# Planned Order Conversion Readiness and Component Availability Report

> A custom ALV report that ranks planned orders whose opening date has arrived by how much of their component demand today's stock covers. For each planned order the number of short components, the readiness percentage and the most critical component appear on the same line, so planners convert the fully ready orders first.

- Type: Report, Custom development, ALV report
- Module: PP
- Estimated effort: M (4–6 working days)
- Last updated: 2026-11-17
- URL: https://nekuhub.com/en/reports/planned-order-conversion-readiness-component-availability-report/


## Why is the standard not enough?

MD16 and CO41 list and convert planned orders collectively by MRP controller, but the list does not show whether stock covers the components. The availability check only runs after the production order exists, or separately for each planned order. Several planned orders that need the same component share the stock, and the standard lists do not show this sharing. As a result orders with missing material are converted too and then wait on the shop floor.

### Closest standard alternatives

- MD16: Lists planned orders collectively; component availability and readiness are not shown.
- CO41: Converts planned orders collectively, but does not rank missing components before conversion.

## Tables used

| Table | Role | Access | Join | System |
|---|---|---|---|---|
| PLAF | Planned order: material, quantity, opening, start and finish date (driving table) | Read | - | ECC + S/4 |
| RESB | Component requirements of the planned order | Read | RESB-PLNUM = PLAF-PLNUM | ECC + S/4 |
| MARD | Unrestricted-use stock of the components | Read | MARD-MATNR = RESB-MATNR AND MARD-WERKS = RESB-WERKS | ECC + S/4 |
| MARC | Production storage location and MRP controller | Read | MARC-MATNR = PLAF-MATNR AND MARC-WERKS = PLAF-PLWRK | ECC + S/4 |
| MAKT | Material and component descriptions | Read | MAKT-MATNR = PLAF-MATNR AND MAKT-SPRAS = SY-LANGU | ECC + S/4 |

## Selection screen parameters

| Parameter | Description | Type | Reference field | Required |
|---|---|---|---|---|
| S_PLWRK | Planning plant | Range / multiple | PLAF-PLWRK | Yes |
| S_DISPO | MRP controller | Range / multiple | PLAF-DISPO | No |
| S_MATNR | Material | Range / multiple | PLAF-MATNR | No |
| S_PAART | Planned order type | Range / multiple | PLAF-PAART | No |
| S_PERTR | Opening date range | Range / multiple | PLAF-PERTR | Yes |
| P_ALLOC | Allocate stock by requirement date | Checkbox | - | No |
| P_LGPRO | Count only stock in the production storage location | Checkbox | - | No |
| P_READY | Only convertible orders | Checkbox | - | No |

## Output columns

| Column | Source |
|---|---|
| Planned order | PLAF-PLNUM |
| Material | PLAF-MATNR |
| Description | MAKT-MAKTX |
| MRP controller | PLAF-DISPO |
| Quantity | PLAF-GSMNG |
| Unit | PLAF-MEINS |
| Opening date | PLAF-PERTR |
| Start date | PLAF-PSTTR |
| Finish date | PLAF-PEDTR |
| Firmed | PLAF-AUFFX |
| Components | Calculated: Number of evaluated RESB items of the planned order |
| Short components | Calculated: Number of items where allocated stock < (RESB-BDMNG − RESB-ENMNG) |
| Readiness % | Calculated: (Components − short components) ÷ components × 100 |
| Critical component | RESB-MATNR |
| Status | Calculated: Convertible, partial or waiting |

## How does the report work?

1. In-house planned orders (BESKZ = 'E', PAART by selection) are read from PLAF by the plant, MRP controller and opening date range on the selection screen.
2. The component requirements of the planned orders are read from RESB (PLNUM filled); deleted (XLOEK), bulk (SCHGT) and phantom (DUMPS) items are left out of the evaluation.
3. Unrestricted stock of the components is read from MARD-LABST as the plant total or, by selection, per production storage location.
4. With 'allocate by date' selected, requirements for the same component are sorted by requirement date (BDTER) and stock is consumed in that order; otherwise every planned order sees the full stock.
5. Per planned order the number of components, the number of short components and the readiness percentage (covered components ÷ all components × 100) are calculated. The component with the lowest coverage is written as the critical component.
6. Status: 'Convertible' when all components are covered, 'Partial' when some are short, 'Waiting' when none are covered. The list is sorted by status first, then by start date.

## Authorization objects

- M_MTDI_ORG: Display planned orders by plant and MRP controller
- C_AFKO_AWK: Order authorization for converting from the list

## Frequently asked questions

### Does the report convert orders?

No, the report only reads. 'Convertible' lines can be selected and passed to CO41, or converted with a separate background program; that extension is a separate effort item.

### Is stock in quality inspection counted?

By default only unrestricted stock (MARD-LABST) is counted. Optionally, stock in quality inspection (MARD-INSME) can be shown in a separate 'available soon' column.

### Are open purchase orders taken into account?

The base version only considers stock on hand. If required, open purchase order deliveries (EKET) due before the start date can be added as a second coverage source.

---