{"audience":"Industrial engineering and work study teams, cost accounting (product costing), internal audit and PP master data owners.","authorization_objects":[{"note":"Authorization to display routings","object":"C_ROUT"},{"note":"Display of routings assigned to materials","object":"C_ROUT_MAT"}],"components":[],"countries":[],"effort_days_max":6,"effort_days_min":4,"effort_size":"M","faq":[{"a":"Without a change number, SAP overwrites the PLPO record and does not keep the old value; only the last user and date remain. If a full before/after trail is needed, making engineering change management (change numbers) mandatory for routing changes is recommended.","q":"Why is the old value not shown for routings changed without a change number?"},{"a":"Yes. Operations deleted with a change number are shown as 'deleted', newly added ones as 'new operation', with the old or new value left blank.","q":"Are deleted or newly added operations listed?"},{"a":"Yes. PLKO, PLPO, PLAS and MAPL keep the same structure in S/4HANA. For a clean core approach, released CDS views such as I_MfgBillOfOperationsChgSt and I_MfgBOOOperationChangeState can be used.","q":"Does the report work on S/4HANA?"}],"features":[{"code":"alv","label":"ALV list (sort, filter, subtotals)","note":""},{"code":"layout","label":"User-specific layout variants","note":""},{"code":"drilldown","label":"Double-click drill-down to the document","note":"The routing group opens CA03 on the change date; the change number opens the change master record."},{"code":"excel","label":"Export to Excel","note":""},{"code":"background","label":"Runs as a background job","note":""},{"code":"email","label":"Send the result by email","note":""}],"functions":[],"gap":"CA03 shows one routing on a key date; to see the old state of a change made with a change number the routing must be opened again with another date. CA80 gives the work center where-used and CA85 the mass replace; but no standard list answers 'in which routings did who change which standard value, and by what percentage, last month' across several routings. When differences appear after a cost estimate, the root cause analysis is done by hand. The custom report lists the changes compared with the previous record.","id":"pp-routing-standard-value-change-audit","industries":[],"input_columns":[],"kind":"report","language":"en","lastmod":"2026-11-17","logic":"1. Routing operations (PLNTY 'N' and 'R') of the selected plant (WERKS) are read from PLPO where the change date AEDAT or creation date ANDAT is in the selected range; AENAM and AENNR filter the selection.\n2. For changes made with a change number, the PLPO record with an older DATUV for the same PLNNR and PLNKN is taken as the previous value; VGW01, VGW02 and VGW03 are compared together with the units (VGE01–VGE03) and the base quantity (BMSCH).\n3. For changes made without a change number the previous value is not kept in the system, so the line shows only the last value, the user and the date, with the note 'No previous value'.\n4. Through PLAS the routing counter (PLNAL) the operation belongs to is found, PLKO gives the routing usage and status, and MAPL the assigned material.\n5. The work center is read from CRHD-ARBPL; each changed standard value becomes a separate line and the change percentage is calculated as (new − old) ÷ old × 100.\n6. When a percentage threshold is entered, lines whose absolute change is below it are hidden.","module":"PP","object_type":"alv_report","output_columns":[{"calculated":false,"formula":"","label":"Material","source_field":"MATNR","source_table":"MAPL"},{"calculated":false,"formula":"","label":"Material description","source_field":"MAKTX","source_table":"MAKT"},{"calculated":false,"formula":"","label":"Routing group","source_field":"PLNNR","source_table":"PLKO"},{"calculated":false,"formula":"","label":"Counter","source_field":"PLNAL","source_table":"PLKO"},{"calculated":false,"formula":"","label":"Operation","source_field":"VORNR","source_table":"PLPO"},{"calculated":false,"formula":"","label":"Work center","source_field":"ARBPL","source_table":"CRHD"},{"calculated":false,"formula":"","label":"Valid