{"audience":"Textile production managers, plant managers, production planning and costing teams.","authorization_objects":[{"note":"Confirmation display authorization by plant and order type","object":"C_AFRU_AWK"},{"note":"Production order display authorization","object":"C_AFKO_AWK"}],"components":[],"countries":[],"effort_days_max":7,"effort_days_min":4,"effort_size":"M","faq":[{"a":"If the conversion between kg and metres is defined in MARM as an alternative unit, that factor is used. If not, the line is flagged with a warning and the metre column stays empty, which also makes the missing master data visible.","q":"How are metres found if confirmations are posted in kilograms?"},{"a":"AFRU has no shift field. A shift column can be added by matching the confirmation start time (ISDZ) with the work center's shift calendar; this adds about 1 day to the estimate.","q":"Can I see the figures per shift?"},{"a":"Yes. AFRU, CRHD, AFVC and MARM keep the same structure on S/4HANA; the report runs without changes.","q":"Does it work on S/4HANA?"}],"features":[{"code":"alv","label":"ALV list (sort, filter, subtotals)","note":""},{"code":"layout","label":"User-specific layout variants","note":"The machine, process and quality groupings can be saved as separate layouts."},{"code":"drilldown","label":"Double-click drill-down to the document","note":"Double-clicking a line shows the confirmations of that group, and from there CO14 opens a single confirmation."},{"code":"excel","label":"Export to Excel","note":""},{"code":"background","label":"Runs as a background job","note":"The previous day's output can be emailed every morning."}],"functions":[],"gap":"COOIS lists operations and confirmations, but it does not convert the confirmation unit into metres and m², does not total by machine, process and quality, and does not calculate output per machine hour. In textile companies this data is usually combined by hand in Excel for the daily production meeting. The custom report produces the same table in one run.","id":"pp-production-output-report","industries":["textile"],"input_columns":[],"kind":"report","language":"en","lastmod":"2026-11-17","logic":"1. AFRU is read by plant and posting date (BUDAT); reversed confirmations (STOKZ = X) and reversal confirmations (STZHL filled) are excluded.\n2. The confirmation's work center (AFRU-ARBID → CRHD-OBJID, OBJTY = 'A') gives the machine; the machine description comes from CRTX. The process is the operation's standard text key (AFVC-KTSCH; e.g. weaving, dyeing, finishing, inspection).\n3. The quality is the material produced by the order (AFPO-MATNR); its description comes from MAKT.\n4. If the confirmation unit (AFRU-MEINH) is not metres, it is converted with the MARM factors (UMREZ/UMREN). m² = metres × width; the width is converted to metres from MARA-BREIT and its unit MEABM. If the material has an M2 alternative unit, the MARM factor is used directly.\n5. Scrap (XMNGA) is converted the same way; scrap % = scrap / (good + scrap) × 100.\n6. Machine hours come from the machine time activity of the confirmation (ISM01, converted to hours by unit ILE01); metres/hour = good metres / machine hours. The ALV shows subtotals by the selected grouping (machine, process or quality).","module":"PP","object_type":"alv_report","output_columns":[{"calculated":false,"formula":"","label":"Plant","source_field":"WERKS","source_table":"CRHD"},{"calculated":false,"formula":"","label":"Machine","source_field":"ARBPL","source_table":"CRHD"},{"calculated":false,"formula":"","label":"Machine description","source_field":"KTEXT","source_table":"CRTX"},{"calculated":false,"formula":"","label":"Process","source_field":"KTSCH","source_table":"AFVC"},{"calculated":false,"formula":"","label":"Quality","source_field":"MATNR","source_table":"AFPO"},{"calculated":false,"formula":"","label":"Quality description","source_field":"MAKTX","source_table":"MAKT"},{"calculated":true,"formula":"Σ AFRU-LMNGA converted to metres via MARM","label":"Good