{"audience":"Subcontracting and purchasing specialists, production planning, inventory control and costing teams.","authorization_objects":[{"note":"Purchase order display authorization by purchasing organization","object":"M_BEST_EKO"},{"note":"Purchase order display authorization by plant","object":"M_BEST_WRK"},{"note":"Goods movement authorization by plant","object":"M_MSEG_WWA"}],"components":[],"countries":[],"effort_days_max":7,"effort_days_min":5,"effort_size":"M","faq":[{"a":"The component consumption may have been increased by hand at the finished goods receipt, the vendor may have reported scrap or the component unit conversion may be wrong. The report shows the difference; the reason is clarified with the vendor and the subcontracting owner.","q":"Why does excess consumption occur?"},{"a":"SAP keeps the special stock at the vendor (MSLB) at vendor, plant and material level, not per order. The report therefore shows the stock at the vendor in the component subtotal and gives the shipped, consumed and remaining reconciliation at that level.","q":"Why is the stock at the vendor not shown per order?"},{"a":"Yes. Subcontracting orders, RESB and the order history keep the same structure in S/4HANA; the MSEG and MSLB reads work through compatibility views.","q":"Does the report work on S/4HANA?"}],"features":[{"code":"alv","label":"ALV list (sort, filter, subtotals)","note":""},{"code":"layout","label":"User-specific layout variants","note":""},{"code":"drilldown","label":"Double-click drill-down to the document","note":"The order number opens ME23N, the actual consumption opens the 543 documents in MB51 and the stock at vendor opens MBLB."},{"code":"excel","label":"Export to Excel","note":""},{"code":"background","label":"Runs as a background job","note":""}],"functions":[],"gap":"ME2O monitors the component stock provided to the vendor and the requirements, and MBLB lists the stock at the vendor, but neither compares the actual component consumption at finished goods receipt with the consumption expected for the finished quantity and shows excess consumption and overdue subcontracting deliveries on the same line. Year-end stock reconciliation with the vendor is therefore done by hand with MB51 and ME2O output.","id":"mm-subcontracting-component-reconciliation","industries":[],"input_columns":[],"kind":"report","language":"en","lastmod":"2026-11-17","logic":"1. EKKO and EKPO are read by vendor, plant and order number; only the subcontracting item category (EKPO-PSTYP = 3) and non-deleted items remain.\n2. Components are read from RESB by order item (RESB-EBELN, RESB-EBELP); deleted components (XLOEK) are excluded. The planned component quantity is RESB-BDMNG.\n3. The received finished quantity is summed net from EKBE (VGABE = 1). Actual consumption is summed from 543 movements in MSEG (544 reversals negative) by order item and component material.\n4. Expected consumption = RESB-BDMNG × received finished qty ÷ EKPO-MENGE; excess consumption = actual − expected. If the difference exceeds the tolerance percentage the line is flagged as excess, if it is below as under-consumption. If EKET-EINDT is before the key date and the finished goods have not fully arrived, the line counts as overdue.\n5. Stock at the vendor is added from MSLB per vendor and component (LBLAB + LBINS); the subtotal at vendor + component level gives the reconciliation of shipped, consumed and remaining quantities.","module":"MM","object_type":"alv_report","output_columns":[{"calculated":false,"formula":"","label":"Vendor","source_field":"LIFNR","source_table":"EKKO"},{"calculated":false,"formula":"","label":"Vendor name","source_field":"NAME1","source_table":"LFA1"},{"calculated":false,"formula":"","label":"Purchase order","source_field":"EBELN","source_table":"EKPO"},{"calculated":false,"formula":"","label":"Item","source_field":"EBELP","source_table":"EKPO"},{"calculated":false,"formula":"","label":"Finished material","source_field":"MATNR","source_table":"EKPO"},{"calculated":false,"formula":"","label":"Component","source_field":"MATNR","source_table":"RESB"},{"calculated":false,"formula":"","label":"Order qty","source_field":"MENGE","source_table":"EKPO"},{"calculated":true,"formula":"Σ EKBE-MENGE (VGABE = 1, reversals negative)","label":"Finished received","source_field":null,"source_table":null},{"calculated":false,"formula":"","label":"Delivery date","source_field":"EINDT","source_table":"EKET"},{"calculated":false,"formula":"","label":"Planned