from","source_field":"DATUV","source_table":"PLPO"},{"calculated":false,"formula":"","label":"Change number","source_field":"AENNR","source_table":"PLPO"},{"calculated":false,"formula":"","label":"Changed by","source_field":"AENAM","source_table":"PLPO"},{"calculated":false,"formula":"","label":"Changed on","source_field":"AEDAT","source_table":"PLPO"},{"calculated":true,"formula":"Changed field: Setup (VGW01), Machine (VGW02) or Labor (VGW03)","label":"Standard value","source_field":null,"source_table":null},{"calculated":true,"formula":"Value in the PLPO record with the previous DATUV for the same PLNKN; blank if none","label":"Old value","source_field":null,"source_table":null},{"calculated":true,"formula":"VGW01/VGW02/VGW03 of the current PLPO record with its unit","label":"New value","source_field":null,"source_table":null},{"calculated":true,"formula":"(New − Old) ÷ Old × 100","label":"Change (%)","source_field":null,"source_table":null},{"calculated":false,"formula":"","label":"Base quantity","source_field":"BMSCH","source_table":"PLPO"}],"parameters":[{"example":"1000","kind":"select_option","label":"Plant","name":"S_WERKS","ref_field":"PLPO-WERKS","required":true},{"example":"50000120","kind":"select_option","label":"Routing group","name":"S_PLNNR","ref_field":"PLKO-PLNNR","required":false},{"example":"FG-*","kind":"select_option","label":"Material","name":"S_MATNR","ref_field":"MAPL-MATNR","required":false},{"example":"01.10.2026 – 31.10.2026","kind":"select_option","label":"Changed on","name":"S_AEDAT","ref_field":"PLPO-AEDAT","required":true},{"example":"","kind":"select_option","label":"Changed by","name":"S_AENAM","ref_field":"PLPO-AENAM","required":false},{"example":"500000000412","kind":"select_option","label":"Change number","name":"S_AENNR","ref_field":"PLPO-AENNR","required":false},{"example":"10","kind":"parameter","label":"Minimum change (%)","name":"P_PCT","ref_field":"","required":false}],"part_of":["pp-production-master-data-pack"],"performance":"Read PLPO by PLNTY, WERKS and AEDAT; in large plants limit the date range to one or two months. Fetch the previous records with one FOR ALL ENTRIES read on the list of changed PLNNR. For the monthly audit, run the report in the background and email it to the costing team.","quote_url":"https://nekuhub.com/en/request-a-quote/?report=pp-routing-standard-value-change-audit","related":["pp-routing-mass-upload","pp-schedule-adherence"],"releases":[],"source":"custom","standard_alternatives":[{"note":"Shows one routing on a key date; does not list changes across several routings with before/after values.","tcode":"CA03"},{"note":"Replaces work centers in mass; does not give an audit list of the changes made.","tcode":"CA85"}],"summary":"A custom ALV report that lists operations changed in routings within a date range, with the old and new setup, machine and labor standard values, the change percentage, the user who changed them and the change number. Time changes that directly affect product costs and capacity planning are audited in one list.","tables":[{"access":"read","join_on":"","role":"Routing operations: standard values, change data (driving table)","table":"PLPO","variant":"both"},{"access":"read","join_on":"PLAS-PLNTY = PLPO-PLNTY AND PLAS-PLNNR = PLPO-PLNNR AND PLAS-PLNKN = PLPO-PLNKN","role":"Assignment of the operation to the routing counter","table":"PLAS","variant":"both"},{"access":"read","join_on":"PLKO-PLNTY = PLAS-PLNTY AND PLKO-PLNNR = PLAS-PLNNR AND PLKO-PLNAL = PLAS-PLNAL","role":"Routing header: usage, status","table":"PLKO","variant":"both"},{"access":"read","join_on":"MAPL-PLNTY = PLKO-PLNTY AND MAPL-PLNNR = PLKO-PLNNR AND MAPL-PLNAL = PLKO-PLNAL","role":"Material assigned to the routing","table":"MAPL","variant":"both"},{"access":"read","join_on":"CRHD-OBJTY = 'A' AND CRHD-OBJID = PLPO-ARBID","role":"Work center of the operation","table":"CRHD","variant":"both"},{"access":"read","join_on":"MAKT-MATNR = MAPL-MATNR AND MAKT-SPRAS = SY-LANGU","role":"Material description","table":"MAKT","variant":"both"}],"title":"Routing Standard Value Change Audit Report","url":"https://nekuhub.com/en/reports/routing-standard-value-change-history-report/","vendor_id":"nekudos"}