{"audience":"Production managers, planning teams, and operational excellence or KPI reporting teams.","authorization_objects":[{"note":"Display production orders by plant and order type","object":"C_AFKO_AWK"}],"components":[],"countries":[],"effort_days_max":4,"effort_days_min":3,"effort_size":"S","faq":[{"a":"From the customer's and the warehouse's point of view an order is finished when the product enters stock; that date is held in AFPO-LTRMI. If required, the last confirmation date (AFKO-GETRI) can be shown as a second finish measure in a separate column.","q":"Why is the last goods receipt date used for the finish?"},{"a":"The report uses the current basic dates of the order. If measurement against the order's first planned date is required, the original value can be read from change documents; this extension adds about one day.","q":"Which planned date is used for rescheduled orders?"},{"a":"Yes. AFKO, AFPO and AUFK keep the same structure in S/4HANA; the report runs without changes.","q":"Does this report work on S/4HANA?"}],"features":[{"code":"alv","label":"ALV list (sort, filter, subtotals)","note":""},{"code":"layout","label":"User-specific layout variants","note":""},{"code":"drilldown","label":"Double-click drill-down to the document","note":"The order number opens CO03."},{"code":"excel","label":"Export to Excel","note":""},{"code":"background","label":"Runs as a background job","note":""},{"code":"email","label":"Send the result by email","note":"The monthly summary can be sent automatically to production management."}],"functions":[],"gap":"COOIS can show planned and actual dates as columns, but it does not calculate the days of delay, an on-time / early / late classification by tolerance or an adherence percentage. To get a KPI by MRP controller or production supervisor at summary level, the list is exported to Excel and formulas are built by hand. The existing overdue orders report looks at open orders; here the goal is to measure the past performance of finished orders.","id":"pp-schedule-adherence","industries":[],"input_columns":[],"kind":"report","language":"en","lastmod":"2026-11-17","logic":"1. Production orders are read from AUFK and AFKO by the plant, order type and basic finish date range on the selection screen; orders with delivery completed (AFPO-ELIKZ) or with delivered (I0012) or TECO (I0045) active in JEST are taken, deleted orders (I0076) are skipped.\n2. Start delay = AFKO-GSTRI − AFKO-GSTRP (days); finish delay = AFPO-LTRMI (last goods receipt date) − AFKO-GLTRP. When an actual date is blank the line is flagged as 'date missing'.\n3. A finish delay within the tolerance days is classified as 'on time', below it as 'early' and above it as 'late'.\n4. Delivery rate = AFPO-WEMNG ÷ AFPO-PSMNG × 100; when it is below the selected threshold the order is flagged as 'under-delivered' even if it finished on time.\n5. In the summary view, the number of orders, the on-time rate and the average delay are calculated for the selected grouping (MRP controller, production supervisor or order type).","module":"PP","object_type":"alv_report","output_columns":[{"calculated":false,"formula":"","label":"Production order","source_field":"AUFNR","source_table":"AFKO"},{"calculated":false,"formula":"","label":"Order type","source_field":"AUART","source_table":"AUFK"},{"calculated":false,"formula":"","label":"Material","source_field":"MATNR","source_table":"AFPO"},{"calculated":false,"formula":"","label":"Description","source_field":"MAKTX","source_table":"MAKT"},{"calculated":false,"formula":"","label":"MRP controller","source_field":"DISPO","source_table":"AFKO"},{"calculated":false,"formula":"","label":"Production supervisor","source_field":"FEVOR","source_table":"AFKO"},{"calculated":false,"formula":"","label":"Planned start","source_field":"GSTRP","source_table":"AFKO"},{"calculated":false,"formula":"","label":"Actual