_MaintOrderOperationData can be used.","q":"Does it work on S/4HANA?"}],"features":[{"code":"alv","label":"ALV list (sort, filter, subtotals)","note":""},{"code":"layout","label":"User-specific layout variants","note":""},{"code":"drilldown","label":"Double-click drill-down to the document","note":"Double-clicking the order number opens IW33."},{"code":"excel","label":"Export to Excel","note":""},{"code":"background","label":"Runs as a background job","note":""},{"code":"email","label":"Send the result by email","note":"Each planner group can receive its own overdue orders weekly."}],"functions":[],"gap":"The IW38 and IW39 order lists show basic dates, but they do not calculate days late since the finish date, remaining work hours or how many weeks of backlog each work center carries. The IW37N operation list shows remaining work but not the delay or the ratio to capacity. The backlog indicator is usually built every week by merging two lists in Excel.","id":"pm-overdue-maintenance-orders-backlog","industries":[],"input_columns":[],"kind":"report","language":"en","lastmod":"2026-11-17","logic":"1. Maintenance orders (AUTYP = 30) are read from AUFK, and planning plant (IWERK), planner group (INGPR), priority (PRIOK), maintenance activity type (ILART), equipment and main work center (GEWRK) from AFIH. Orders with CRTD or REL and without active TECO (I0045), CLSD (I0046) or deletion flag (I0076) in JEST remain.\n2. Days late = key date − AFKO-GLTRP. With overdue only selected, only positive values remain.\n3. Operations are read from AFVC and AFVV through AFKO-AUFPL. Planned work AFVV-ARBEI, actual work AFVV-ISMNW; the unit AFVV-ARBEH is converted to hours. Remaining work = ARBEI − ISMNW, at least zero.\n4. The main work center code is found with AFIH-GEWRK = CRHD-OBJID. Backlog (weeks) = total remaining work of all open orders of the work center ÷ weekly available hours (from the work center capacity; the default on the selection screen when not defined).\n5. ALV shows subtotals per work center and priority; overdue priority 1 orders are highlighted.","module":"PM","object_type":"alv_report","output_columns":[{"calculated":false,"formula":"","label":"Maintenance order","source_field":"AUFNR","source_table":"AUFK"},{"calculated":false,"formula":"","label":"Order type","source_field":"AUART","source_table":"AUFK"},{"calculated":false,"formula":"","label":"Short text","source_field":"KTEXT","source_table":"AUFK"},{"calculated":false,"formula":"","label":"Equipment","source_field":"EQUNR","source_table":"AFIH"},{"calculated":false,"formula":"","label":"Priority","source_field":"PRIOK","source_table":"AFIH"},{"calculated":false,"formula":"","label":"Main work center","source_field":"ARBPL","source_table":"CRHD"},{"calculated":false,"formula":"","label":"Basic start","source_field":"GSTRP","source_table":"AFKO"},{"calculated":false,"formula":"","label":"Basic finish","source_field":"GLTRP","source_table":"AFKO"},{"calculated":true,"formula":"Key date − AFKO-GLTRP","label":"Days late","source_field":null,"source_table":null},{"calculated":true,"formula":"Σ AFVV-ARBEI, converted to hours","label":"Planned work (h)","source_field":null,"source_table":null},{"calculated":true,"formula":"Σ AFVV-ISMNW, converted to hours","label":"Actual work (h)","source_field":null,"source_table":null},{"calculated":true,"formula":"Planned work − actual work (at least 0)","label":"Remaining work (h)","source_field":null,"source_table":null},{"calculated":true,"formula":"Total remaining work of the work center ÷ weekly available hours","label":"Work center backlog (weeks)","source_field":null,"source_table":null},{"calculated":true,"formula":"Texts of the active statuses in JEST","label":"System status","source_field":null,"source_table":null}],"parameters":[{"example":"1000","kind":"select_option","label":"Maintenance planning plant","name":"S_IWERK","ref_field":"AFIH-IWERK","required":true},{"example":"M01","kind":"select_option","label":"Planner group","name":"S_INGPR","ref_field":"AFIH-INGPR","required":false},{"example":"MEK-01","kind":"select_option","label":"Main work center","name":"S_ARBPL","ref_field":"CRHD-ARBPL","required":false},{"example":"PM01","kind":"select_option","label":"Order type","name":"S_AUART","ref_field":"AUFK-AUART","required":false},{"example":"1","kind":"select_option","label":"Priority","name":"S_PRIOK","ref_field":"AFIH-PRIOK","required":false},{"example":"001","kind":"select_option","label":"Maintenance activity type","name":"S_ILART","ref_field":"AFIH-ILART","required":false},{"example":"17.11.2026","kind":"parameter","label":"Key date (default: today)","name":"P_KEYDT","ref_field":"SY-DATUM","required":true},{"example":"40","kind":"parameter","label":"Default weekly capacity (hours per work center)","name":"P_WKHRS","ref_field":"","required":false},{"example":"X","kind":"checkbox","label":"Overdue only","name":"P_OVERDU","ref_field":"","required":false}],"part_of":["pm-maintenance-kpi-pack"],"performance":"Narrow AFIH by planning plant and planner group; read operations once with FOR ALL ENTRIES on AFKO-AUFPL. The report can run in the background before the morning meeting and be distributed by email.","quote_url":"https://nekuhub.com/en/request-a-quote/?report=pm-overdue-maintenance-orders-backlog","related":["pm-open-notifications-without-order","pm-orders-waiting-for-material"],"releases":[],"source":"custom","standard_alternatives":[{"note":"The order list has the dates; no days late, remaining work or backlog weeks.","tcode":"IW38"},{"note":"Shows remaining work per operation; no delay and no ratio to capacity.","tcode":"IW37N"}],"summary":"A custom ALV report that lists open maintenance orders past their basic finish date with days late and remaining work hours, and calculates how many weeks of backlog each work center carries. The maintenance manager sees which team is behind and which high-priority job is waiting, on one screen.","tables":[{"access":"read","join_on":"","role":"Order type, short text and object number (driving table)","table":"AUFK","variant":"both"},{"access":"read","join_on":"AFIH-AUFNR = AUFK-AUFNR","role":"Planning plant, planner group, priority, equipment and main work center","table":"AFIH","variant":"both"},{"access":"read","join_on":"AFKO-AUFNR = AUFK-AUFNR","role":"Basic start and finish dates, routing number","table":"AFKO","variant":"both"},{"access":"read","join_on":"AFVC-AUFPL = AFKO-AUFPL","role":"Order operations","table":"AFVC","variant":"both"},{"access":"read","join_on":"AFVV-AUFPL = AFVC-AUFPL AND AFVV-APLZL = AFVC-APLZL","role":"Planned and actual work hours","table":"AFVV","variant":"both"},{"access":"read","join_on":"CRHD-OBJTY = 'A' AND CRHD-OBJID = AFIH-GEWRK","role":"Main work center code","table":"CRHD","variant":"both"},{"access":"read","join_on":"JEST-OBJNR = AUFK-OBJNR","role":"Active system statuses","table":"JEST","variant":"both"}],"title":"Overdue Maintenance Orders and Backlog by Work Center Report","url":"https://nekuhub.com/en/reports/overdue-maintenance-orders-and-backlog-report/","vendor_id":"nekudos"}