{"audience":"Project controllers, cost accounting and period-end closing teams.","authorization_objects":[{"note":"Project display authorization by controlling area","object":"C_PROJ_KOK"},{"note":"WBS element authorization by profit center","object":"C_PRPS_PRC"}],"components":[],"countries":[],"effort_days_max":5,"effort_days_min":3,"effort_size":"M","faq":[{"a":"No. The report only lists. Settlement is run with CJ8G or CJ88; the report is used to fix missing rules before that run.","q":"Does the report run settlement itself?"},{"a":"Rules with an AUC or fixed asset receiver are shown as well. The split between full settlement (FUL) and periodic settlement (PER) is visible in the rule lines.","q":"How does it work for capital projects (AUC)?"},{"a":"Yes. In S/4HANA COSP is read from ACDOCA as a compatibility view, and the report keeps using the same fields. JEST, JCDS and COBRB keep the same structure.","q":"Does this report work on S/4HANA?"}],"features":[{"code":"alv","label":"ALV list (sort, filter, subtotals)","note":""},{"code":"layout","label":"User-specific layout variants","note":""},{"code":"drilldown","label":"Double-click drill-down to the document","note":"Double-clicking the WBS element opens CJ20N; clicking the balance opens CJI3."},{"code":"excel","label":"Export to Excel","note":""},{"code":"background","label":"Runs as a background job","note":"Can run in the period-end closing schedule before settlement."}],"functions":[],"gap":"CJ8G and CJ88 run settlement and only give the error log of that run. No standard report lists in advance the technically completed or closed WBS elements whose balance is not zero, whose settlement rule is missing or whose receiver is not suitable. Closing teams do this check by combining status lists and cost reports.","id":"ps-closed-wbs-unsettled-balance","industries":[],"input_columns":[],"kind":"report","language":"en","lastmod":"2026-11-17","logic":"1. PRPS is read by project, WBS and company code. Elements whose active (INACT blank) system status in JEST is TECO (I0045) or CLSD (I0046) remain; the date the status was set comes from JCDS-UDATE and the text from TJ02T.\n2. Balance = sum of WKG001…WKG016 of the actual values (WRTTP = 04) in COSP up to the selected fiscal year and period; settlement postings (BEKNZ = A) are included. Balances below the threshold are skipped.\n3. The settlement rule is read from COBRB: receiver category (KONTY), receiver (KOSTL, ANLN1, HKONT or PS_PSP_PNR) and percentage (PROZS).\n4. Action: \"rule missing\" if there is no rule, otherwise \"settlement not run\".\n5. The currency comes from the controlling area (TKA01); the ALV shows subtotals by company code and project.","module":"PS","object_type":"alv_report","output_columns":[{"calculated":false,"formula":"","label":"Project","source_field":"PSPID","source_table":"PROJ"},{"calculated":false,"formula":"","label":"WBS element","source_field":"POSID","source_table":"PRPS"},{"calculated":false,"formula":"","label":"Description","source_field":"POST1","source_table":"PRPS"},{"calculated":false,"formula":"","label":"Company code","source_field":"PBUKR","source_table":"PRPS"},{"calculated":false,"formula":"","label":"Responsible","source_field":"VERNA","source_table":"PRPS"},{"calculated":false,"formula":"","label":"Status","source_field":"TXT04","source_table":"TJ02T"},{"calculated":false,"formula":"","label":"Status date","source_field":"UDATE","source_table":"JCDS"},{"calculated":true,"formula":"Σ COSP-WKG001…WKG016 (WRTTP = 04, settlement included) up to the selected period","label":"Balance","source_field":null,"source_table":null},{"calculated":false,"formula":"","label":"Currency","source_field":"WAERS","source_table":"TKA01"},{"calculated":false,"formula":"","label":"Receiver