{"audience":"Project managers, project buyers and site managers.","authorization_objects":[{"note":"Network authorization by plant and order type","object":"C_AFKO_AWK"},{"note":"Requisition display authorization by plant","object":"M_BANF_WRK"},{"note":"Purchase order display authorization by plant","object":"M_BEST_WRK"}],"components":[],"countries":[],"effort_days_max":6,"effort_days_min":4,"effort_size":"M","faq":[{"a":"The order is found through the requisition reference (EKPO-BANFN / BNFPO). Orders created without a requisition reference can be matched with an extra rule through the WBS account assignment (EKKN-PS_PSP_PNR).","q":"What if the requisition was later converted to a different order by hand?"},{"a":"Yes. Even when the component special stock indicator (RESB-SOBKZ) is Q, the requisition, order and issue chain is tracked in the same way.","q":"Does it work in scenarios with project stock (Q stock)?"},{"a":"Yes. RESB, EBAN, EKPO, EKET and EKBE keep the same structure in S/4HANA.","q":"Does this report work on S/4HANA?"}],"features":[{"code":"alv","label":"ALV list (sort, filter, subtotals)","note":""},{"code":"layout","label":"User-specific layout variants","note":""},{"code":"drilldown","label":"Double-click drill-down to the document","note":"The requisition opens ME53N, the order ME23N and the network CN23."},{"code":"excel","label":"Export to Excel","note":""},{"code":"background","label":"Runs as a background job","note":""},{"code":"email","label":"Send the result by email","note":"Late components can be sent weekly to the project buying team."}],"functions":[],"gap":"CN52 shows network components with requirement and withdrawn quantity, ME5A shows requisitions and ME2N shows orders separately. No standard list shows the chain from component to requisition, order and goods receipt on one line together with how late the order is against the requirement date. Project teams keep this tracking in Excel.","id":"ps-project-material-procurement-status","industries":[],"input_columns":[],"kind":"report","language":"en","lastmod":"2026-11-17","logic":"1. Network components are read from RESB by WBS element (PSPEL), network, plant and requirement date (BDTER); deleted components (XLOEK) are skipped. The WBS number is added from PRPS.\n2. The component's purchase requisition is read from EBAN through RESB-BANFN / BNFPO: requested quantity, quantity ordered and release status.\n3. Order items for the requisition are found through EKPO-BANFN / BNFPO; the earliest open delivery date comes from EKET and the received quantity from EKBE (VGABE = 1).\n4. The withdrawn quantity is RESB-ENMNG. Delay = EKET-EINDT − RESB-BDTER (a positive value means the order arrives after the requirement).\n5. Status: no requisition / requisition not released / no order / order open / received, not issued / completed. With \"open only\" selected, completed lines are skipped.","module":"PS","object_type":"alv_report","output_columns":[{"calculated":false,"formula":"","label":"WBS element","source_field":"POSID","source_table":"PRPS"},{"calculated":false,"formula":"","label":"Network","source_field":"AUFNR","source_table":"RESB"},{"calculated":false,"formula":"","label":"Activity","source_field":"VORNR","source_table":"RESB"},{"calculated":false,"formula":"","label":"Material","source_field":"MATNR","source_table":"RESB"},{"calculated":false,"formula":"","label":"Description","source_field":"MAKTX","source_table":"MAKT"},{"calculated":false,"formula":"","label":"Requirement qty","source_field":"BDMNG","source_table":"RESB"},{"calculated":false,"formula":"","label":"Unit","source_field":"MEINS","source_table":"RESB"},{"calculated":false,"formula":"","label":"Requirement date","source_field":"BDTER","source_table":"RESB"},{"calculated":false,"formula":"","label":"Purchase requisition","source_field":"BANFN","source_table":"RESB"},{"calculated":false,"formula":"","label":"Purchase order","source_field":"EBELN","source_table":"EKPO"},{"calculated":false,"formula":"","label":"Delivery