{"audience":"Purchasing managers, accounts payable, process owners and internal audit.","authorization_objects":[{"note":"Requisition display authorization by plant","object":"M_BANF_WRK"},{"note":"Order display authorization by plant","object":"M_BEST_WRK"},{"note":"Accounting document display authorization by company code","object":"F_BKPF_BUK"}],"components":[],"countries":[],"effort_days_max":7,"effort_days_min":5,"effort_size":"M","faq":[{"a":"By default the first invoice and its payment are shown. The last invoice date can be chosen on the selection screen; for partly invoiced orders both dates can be added to the ALV as extra columns.","q":"Which date is used when an order is invoiced several times?"},{"a":"No, the report starts from requisition items. If the share of orders without a requisition matters for process compliance, an extra option can show orders with an empty EKPO-BANFN in a separate list.","q":"Do orders created without a requisition appear?"},{"a":"In S/4HANA, BSAK is a compatibility view and keeps working; for a clean core approach the clearing can be taken from ACDOCA or released CDS views. I_PurchaseRequisitionItemAPI01 and I_SupplierInvoiceAPI01 can be used for requisitions and invoices.","q":"Where is payment data read from in S/4HANA?"}],"features":[{"code":"alv","label":"ALV list (sort, filter, subtotals)","note":""},{"code":"layout","label":"User-specific layout variants","note":""},{"code":"drilldown","label":"Double-click drill-down to the document","note":"The requisition opens ME53N, the order ME23N, the invoice MIR4 and the payment document FB03."},{"code":"excel","label":"Export to Excel","note":""},{"code":"background","label":"Runs as a background job","note":""},{"code":"email","label":"Send the result by email","note":"A monthly cycle time summary can be sent to purchasing and accounting managers."}],"functions":[],"gap":"ME5A shows the requisition and the linked order number, and ME80FN shows the goods receipts and invoices in the order history; but no standard list puts requisition, order, goods receipt, invoice and payment dates on the same row and calculates the time between the steps. Payment information requires a separate trip to FBL1N. The custom report builds the chain in one run and flags the step that is still open.","id":"mm-pr-to-payment-document-flow","industries":[],"input_columns":[],"kind":"report","language":"en","lastmod":"2026-11-17","logic":"1. EBAN is read by plant, purchasing group, document type and requisition date; deleted items (LOEKZ) are skipped.\n2. Order items linked to the requisition are found via EKPO-BANFN/BNFPO; the order date and vendor come from EKKO. If a requisition is split over several orders, each order item becomes its own row.\n3. The first goods receipt (VGABE = 1) and first invoice (VGABE = 2) dates are taken from EKBE; reversals (SHKZG) are taken into account.\n4. The invoice document is read from RBKP; the FI document is found via BKPF-AWKEY = RBKP-BELNR + RBKP-GJAHR. The clearing date and document of the vendor line come from BSAK (payment date).\n5. Durations: requisition release → order, order → goods receipt, goods receipt → invoice, invoice → payment and total. The first step not yet reached is shown as the \"open step\".","module":"MM","object_type":"alv_report","output_columns":[{"calculated":false,"formula":"","label":"Requisition","source_field":"BANFN","source_table":"EBAN"},{"calculated":false,"formula":"","label":"Req. item","source_field":"BNFPO","source_table":"EBAN"},{"calculated":false,"formula":"","label":"Release date","source_field":"FRGDT","source_table":"EBAN"},{"calculated":false,"formula":"","label":"Purchase order","source_field":"EBELN","source_table":"EKPO"},{"calculated":false,"formula":"","label":"Order date","source_field":"BEDAT","source_table":"EKKO"},{"calculated":false,"formula":"","label":"Vendor name","source_field":"NAME1","source_table":"LFA1"},{"calculated":true,"formula":"Earliest EKBE-BUDAT (VGABE = 1)","label":"First goods receipt","source_field":null,"source_table":null},{"calculated":false,"formula":"","label":"Invoice document","source_field":"BELNR","source_table":"RBKP"},{"calculated":false,"formula":"","label":"Invoice posting date","source_field":"BUDAT","source_table":"RBKP"},{"calculated":false,"formula":"","label":"Payment date","source_field":"AUGDT","source_table":"BSAK"},{"calculated":true,"formula":"EKKO-BEDAT − EBAN-FRGDT","label":"Req. → order (days)","source_field":null,"source_table":null},{"calculated":true,"formula":"First