{"audience":"Project managers, project scheduling and PMO teams.","authorization_objects":[{"note":"Project display authorization by controlling area","object":"C_PROJ_KOK"},{"note":"WBS element authorization by responsible person","object":"C_PRPS_VNR"}],"components":[],"countries":[],"effort_days_max":4,"effort_days_min":3,"effort_size":"S","faq":[{"a":"Yes. If activity level is needed, the same slip calculation is applied to the planned and actual dates in AFVV; this extends the effort range.","q":"Can network activity dates be included as well?"},{"a":"The base version uses the WBS basic dates as the reference. If a frozen baseline exists as a project version (CN72), the comparison can be extended to use the version data.","q":"Can it compare against a project version (baseline)?"},{"a":"Yes. PRPS, PRTE and MLST are used in classic Project System on S/4HANA as well. On systems using enterprise projects, the scope is assessed separately.","q":"Does this report work on S/4HANA?"}],"features":[{"code":"alv","label":"ALV list (sort, filter, subtotals)","note":""},{"code":"layout","label":"User-specific layout variants","note":""},{"code":"drilldown","label":"Double-click drill-down to the document","note":"Double-clicking the WBS element opens CJ20N."},{"code":"excel","label":"Export to Excel","note":""},{"code":"background","label":"Runs as a background job","note":""},{"code":"email","label":"Send the result by email","note":"Red lines can be sent weekly to the responsible persons."}],"functions":[],"gap":"CN41N and CN43N show dates per object but do not calculate the slip in days between the basic finish and the forecast or actual finish, and cannot filter by slip. CN53N lists milestones separately and does not combine them with the WBS line. PMO teams calculate the slippage table in Excel every week.","id":"ps-wbs-schedule-slippage","industries":[],"input_columns":[],"kind":"report","language":"en","lastmod":"2026-11-17","logic":"1. PROJ and PRPS are read by project, WBS, responsible person and maximum level.\n2. Dates are taken from PRTE: basic start / finish (PSTRT, PENDE), forecast start / finish (PSTRM, PETRM), actual start / finish (ISTRT, IENDE).\n3. Start slip = (actual start, else forecast start) − basic start. Finish slip = (actual finish, else forecast finish) − basic finish. If neither exists and the basic finish has passed, slip = key date − basic finish.\n4. Milestones assigned to the WBS element are read from MLST; those with a planned date (TEDAT) before the key date and an empty actual date (LST_ACTDT) count as overdue.\n5. The minimum slip filter is applied; the status light is set from the finish slip and the number of overdue milestones.","module":"PS","object_type":"alv_report","output_columns":[{"calculated":false,"formula":"","label":"Project","source_field":"PSPID","source_table":"PROJ"},{"calculated":false,"formula":"","label":"WBS element","source_field":"POSID","source_table":"PRPS"},{"calculated":false,"formula":"","label":"Description","source_field":"POST1","source_table":"PRPS"},{"calculated":false,"formula":"","label":"Responsible","source_field":"VERNA","source_table":"PRPS"},{"calculated":false,"formula":"","label":"Basic start","source_field":"PSTRT","source_table":"PRTE"},{"calculated":false,"formula":"","label":"Basic finish","source_field":"PENDE","source_table":"PRTE"},{"calculated":false,"formula":"","label":"Forecast start","source_field":"PSTRM","source_table":"PRTE"},{"calculated":false,"formula":"","label":"Forecast finish","source_field":"PETRM","source_table":"PRTE"},{"calculated":false,"formula":"","label":"Actual start","source_field":"ISTRT","source_table":"PRTE"},{"calculated":false,"formula":"","label":"Actual finish","source_field":"IENDE","source_table":"PRTE"},{"calculated":true,"formula":"(ISTRT, else PSTRM) − PSTRT","label":"Start slip (days)","source_field":null,"source_table":null},{"calculated":true,"formula":"(IENDE, else PETRM) − PENDE; if neither exists and PENDE has passed, key date − PENDE","label":"Finish slip (days)","source_field":null,"source_table":null},{"calculated":true,"formula":"Number of milestones with MLST-TEDAT \u003c key date and empty MLST-LST_ACTDT","label":"Overdue milestones","source_field":null,"source_table":null},{"calculated":true,"formula":"Green: slip ≤ 0; yellow: slip ≤ threshold; red: slip \u003e threshold or overdue milestones exist","label":"Status","source_field":null,"source_table":null}],"parameters":[{"example":"P-26-0012","kind":"select_option","label":"Project definition","name":"S_PSPID","ref_field":"PROJ-PSPID","required":true},{"example":"P-26-0012-*","kind":"select_option","label":"WBS element","name":"S_POSID","ref_field":"PRPS-POSID","required":false},{"example":"12","kind":"select_option","label":"Responsible person","name":"S_VERNR","ref_field":"PRPS-VERNR","required":false},{"example":"01.10.2026 – 31.12.2026","kind":"select_option","label":"Basic finish date","name":"S_PENDE","ref_field":"PRTE-PENDE","required":false},{"example":"3","kind":"parameter","label":"Maximum level","name":"P_LEVEL","ref_field":"PRPS-STUFE","required":false},{"example":"5","kind":"parameter","label":"Minimum slip (days)","name":"P_MINSL","ref_field":"","required":false},{"example":"X","kind":"checkbox","label":"Check milestones","name":"P_MLST","ref_field":"","required":false},{"example":"17.11.2026","kind":"parameter","label":"Key date","name":"P_KEYDT","ref_field":"SY-DATUM","required":true}],"part_of":["ps-project-controlling-pack"],"performance":"PRTE and MLST are small tables proportional to the number of WBS elements, so the report runs fast online. For forecast dates to be meaningful, the project team must update them regularly; otherwise the report shows the delay from the basic date to today.","quote_url":"https://nekuhub.com/en/request-a-quote/?report=ps-wbs-schedule-slippage","related":["ps-billing-milestones-not-invoiced","ps-wbs-budget-actual-commitment"],"releases":[],"source":"custom","standard_alternatives":[{"note":"Shows the project structure with dates; does not calculate the slip in days or filter by slip.","tcode":"CN41N"},{"note":"Lists milestones; does not show them on the same line as the WBS date slip.","tcode":"CN53N"}],"summary":"A custom ALV report that compares the basic start and finish dates of each WBS element with the forecast and actual dates, calculates the slip in days and counts milestones that are past due but not reached. It gives one list for the weekly project meeting.","tables":[{"access":"read","join_on":"","role":"Project definition","table":"PROJ","variant":"both"},{"access":"read","join_on":"PRPS-PSPHI = PROJ-PSPNR","role":"WBS element: description, level and responsible person (driving table)","table":"PRPS","variant":"both"},{"access":"read","join_on":"PRTE-POSNR = PRPS-PSPNR","role":"WBS dates: basic, forecast and actual","table":"PRTE","variant":"both"},{"access":"read","join_on":"MLST-PSPNR = PRPS-PSPNR","role":"Milestones: planned and actual date","table":"MLST","variant":"both"}],"title":"Project WBS Schedule Slippage Report (Basic, Forecast and Actual Dates)","url":"https://nekuhub.com/en/reports/project-wbs-schedule-slippage-report/","vendor_id":"nekudos"}