category","source_field":"KONTY","source_table":"COBRB"},{"calculated":true,"formula":"COBRB-KOSTL, COBRB-ANLN1, COBRB-HKONT or COBRB-PS_PSP_PNR depending on the receiver category","label":"Receiver","source_field":null,"source_table":null},{"calculated":false,"formula":"","label":"Percentage","source_field":"PROZS","source_table":"COBRB"},{"calculated":true,"formula":"\"Rule missing\" without a rule, otherwise \"settlement not run\"","label":"Action","source_field":null,"source_table":null}],"parameters":[{"example":"1000","kind":"select_option","label":"Company code","name":"S_PBUKR","ref_field":"PRPS-PBUKR","required":true},{"example":"P-25-*","kind":"select_option","label":"Project definition","name":"S_PSPID","ref_field":"PROJ-PSPID","required":false},{"example":"P-25-0031-*","kind":"select_option","label":"WBS element","name":"S_POSID","ref_field":"PRPS-POSID","required":false},{"example":"2026","kind":"parameter","label":"Fiscal year","name":"P_GJAHR","ref_field":"COSP-GJAHR","required":true},{"example":"10","kind":"parameter","label":"Up to period","name":"P_PERIO","ref_field":"","required":true},{"example":"X","kind":"radio","label":"Technically completed (TECO)","name":"R_TECO","ref_field":"","required":false},{"example":"","kind":"radio","label":"Closed (CLSD)","name":"R_CLSD","ref_field":"","required":false},{"example":"1","kind":"parameter","label":"Minimum balance amount","name":"P_MIN","ref_field":"","required":false}],"part_of":["ps-project-closing-pack"],"performance":"Read JEST by status and object number prefix (PR), and take the COSP totals only for the object numbers found with GROUP BY OBJNR. The report should run as a step of the period-end closing schedule, before settlement.","process":"R2R","quote_url":"https://nekuhub.com/en/request-a-quote/?report=ps-closed-wbs-unsettled-balance","related":["ps-wbs-budget-actual-commitment"],"releases":[],"source":"custom","standard_alternatives":[{"note":"Runs collective settlement; does not list closed WBS elements with a balance in advance.","tcode":"CJ8G"},{"note":"Settles one project and gives the log of that run.","tcode":"CJ88"}],"summary":"A custom ALV report that lists technically completed (TECO) or closed WBS elements that still carry a cost balance, with status date, balance, settlement rule and receiver. At period-end closing it shows unsettled projects or projects with a missing rule in advance.","tables":[{"access":"read","join_on":"","role":"WBS element, object number, company code and responsible person (driving table)","table":"PRPS","variant":"both"},{"access":"read","join_on":"PROJ-PSPNR = PRPS-PSPHI","role":"Project definition","table":"PROJ","variant":"both"},{"access":"read","join_on":"JEST-OBJNR = PRPS-OBJNR","role":"Active system status (TECO, CLSD)","table":"JEST","variant":"both"},{"access":"read","join_on":"JCDS-OBJNR = JEST-OBJNR AND JCDS-STAT = JEST-STAT AND JCDS-CHGNR = JEST-CHGNR","role":"Date the status was set","table":"JCDS","variant":"both"},{"access":"read","join_on":"TJ02T-ISTAT = JEST-STAT AND TJ02T-SPRAS = SY-LANGU","role":"System status text","table":"TJ02T","variant":"both"},{"access":"read","join_on":"COSP-OBJNR = PRPS-OBJNR","role":"Actual cost and settlement totals (balance)","table":"COSP","variant":"both"},{"access":"read","join_on":"COBRB-OBJNR = PRPS-OBJNR","role":"Settlement rule: receiver category, receiver and percentage","table":"COBRB","variant":"both"},{"access":"read","join_on":"TKA01-KOKRS = PRPS-PKOKR","role":"Controlling area currency","table":"TKA01","variant":"both"}],"title":"Technically Completed WBS Elements with Unsettled Balance Report","url":"https://nekuhub.com/en/reports/technically-completed-wbs-unsettled-balance-report/","vendor_id":"nekudos"}