start","source_field":"GSTRI","source_table":"AFKO"},{"calculated":true,"formula":"AFKO-GSTRI − AFKO-GSTRP","label":"Start delay (days)","source_field":null,"source_table":null},{"calculated":false,"formula":"","label":"Planned finish","source_field":"GLTRP","source_table":"AFKO"},{"calculated":false,"formula":"","label":"Last goods receipt","source_field":"LTRMI","source_table":"AFPO"},{"calculated":true,"formula":"AFPO-LTRMI − AFKO-GLTRP","label":"Finish delay (days)","source_field":null,"source_table":null},{"calculated":false,"formula":"","label":"Order quantity","source_field":"PSMNG","source_table":"AFPO"},{"calculated":false,"formula":"","label":"Received quantity","source_field":"WEMNG","source_table":"AFPO"},{"calculated":true,"formula":"AFPO-WEMNG ÷ AFPO-PSMNG × 100","label":"Delivery rate %","source_field":null,"source_table":null},{"calculated":true,"formula":"On time, early or late by tolerance; under-delivered when below the delivery threshold","label":"Adherence class","source_field":null,"source_table":null}],"parameters":[{"example":"1000","kind":"select_option","label":"Plant","name":"S_WERKS","ref_field":"AUFK-WERKS","required":true},{"example":"PP01","kind":"select_option","label":"Order type","name":"S_AUART","ref_field":"AUFK-AUART","required":false},{"example":"001","kind":"select_option","label":"MRP controller","name":"S_DISPO","ref_field":"AFKO-DISPO","required":false},{"example":"101","kind":"select_option","label":"Production supervisor","name":"S_FEVOR","ref_field":"AFKO-FEVOR","required":false},{"example":"01.10.2026 – 31.10.2026","kind":"select_option","label":"Basic finish date range","name":"S_GLTRP","ref_field":"AFKO-GLTRP","required":true},{"example":"1","kind":"parameter","label":"Tolerance (days)","name":"P_TOL","ref_field":"","required":false},{"example":"95","kind":"parameter","label":"Under-delivery threshold (%)","name":"P_DLVPCT","ref_field":"","required":false},{"example":"X","kind":"radio","label":"List per order","name":"P_DETAIL","ref_field":"","required":false},{"example":"","kind":"radio","label":"Summary by MRP controller / supervisor","name":"P_SUMM","ref_field":"","required":false}],"part_of":[],"performance":"Narrow AFKO by the basic finish date range and read the status check from JEST once with the order object numbers. For a monthly KPI the report can run in the background at month end and the summary view can be emailed.","quote_url":"https://nekuhub.com/en/request-a-quote/?report=pp-schedule-adherence","related":["pp-overdue-production-orders","pp-weekly-capacity-load-by-work-center"],"releases":[],"source":"custom","standard_alternatives":[{"note":"Lists planned and actual dates; does not calculate delay days, adherence class or a summary KPI.","tcode":"COOIS"}],"summary":"A custom ALV report that compares the planned and actual start and finish dates of completed production orders and calculates the days of delay and the schedule adherence rate. The result is available per order or as a summary by MRP controller, production supervisor and order type.","tables":[{"access":"read","join_on":"","role":"Planned and actual start/finish dates, MRP controller and production supervisor (driving table)","table":"AFKO","variant":"both"},{"access":"read","join_on":"AUFK-AUFNR = AFKO-AUFNR","role":"Order type, plant and object number","table":"AUFK","variant":"both"},{"access":"read","join_on":"AFPO-AUFNR = AFKO-AUFNR","role":"Material, order and received quantity, last goods receipt date","table":"AFPO","variant":"both"},{"access":"read","join_on":"JEST-OBJNR = AUFK-OBJNR","role":"Delivered, TECO and deletion status","table":"JEST","variant":"both"},{"access":"read","join_on":"MAKT-MATNR = AFPO-MATNR AND MAKT-SPRAS = SY-LANGU","role":"Material description","table":"MAKT","variant":"both"}],"title":"Production Order Schedule Adherence Report (Planned vs Actual Start and Finish)","url":"https://nekuhub.com/en/reports/production-schedule-adherence-report/","vendor_id":"nekudos"}