date","source_field":"EINDT","source_table":"EKET"},{"calculated":true,"formula":"Σ EKBE-MENGE (VGABE = 1, SHKZG = H negative)","label":"Received qty","source_field":null,"source_table":null},{"calculated":false,"formula":"","label":"Withdrawn qty","source_field":"ENMNG","source_table":"RESB"},{"calculated":true,"formula":"EKET-EINDT − RESB-BDTER; without an order, key date − RESB-BDTER","label":"Delay (days)","source_field":null,"source_table":null},{"calculated":true,"formula":"No PR / PR not released / no PO / PO open / received, not issued / completed","label":"Status","source_field":null,"source_table":null}],"parameters":[{"example":"P-26-0012-*","kind":"select_option","label":"WBS element","name":"S_POSID","ref_field":"PRPS-POSID","required":false},{"example":"4000123","kind":"select_option","label":"Network","name":"S_AUFNR","ref_field":"RESB-AUFNR","required":false},{"example":"1000","kind":"select_option","label":"Plant","name":"S_WERKS","ref_field":"RESB-WERKS","required":true},{"example":"EQ-3300","kind":"select_option","label":"Material","name":"S_MATNR","ref_field":"RESB-MATNR","required":false},{"example":"01.11.2026 – 31.03.2027","kind":"select_option","label":"Requirement date","name":"S_BDTER","ref_field":"RESB-BDTER","required":false},{"example":"X","kind":"checkbox","label":"Open components only","name":"P_OPEN","ref_field":"","required":false},{"example":"17.11.2026","kind":"parameter","label":"Key date","name":"P_KEYDT","ref_field":"SY-DATUM","required":true}],"part_of":["ps-project-controlling-pack"],"performance":"Always read RESB with a WBS or network list, and fetch EBAN, EKPO, EKET and EKBE for the keys found with FOR ALL ENTRIES. For large projects run the report as a weekly background job and send it to the project buying team.","process":"P2P","quote_url":"https://nekuhub.com/en/request-a-quote/?report=ps-project-material-procurement-status","related":["mm-open-po-by-vendor","mm-open-purchase-requisitions-aging","ps-wbs-budget-actual-commitment"],"releases":[],"source":"custom","standard_alternatives":[{"note":"Lists network components with requirement and withdrawn quantity; does not give the requisition, order and delay chain on the same line.","tcode":"CN52"},{"note":"Lists requisitions; does not combine them with the component requirement date and order status.","tcode":"ME5A"}],"summary":"A custom ALV report that tracks network material components on one line through purchase requisition, purchase order, goods receipt and goods issue. It shows which project material has no requisition yet, whose order will be late, or which has arrived but has not been issued to the site.","tables":[{"access":"read","join_on":"","role":"Network material component: requirement quantity, date, withdrawn quantity and requisition reference (driving table)","table":"RESB","variant":"both"},{"access":"read","join_on":"PRPS-PSPNR = RESB-PSPEL","role":"WBS element","table":"PRPS","variant":"both"},{"access":"read","join_on":"MAKT-MATNR = RESB-MATNR AND MAKT-SPRAS = SY-LANGU","role":"Material description","table":"MAKT","variant":"both"},{"access":"read","join_on":"EBAN-BANFN = RESB-BANFN AND EBAN-BNFPO = RESB-BNFPO","role":"Purchase requisition: quantity, quantity ordered and release indicator","table":"EBAN","variant":"both"},{"access":"read","join_on":"EKPO-BANFN = EBAN-BANFN AND EKPO-BNFPO = EBAN-BNFPO","role":"Purchase order item created from the requisition","table":"EKPO","variant":"both"},{"access":"read","join_on":"EKET-EBELN = EKPO-EBELN AND EKET-EBELP = EKPO-EBELP","role":"Delivery date and open quantity","table":"EKET","variant":"both"},{"access":"read","join_on":"EKBE-EBELN = EKPO-EBELN AND EKBE-EBELP = EKPO-EBELP","role":"Goods receipt quantity","table":"EKBE","variant":"both"}],"title":"Project Material Procurement Status Report (Component to Goods Receipt)","url":"https://nekuhub.com/en/reports/project-material-procurement-status-report/","vendor_id":"nekudos"}