{"audience":"Project control teams, project accounting, sales operations and finance managers.","authorization_objects":[{"note":"Project display authorization by controlling area","object":"C_PROJ_KOK"},{"note":"Sales order display authorization by sales organization","object":"V_VBAK_VKO"},{"note":"Billing document display authorization by sales organization","object":"V_VBRK_VKO"}],"components":[],"countries":[],"effort_days_max":6,"effort_days_min":4,"effort_size":"M","faq":[{"a":"Both costs and revenues are posted to the project, and revenue is separated by revenue-type cost elements. Because the range depends on the chart of accounts, these elements are given on the selection screen or in a variant; the report totals only those as revenue.","q":"Why are revenue cost elements asked on the selection screen?"},{"a":"With results analysis, the project may carry a revenue value different from billing. In that case the report is extended to show billing revenue and the results analysis value in separate columns, so the reason for the difference stays clear.","q":"What about projects with results analysis (revenue accrual)?"},{"a":"In S/4HANA revenue is written to ACDOCA; COSP can be read as a compatibility view or ACDOCA can be totalled directly by WBS element and account. For orders and billing, the CDS views I_SalesOrderItem and I_BillingDocumentItem can be used.","q":"How is this reconciliation done on S/4HANA?"}],"features":[{"code":"alv","label":"ALV list (sort, filter, subtotals)","note":""},{"code":"layout","label":"User-specific layout variants","note":""},{"code":"drilldown","label":"Double-click drill-down to the document","note":"Double-clicking the order opens VA03; double-clicking the project revenue opens CJI3."},{"code":"excel","label":"Export to Excel","note":""},{"code":"background","label":"Runs as a background job","note":""},{"code":"email","label":"Send the result by email","note":"Rows with differences can be sent to project accounting before month-end close."}],"functions":[],"gap":"CJI3 shows the revenue line items posted to the project but does not compare them with the sales order item value and the billing documents. The VA03 document flow shows the invoices of a single order. The reason for a difference between billed amount and project revenue (billing not passed to accounting, posting to another WBS, direct FI revenue) does not appear together in any standard list. The custom report reconciles the three sources per WBS element.","id":"ps-project-revenue-vs-sales-order-billing","industries":[],"input_columns":[],"kind":"report","language":"en","lastmod":"2026-11-17","logic":"1. PROJ and PRPS are read by project, WBS element and company code; only billing elements (PRPS-FAKKZ = X) are taken.\n2. Sales order items assigned to the WBS element are found via VBAP-PS_PSP_PNR; rejected items (ABGRU filled) are skipped. The customer comes from VBAK and KNA1.\n3. Billing documents are read via VBRP-AUBEL/AUPOS; cancelled documents (VBRK-FKSTO) are skipped and returns and credit memos (VBRK-VBTYP) are totalled with a negative sign. Documents not passed to accounting (VBRK-RFBSK ≠ C) are counted separately.\n4. Project revenue comes from the COSP actuals (WRTTP 04) of the selected revenue cost elements; the sign is reversed because revenue is a credit posting.\n5. Difference = billed − project revenue; remaining = order value − billed. If the billing WBS (VBRP-PS_PSP_PNR) differs from the order WBS, a \"billed to another WBS\" flag is set. The check result column states the likely reason for the difference.","module":"PS","object_type":"alv_report","output_columns":[{"calculated":false,"formula":"","label":"WBS element","source_field":"POSID","source_table":"PRPS"},{"calculated":false,"formula":"","label":"Description","source_field":"POST1","source_table":"PRPS"},{"calculated":false,"formula":"","label":"Sales order","source_field":"VBELN","source_table":"VBAP"},{"calculated":false,"formula":"","label":"Item","source_field":"POSNR","source_table":"VBAP"},{"calculated":false,"formula":"","label":"Customer","source_field":"KUNNR","source_table":"VBAK"},{"calculated":false,"formula":"","label":"Customer name","source_field":"NAME1","source_table":"KNA1"},{"calculated":false,"formula":"","label":"Order value","source_field":"NETWR","source_table":"VBAP"},{"calculated":true,"formula":"Σ VBRP-NETWR (not cancelled; returns and credit memos negative)","label":"Billed","source_field":null,"source_table":null},{"calculated":true,"formula":"−Σ COSP actual (WRTTP 04), revenue cost elements","label":"Project