component","source_field":"BDMNG","source_table":"RESB"},{"calculated":true,"formula":"RESB-BDMNG × finished received ÷ EKPO-MENGE","label":"Expected consumption","source_field":null,"source_table":null},{"calculated":true,"formula":"Σ MSEG-MENGE (BWART 543, 544 negative)","label":"Actual consumption","source_field":null,"source_table":null},{"calculated":true,"formula":"Actual − expected consumption","label":"Excess consumption","source_field":null,"source_table":null},{"calculated":false,"formula":"","label":"Unit","source_field":"MEINS","source_table":"RESB"},{"calculated":false,"formula":"","label":"Stock at vendor","source_field":"LBLAB","source_table":"MSLB"},{"calculated":true,"formula":"Matched, excess consumption, under-consumption or delivery overdue","label":"Status","source_field":null,"source_table":null}],"parameters":[{"example":"100733","kind":"select_option","label":"Subcontractor","name":"S_LIFNR","ref_field":"EKKO-LIFNR","required":false},{"example":"1100","kind":"select_option","label":"Plant","name":"S_WERKS","ref_field":"EKPO-WERKS","required":true},{"example":"4500013320","kind":"select_option","label":"Purchase order","name":"S_EBELN","ref_field":"EKPO-EBELN","required":false},{"example":"RM-2040","kind":"select_option","label":"Component material","name":"S_MATNR","ref_field":"RESB-MATNR","required":false},{"example":"01.09.2026 – 30.11.2026","kind":"select_option","label":"Subcontracting delivery date","name":"S_EINDT","ref_field":"EKET-EINDT","required":false},{"example":"2","kind":"parameter","label":"Consumption variance tolerance (%)","name":"P_TOLPCT","ref_field":"","required":false},{"example":"","kind":"checkbox","label":"Only items not fully delivered","name":"P_OPEN","ref_field":"","required":false},{"example":"17.11.2026","kind":"parameter","label":"Key date for overdue check","name":"P_KEYDT","ref_field":"SY-DATUM","required":true}],"part_of":[],"performance":"The number of subcontracting orders is usually limited; read RESB for the order list and MSEG for movement type 543 and the order list. For the yearly reconciliation, running in the background and exporting to Excel is enough.","process":"P2P","quote_url":"https://nekuhub.com/en/request-a-quote/?report=mm-subcontracting-component-reconciliation","related":["mm-open-po-by-vendor","pp-scrap-yield-by-work-center"],"releases":[],"source":"custom","standard_alternatives":[{"note":"Lists stock at the vendor; does not compare expected and actual consumption by order.","tcode":"MBLB"},{"note":"Lists the 543 consumption documents; planned quantity and finished goods receipt are not on the same line.","tcode":"MB51"}],"summary":"A custom ALV report that compares the planned consumption of components sent to the vendor on subcontracting orders with the consumption posted at finished goods receipt (543) and lists it together with the stock left at the vendor. Excess consumption, scrap and overdue subcontracting deliveries show up in one list.","tables":[{"access":"read","join_on":"","role":"Subcontracting order header: vendor (driving table)","table":"EKKO","variant":"both"},{"access":"read","join_on":"EKPO-EBELN = EKKO-EBELN","role":"Subcontracting item: finished material, order quantity, item category","table":"EKPO","variant":"both"},{"access":"read","join_on":"EKET-EBELN = EKPO-EBELN AND EKET-EBELP = EKPO-EBELP","role":"Subcontracting delivery date","table":"EKET","variant":"both"},{"access":"read","join_on":"RESB-EBELN = EKPO-EBELN AND RESB-EBELP = EKPO-EBELP","role":"Subcontracting components: planned component quantity","table":"RESB","variant":"both"},{"access":"read","join_on":"EKBE-EBELN = EKPO-EBELN AND EKBE-EBELP = EKPO-EBELP","role":"Finished goods receipts","table":"EKBE","variant":"both"},{"access":"read","join_on":"MSEG-EBELN = EKPO-EBELN AND MSEG-EBELP = EKPO-EBELP AND MSEG-MATNR = RESB-MATNR","role":"Component consumption movements (543/544)","table":"MSEG","variant":"both"},{"access":"read","join_on":"MSLB-LIFNR = EKKO-LIFNR AND MSLB-MATNR = RESB-MATNR AND MSLB-WERKS = EKPO-WERKS","role":"Special stock at the vendor (SOBKZ = O)","table":"MSLB","variant":"both"},{"access":"read","join_on":"LFA1-LIFNR = EKKO-LIFNR","role":"Vendor name","table":"LFA1","variant":"both"}],"title":"Subcontracting Component Consumption and Stock at Vendor Reconciliation Report","url":"https://nekuhub.com/en/reports/subcontracting-component-consumption-and-stock-at-vendor-reconciliation-report/","vendor_id":"nekudos"}