goods receipt − EKKO-BEDAT","label":"Order → GR (days)","source_field":null,"source_table":null},{"calculated":true,"formula":"RBKP-BUDAT − first goods receipt","label":"GR → invoice (days)","source_field":null,"source_table":null},{"calculated":true,"formula":"BSAK-AUGDT − RBKP-BUDAT","label":"Invoice → payment (days)","source_field":null,"source_table":null},{"calculated":true,"formula":"Date of the last step reached − EBAN-FRGDT","label":"Total cycle (days)","source_field":null,"source_table":null},{"calculated":true,"formula":"First step not yet reached: order, goods receipt, invoice, payment or completed","label":"Open step","source_field":null,"source_table":null}],"parameters":[{"example":"1000","kind":"select_option","label":"Plant","name":"S_WERKS","ref_field":"EBAN-WERKS","required":true},{"example":"001","kind":"select_option","label":"Purchasing group","name":"S_EKGRP","ref_field":"EBAN-EKGRP","required":false},{"example":"NB","kind":"select_option","label":"Requisition type","name":"S_BSART","ref_field":"EBAN-BSART","required":false},{"example":"01.07.2026 – 31.10.2026","kind":"select_option","label":"Requisition date range","name":"S_BADAT","ref_field":"EBAN-BADAT","required":true},{"example":"BAKIM","kind":"select_option","label":"Requisitioner","name":"S_AFNAM","ref_field":"EBAN-AFNAM","required":false},{"example":"100245","kind":"select_option","label":"Vendor","name":"S_LIFNR","ref_field":"EKKO-LIFNR","required":false},{"example":"X","kind":"checkbox","label":"Only chains not yet paid","name":"P_OPEN","ref_field":"","required":false}],"part_of":["p2p-purchasing-cycle-time-pack"],"performance":"Always restrict the EBAN selection by requisition date and plant. Read EKBE in one pass for the selected order items. For BKPF access via AWKEY, supply AWTYP = RMRP together with AWKEY; on large systems a nightly background job is recommended.","process":"P2P","quote_url":"https://nekuhub.com/en/request-a-quote/?report=mm-pr-to-payment-document-flow","related":["fi-vendor-open-items-aging","mm-goods-received-not-invoiced","mm-open-purchase-requisitions-aging","mm-po-release-pending-aging"],"releases":[],"source":"custom","standard_alternatives":[{"note":"Lists requisitions with the linked order number; no goods receipt, invoice or payment dates.","tcode":"ME5A"},{"note":"Shows the order history but does not start from the requisition and gives no payment data or step durations.","tcode":"ME80FN"}],"summary":"A custom ALV report that follows each purchase requisition item through the purchase order, goods receipt, invoice and payment on a single row and calculates the days between the steps. Purchasing and accounting teams see where the process gets stuck and how long requisition-to-payment takes on average.","tables":[{"access":"read","join_on":"","role":"Purchase requisition item: requisition and release date (driving table)","table":"EBAN","variant":"both"},{"access":"read","join_on":"EKPO-BANFN = EBAN-BANFN AND EKPO-BNFPO = EBAN-BNFPO","role":"Order item created from the requisition","table":"EKPO","variant":"both"},{"access":"read","join_on":"EKKO-EBELN = EKPO-EBELN","role":"Order date, vendor and company code","table":"EKKO","variant":"both"},{"access":"read","join_on":"EKBE-EBELN = EKPO-EBELN AND EKBE-EBELP = EKPO-EBELP","role":"Order history: goods receipt and invoice dates","table":"EKBE","variant":"both"},{"access":"read","join_on":"RBKP-BELNR = EKBE-BELNR AND RBKP-GJAHR = EKBE-GJAHR","role":"Logistics invoice header: posting date and payment block","table":"RBKP","variant":"both"},{"access":"read","join_on":"BKPF-AWKEY = RBKP-BELNR + RBKP-GJAHR","role":"FI document of the invoice","table":"BKPF","variant":"both"},{"access":"read","join_on":"BSAK-BUKRS = BKPF-BUKRS AND BSAK-BELNR = BKPF-BELNR AND BSAK-GJAHR = BKPF-GJAHR","role":"Cleared vendor item: payment date and payment document","table":"BSAK","variant":"both"},{"access":"read","join_on":"LFA1-LIFNR = EKKO-LIFNR","role":"Vendor name","table":"LFA1","variant":"both"},{"access":"read","join_on":"PurchaseRequisition = EBAN-BANFN","role":"Released CDS view that can replace EBAN in S/4HANA","table":"I_PurchaseRequisitionItemAPI01","variant":"s4"},{"access":"read","join_on":"SupplierInvoice = RBKP-BELNR","role":"Can replace RBKP in S/4HANA","table":"I_SupplierInvoiceAPI01","variant":"s4"}],"title":"Purchase Requisition to Payment End-to-End Document Flow and Cycle Time Report","url":"https://nekuhub.com/en/reports/purchase-requisition-to-payment-document-flow-report/","vendor_id":"nekudos"}