output (m)","source_field":null,"source_table":null},{"calculated":true,"formula":"Good metres × width (m)","label":"Good output (m²)","source_field":null,"source_table":null},{"calculated":true,"formula":"Σ AFRU-XMNGA converted to metres","label":"Scrap (m)","source_field":null,"source_table":null},{"calculated":true,"formula":"Scrap / (good + scrap) × 100","label":"Scrap %","source_field":null,"source_table":null},{"calculated":true,"formula":"Σ AFRU-ISM01 converted to hours","label":"Machine hours","source_field":null,"source_table":null},{"calculated":true,"formula":"Good metres / machine hours","label":"Metres / hour","source_field":null,"source_table":null},{"calculated":true,"formula":"Count of distinct AFRU-AUFNR","label":"Number of orders","source_field":null,"source_table":null}],"parameters":[{"example":"1000","kind":"select_option","label":"Plant","name":"S_WERKS","ref_field":"CRHD-WERKS","required":true},{"example":"01.11.2026 – 16.11.2026","kind":"select_option","label":"Confirmation posting date","name":"S_BUDAT","ref_field":"AFRU-BUDAT","required":true},{"example":"DK-*","kind":"select_option","label":"Machine (work center)","name":"S_ARBPL","ref_field":"CRHD-ARBPL","required":false},{"example":"DOKUMA","kind":"select_option","label":"Process (standard text key)","name":"S_KTSCH","ref_field":"AFVC-KTSCH","required":false},{"example":"KMS-*","kind":"select_option","label":"Quality (material)","name":"S_MATNR","ref_field":"AFPO-MATNR","required":false},{"example":"Makine","kind":"radio","label":"Grouping: machine / process / quality","name":"P_GROUP","ref_field":"","required":true}],"part_of":[],"performance":"Limit AFRU by plant and posting date; exclude reversals in the database. Read CRHD, CRTX, MARA and MARM once with the distinct keys found in the confirmations and buffer them. Run selections covering a full year in the background.","quote_url":"https://nekuhub.com/en/request-a-quote/?report=pp-production-output-report","related":["pp-schedule-adherence","pp-scrap-yield-by-work-center","pp-weekly-capacity-load-by-work-center"],"releases":[],"source":"custom","standard_alternatives":[{"note":"Lists operations and confirmations; no metre/m² conversion and no machine, process and quality totals.","tcode":"COOIS"},{"note":"Displays a single confirmation; no period totals and no efficiency calculation.","tcode":"CO14"}],"summary":"A custom ALV report that totals good output and scrap from production confirmations by machine, process (weaving, dyeing, finishing, inspection) and quality in metres and m². Output confirmed in different units is converted into one unit; metres per machine hour and the scrap rate appear on the same line.","tables":[{"access":"read","join_on":"","role":"Confirmations: good quantity, scrap, unit, machine time (driving table)","table":"AFRU","variant":"both"},{"access":"read","join_on":"CRHD-OBJTY = 'A' AND CRHD-OBJID = AFRU-ARBID","role":"Machine (work center) and plant","table":"CRHD","variant":"both"},{"access":"read","join_on":"CRTX-OBJTY = CRHD-OBJTY AND CRTX-OBJID = CRHD-OBJID","role":"Machine description","table":"CRTX","variant":"both"},{"access":"read","join_on":"AFVC-AUFPL = AFRU-AUFPL AND AFVC-APLZL = AFRU-APLZL","role":"Standard text key of the operation (process)","table":"AFVC","variant":"both"},{"access":"read","join_on":"AFPO-AUFNR = AFRU-AUFNR","role":"Quality (material) produced","table":"AFPO","variant":"both"},{"access":"read","join_on":"MAKT-MATNR = AFPO-MATNR","role":"Quality description","table":"MAKT","variant":"both"},{"access":"read","join_on":"MARA-MATNR = AFPO-MATNR","role":"Fabric width and its unit","table":"MARA","variant":"both"},{"access":"read","join_on":"MARM-MATNR = AFPO-MATNR","role":"Unit conversion factors (M, M2, KG)","table":"MARM","variant":"both"}],"title":"Production Output by Machine, Process and Quality Report (Metres and m²)","url":"https://nekuhub.com/en/reports/production-output-by-machine-process-quality-metres-m2-report/","vendor_id":"nekudos"}