revenue","source_field":null,"source_table":null},{"calculated":true,"formula":"Billed − project revenue","label":"Difference","source_field":null,"source_table":null},{"calculated":true,"formula":"VBAP-NETWR − billed","label":"Remaining unbilled","source_field":null,"source_table":null},{"calculated":false,"formula":"","label":"Currency","source_field":"WAERK","source_table":"VBAP"},{"calculated":true,"formula":"Number of invoices with VBRK-RFBSK ≠ C","label":"Invoices not posted","source_field":null,"source_table":null},{"calculated":true,"formula":"Matched, invoice not posted, billed to another WBS or direct FI revenue","label":"Check result","source_field":null,"source_table":null}],"parameters":[{"example":"P-26015","kind":"select_option","label":"Project","name":"S_PSPID","ref_field":"PROJ-PSPID","required":true},{"example":"P-26015*","kind":"select_option","label":"WBS element","name":"S_POSID","ref_field":"PRPS-POSID","required":false},{"example":"1000","kind":"select_option","label":"Company code","name":"S_PBUKR","ref_field":"PRPS-PBUKR","required":true},{"example":"1000","kind":"select_option","label":"Sales organization","name":"S_VKORG","ref_field":"VBAK-VKORG","required":false},{"example":"200150","kind":"select_option","label":"Customer","name":"S_KUNNR","ref_field":"VBAK-KUNNR","required":false},{"example":"800000–809999","kind":"select_option","label":"Revenue cost elements","name":"S_KSTAR","ref_field":"COSP-KSTAR","required":true},{"example":"2026","kind":"select_option","label":"Fiscal year","name":"S_GJAHR","ref_field":"COSP-GJAHR","required":false},{"example":"X","kind":"checkbox","label":"Differences only","name":"P_DIFF","ref_field":"","required":false}],"part_of":["ps-project-closing-pack"],"performance":"Narrow the PRPS selection by project and FAKKZ. If there is no secondary index for reading VBAP via PS_PSP_PNR, read orders with a VBAK/VBAP JOIN and a sales organization filter. Restrict COSP by the revenue cost element range and fiscal year.","process":"O2C","quote_url":"https://nekuhub.com/en/request-a-quote/?report=ps-project-revenue-vs-sales-order-billing","related":["ps-billing-milestones-not-invoiced","sd-billing-not-posted-to-accounting","sd-sales-order-gross-margin"],"releases":[],"source":"custom","standard_alternatives":[{"note":"Shows revenue line items posted to the project; no comparison with order value and invoices.","tcode":"CJI3"},{"note":"The document flow shows the invoices of one order; no multi-project reconciliation or project revenue.","tcode":"VA03"}],"summary":"A custom ALV report that shows, on one row per billing WBS element, the differences between the sales order value, the amount invoiced and the revenue posted to the project. Project control and accounting teams catch billing documents not passed to accounting, revenue that went to another WBS element and the remaining unbilled amount before month end.","tables":[{"access":"read","join_on":"","role":"Billing WBS elements (driving table)","table":"PRPS","variant":"both"},{"access":"read","join_on":"PROJ-PSPNR = PRPS-PSPHI","role":"Project definition","table":"PROJ","variant":"both"},{"access":"read","join_on":"VBAP-PS_PSP_PNR = PRPS-PSPNR","role":"Sales order item assigned to the WBS element and its net value","table":"VBAP","variant":"both"},{"access":"read","join_on":"VBAK-VBELN = VBAP-VBELN","role":"Order header: customer and sales organization","table":"VBAK","variant":"both"},{"access":"read","join_on":"VBRP-AUBEL = VBAP-VBELN AND VBRP-AUPOS = VBAP-POSNR","role":"Billing items created for the order item","table":"VBRP","variant":"both"},{"access":"read","join_on":"VBRK-VBELN = VBRP-VBELN","role":"Billing header: cancellation, document category and accounting transfer status","table":"VBRK","variant":"both"},{"access":"read","join_on":"COSP-OBJNR = PRPS-OBJNR","role":"Actual revenue posted to the project (revenue cost elements, WRTTP 04)","table":"COSP","variant":"both"},{"access":"read","join_on":"KNA1-KUNNR = VBAK-KUNNR","role":"Customer name","table":"KNA1","variant":"both"},{"access":"read","join_on":"SalesOrder = VBAP-VBELN AND SalesOrderItem = VBAP-POSNR","role":"CDS view that can replace VBAP in S/4HANA","table":"I_SalesOrderItem","variant":"s4"},{"access":"read","join_on":"BillingDocument = VBRP-VBELN","role":"Can replace VBRP in S/4HANA","table":"I_BillingDocumentItem","variant":"s4"}],"title":"Project Revenue vs Sales Order Billing Reconciliation Report","url":"https://nekuhub.com/en/reports/project-revenue-sales-order-billing-reconciliation-report/","vendor_id":"nekudos"}