{"audience":"Cost accountants, controllers, production planners and month-end closing teams.","authorization_objects":[{"note":"Display production orders by plant and order type","object":"C_AFKO_AWK"},{"note":"Display goods movements by plant","object":"M_MSEG_WWA"}],"components":[],"countries":[],"effort_days_max":5,"effort_days_min":3,"effort_size":"S","faq":[{"a":"Roughly, but not exactly. The WIP calculation also includes activity costs and overhead. This report only looks at material movements and is designed to quickly find the orders that need an explanation before the WIP run.","q":"Is the open balance the same as WIP?"},{"a":"All 101 receipts linked to an order item are added to the receipt value. If a different movement type is used for by-products, those types are added to the selection during installation.","q":"How are co-product or by-product receipts counted?"},{"a":"Yes. In S/4HANA AUFM is read from MATDOC as a compatibility view; MATDOC or released material document CDS views can be used directly if preferred.","q":"Does it work on S/4HANA?"}],"features":[{"code":"alv","label":"ALV list (sort, filter, subtotals)","note":""},{"code":"layout","label":"User-specific layout variants","note":""},{"code":"drilldown","label":"Double-click drill-down to the document","note":"The order number opens CO03, the value columns open the order's goods movements."},{"code":"excel","label":"Export to Excel","note":""},{"code":"background","label":"Runs as a background job","note":""},{"code":"email","label":"Send the result by email","note":"Can be sent to cost accounting and planning before closing."}],"functions":[],"gap":"MB51 lists 261 (consumption) and 101 (goods receipt) movements as separate lines; it does not flag orders with consumption and no receipt and does not calculate the open balance per order. The COOIS goods movement view does not give the total value per order or the waiting time either. At month end these orders are found by matching two lists in Excel.","id":"pp-consumption-without-goods-receipt","industries":[],"input_columns":[],"kind":"report","language":"en","lastmod":"2026-11-17","logic":"1. Production orders (AUTYP = 10) of the selected plant are read from AUFK. Closed (CLSD, I0046) and deleted (I0076) orders are skipped with JEST; technically completed orders (TECO, I0045) are included by selection.\n2. Goods movements of the order are read from AUFM. Consumption: movement type 261 plus, 262 minus. Goods receipt: 101 plus, 102 minus. The amount is AUFM-DMBTR, the sign follows AUFM-SHKZG.\n3. Orders whose first consumption is before the cutoff date and whose delivery percentage (AFPO-WEMNG ÷ AFPO-PSMNG × 100) is below the threshold are listed.\n4. Open balance = consumed value − goods receipt value. This is the balance to explain before the month-end WIP calculation.\n5. Waiting time = today − first consumption date. ALV shows subtotals per order type and is sorted by open balance, highest first.","module":"PP","object_type":"alv_report","output_columns":[{"calculated":false,"formula":"","label":"Production order","source_field":"AUFNR","source_table":"AUFM"},{"calculated":false,"formula":"","label":"Order type","source_field":"AUART","source_table":"AUFK"},{"calculated":false,"formula":"","label":"Material","source_field":"MATNR","source_table":"AFPO"},{"calculated":false,"formula":"","label":"Description","source_field":"MAKTX","source_table":"MAKT"},{"calculated":false,"formula":"","label":"Order qty","source_field":"PSMNG","source_table":"AFPO"},{"calculated":false,"formula":"","label":"Received qty","source_field":"WEMNG","source_table":"AFPO"},{"calculated":false,"formula":"","label":"Unit","source_field":"MEINS","source_table":"AFPO"},{"calculated":true,"formula":"Smallest AUFM-BUDAT of 261 movements","label":"First consumption","source_field":null,"source_table":null},{"calculated":true,"formula":"Largest AUFM-BUDAT of 261 movements","label":"Last consumption","source_field":null,"source_table":null},{"calculated":true,"formula":"Σ AUFM-DMBTR (261 plus, 262 minus)","label":"Consumed value","source_field":null,"source_table":null},{"calculated":true,"formula":"Σ AUFM-DMBTR (101 plus, 102 minus)","label":"Receipt value","source_field":null,"source_table":null},{"calculated":true,"formula":"Consumed value − receipt value","label":"Open balance","source_field":null,"source_table":null},{"calculated":false,"formula":"","label":"Currency","source_field":"WAERS","source_table":"AUFM"},{"calculated":true,"formula":"Today − first consumption","label":"Waiting (days)","source_field":null,"source_table":null},{"calculated":true,"formula":"Texts of the active statuses in JEST","label":"System status","source_field":null,"source_table":null}],"parameters":[{"example":"1000","kind":"select_option","label":"Plant","name":"S_WERKS","ref_field":"AUFK-WERKS","required":true},{"example":"PP01","kind":"select_option","label":"Order type","name":"S_AUART","ref_field":"AUFK-AUART","required":false},{"example":"1000398","kind":"select_option","label":"Production order","name":"S_AUFNR","ref_field":"AUFM-AUFNR","required":false},{"example":"FG-5003","kind":"select_option","label":"Material","name":"S_MATNR","ref_field":"AFPO-MATNR","required":false},{"example":"31.10.2026","kind":"parameter","label":"Cutoff date (first consumption before this date)","name":"P_CUTOF","ref_field":"SY-DATUM","required":true},{"example":"10","kind":"parameter","label":"Delivery percentage threshold (%)","name":"P_RECPCT","ref_field":"","required":false},{"example":"X","kind":"checkbox","label":"Include technically completed orders","name":"P_TECO","ref_field":"","required":false}],"part_of":["co-product-cost-variance-pack"],"performance":"Read AUFM with FOR ALL ENTRIES on the order numbers and restrict movement types to 101, 102, 261 and 262. With a very large number of open orders, run the report as a background job one day before closing.","process":"R2R","quote_url":"https://nekuhub.com/en/request-a-quote/?report=pp-consumption-without-goods-receipt","related":["pp-auto-teco-production-orders","pp-cogi-failed-goods-movements-aging"],"releases":[],"source":"custom","standard_alternatives":[{"note":"Lists consumption and goods receipt on separate lines; it does not flag orders with consumption and no receipt.","tcode":"MB51"},{"note":"Shows goods movements per order; no open balance and no waiting time.","tcode":"COOIS"}],"summary":"A custom ALV report that lists production orders with posted component consumption but no or very little goods receipt, with consumed value, receipt value, open balance and waiting time. Orders to check before month-end WIP and variance calculation appear in one list.","tables":[{"access":"read","join_on":"","role":"Goods movements of the order: consumption and goods receipt (driving table)","table":"AUFM","variant":"both"},{"access":"read","join_on":"AUFK-AUFNR = AUFM-AUFNR","role":"Order type, plant and object number","table":"AUFK","variant":"both"},{"access":"read","join_on":"AFKO-AUFNR = AUFM-AUFNR","role":"MRP controller and planned dates","table":"AFKO","variant":"both"},{"access":"read","join_on":"AFPO-AUFNR = AUFM-AUFNR","role":"Header material, order quantity and quantity received","table":"AFPO","variant":"both"},{"access":"read","join_on":"JEST-OBJNR = AUFK-OBJNR","role":"TECO, CLSD and deletion flag check","table":"JEST","variant":"both"},{"access":"read","join_on":"MAKT-MATNR = AFPO-MATNR AND MAKT-SPRAS = SY-LANGU","role":"Material description","table":"MAKT","variant":"both"}],"title":"Production Orders with Consumption but No Goods Receipt Report","url":"https://nekuhub.com/en/reports/production-orders-with-consumption-but-no-goods-receipt-report/","vendor_id":"nekudos"}