# R&D Personnel Incentive Declaration and Labor Control Report

> A report that compares the working time R&D and design centre staff booked to R&D projects with the incentive calculation in payroll. Total working time, time booked to R&D projects, share of work outside the centre and the wage types benefiting from the incentive are shown side by side per employee; inconsistencies are flagged and the employee list for the periodic declaration is prepared.

- Type: Report, Custom development, ALV report
- Module: HCM
- Estimated effort: M (7–10 working days)
- Localization: TR
- Last updated: 2026-11-18
- URL: https://nekuhub.com/en/reports/rd-personnel-incentive-declaration-and-labor-control-report/


## Localization and legal basis: Türkiye

- Legal basis: Article 3 of Law No. 5746 on Supporting Research, Development and Design Activities and its implementing regulation.
- Incentive rates, eligible staff qualifications and limits for work outside the centre are entered in the settings table according to current regulations during installation; declarations are filed through the relevant authorities' systems.

## Why is the standard not enough?

Turkish payroll calculates the R&D income tax withholding and social security incentives according to the status assigned to the employee, and CATS_DA shows the time booked to projects. But no report checks that the incentive calculation is consistent with project labour or monitors the share of work outside the centre. The breakdowns requested in audits are prepared by hand.

### Closest standard alternatives

- CATS_DA: Shows the working times entered; does not compare them with payroll incentives.
- PC00_M99_CWTR: Lists incentive wage types; does not check project labour.

## Tables used

| Table | Role | Access | Join | System |
|---|---|---|---|---|
| CATSDB | Approved working times and receiving project (driving table) | Read | - | ECC + S/4 |
| PRPS | WBS element and R&D project classification | Read | PRPS-PSPNR = CATSDB-RPROJ | ECC + S/4 |
| PA0001 | Org unit and position | Read | PA0001-PERNR = CATSDB-PERNR | ECC + S/4 |
| PA0002 | Name and identity number | Read | PA0002-PERNR = CATSDB-PERNR | ECC + S/4 |
| PA2001 | Leave and sick days | Read | PA2001-PERNR = CATSDB-PERNR | ECC + S/4 |
| HRPY_RGDIR | Payroll result directory | Read | HRPY_RGDIR-PERNR = CATSDB-PERNR | ECC + S/4 |
| PCL2 | Incentive wage types and bases | Read | PCL2-RELID = 'TR' AND PCL2-SRTFD = PERNR + SEQNR | ECC + S/4 |

## BAPIs and functions used

- HR_PERSONAL_WORK_SCHEDULE: Returns planned working days and hours
- PYXX_READ_PAYROLL_RESULT: Reads the incentive wage types

## Selection screen parameters

| Parameter | Description | Type | Reference field | Required |
|---|---|---|---|---|
| S_BUKRS | Company code | Range / multiple | PA0001-BUKRS | Yes |
| P_PERIOD | Period | Single value | - | Yes |
| S_ORGEH | R&D centre org unit | Range / multiple | PA0001-ORGEH | No |
| S_POSID | R&D project (WBS) | Range / multiple | PRPS-POSID | No |
| P_VIEW | View: control / declaration list | Radio button | - | No |

## Output columns

| Column | Source |
|---|---|
| Personnel no. | PA0001-PERNR |
| First name | PA0002-VORNA |
| Last name | PA0002-NACHN |
| Planned time (h) | Calculated: Personal work schedule − leave |
| Booked to R&D projects (h) | Calculated: Sum of CATSDB-CATSHOURS on R&D-flagged WBS |
| R&D share | Calculated: R&D time / planned time |
| Outside-centre share | Calculated: Outside-centre time / total R&D time |
| Incentive base | Calculated: Incentive base wage type in payroll |
| Check | Calculated: OK, low R&D share, no time booked or outside-centre limit exceeded |

## How does the report work?

1. Employees with R&D status are selected through PA0001 (org unit, employee subgroup) and the infotype or subtype the company uses for incentive status.
2. Working times are read from CATSDB as approved records (STATUS 30); the receiving WBS element (RPROJ) is classified as an R&D project from PRPS (by a project number range or the user field PRPS-USR00 defined during installation). Work outside the centre is separated by the activity type or attendance type defined during installation.
3. Planned working time comes from the personal work schedule; leave and sick days from PA2001 are deducted.
4. Incentive wage types (income tax exemption, employer social security support) and bases are read from the payroll result (PYXX_READ_PAYROLL_RESULT).
5. Checks: a row is flagged if the R&D time share is below the limit in the settings table, if an employee receives the incentive but booked no time to R&D projects, or if the limit for work outside the centre is exceeded.
6. The declaration view gives the period list with identity number, name, title, R&D days and incentive base.

## Authorization objects

- P_ORGIN: Authorization to read employee data by personnel area, employee group and infotype
- P_PCLX: Authorization to read the payroll result cluster (RELID RU/TR)

## Frequently asked questions

### Does it work without CATS?

Project time needs a source in SAP. If network confirmations (AFRU) or another timesheet system are used instead of CATS, the source is changed during installation; the check logic stays the same.

### Does the report calculate the incentive amount?

No. The incentive is calculated in payroll; the report checks that this calculation is consistent with project labour and prepares the declaration list.

### Does it work on S/4HANA?

Yes. CATSDB, PRPS and the payroll cluster keep the same structure on S/4HANA; project costs can also be compared from ACDOCA.

---
Let us build this report for your system: https://nekuhub.com/en/request-a-quote/?report=hcm-tr-rd-personnel-incentive
