{"audience":"Purchasing managers, supplier development and quality teams, supply chain planners.","authorization_objects":[{"note":"Purchase order display authorization by purchasing organization","object":"M_BEST_EKO"},{"note":"Purchase order display authorization by plant","object":"M_BEST_WRK"}],"components":[],"countries":[],"effort_days_max":6,"effort_days_min":4,"effort_size":"M","faq":[{"a":"Goods receipts are allocated to schedule lines in date order. The first delivery is compared with the date of the first schedule line and the next delivery with the next line, so partial deliveries put the delay on the right line.","q":"How is the delay calculated when an order item is split into several schedule lines?"},{"a":"If the delivery date was postponed later, EKET-EINDT carries the new date. To measure the vendor against the originally agreed date, the statistical delivery date (EKET-SLFDT) can be chosen; it stays the same when the date is moved.","q":"Which date is used when the delivery date was changed?"},{"a":"Yes. EKKO, EKPO, EKET and EKBE keep the same structure in S/4HANA. The Fiori supplier evaluation apps use a different scoring logic; this report applies tolerance days as the company defines them.","q":"Does the report work on S/4HANA?"}],"features":[{"code":"alv","label":"ALV list (sort, filter, subtotals)","note":""},{"code":"layout","label":"User-specific layout variants","note":""},{"code":"drilldown","label":"Double-click drill-down to the document","note":"The vendor line opens the item-level receipt list, the order number opens ME23N and the material document opens MIGO display."},{"code":"excel","label":"Export to Excel","note":""},{"code":"background","label":"Runs as a background job","note":""},{"code":"email","label":"Send the result by email","note":"The monthly scorecard can be emailed to each purchasing group or vendor owner."}],"functions":[],"gap":"ME2N and ME80FN show the order history item by item; they do not calculate the difference between the goods receipt date and the delivery date and give no rate per vendor. Standard vendor evaluation (the ME61–ME65 family) needs scoring criteria to be set up and periodic evaluation runs, and does not show tolerance days, early delivery and the in-full rate separately. Companies therefore match MB51 and ME2N output in Excel and build the monthly scorecard by hand.","id":"mm-vendor-on-time-delivery-performance","industries":[],"input_columns":[],"kind":"report","language":"en","lastmod":"2026-11-17","logic":"1. EKKO and EKPO are read by purchasing organization, document type, vendor, plant and material group; deleted items (LOEKZ) and items without goods receipt are excluded.\n2. Goods receipts in the period (VGABE = 1) are read from EKBE; reversals (SHKZG = H) are deducted from the quantity of the receipt they cancel.\n3. Each receipt quantity is allocated in date order (FIFO) to the first EKET schedule line not yet covered. The reference date is EKET-EINDT (delivery date) or EKET-SLFDT (statistical delivery date), depending on the radio button.\n4. Delay = EKBE-BUDAT − reference date. If the delay lies between −early tolerance and +late tolerance the receipt is on time, below it early, above it late. A schedule line counts as in full when its quantity was received completely within the late tolerance.\n5. Results are summed by vendor, purchasing organization and plant; an on-time rate of ≥ 95% gives grade A, ≥ 85% grade B and below that grade C (thresholds are set during installation). The vendor line drills down to item detail.","module":"MM","object_type":"alv_report","output_columns":[{"calculated":false,"formula":"","label":"Vendor","source_field":"LIFNR","source_table":"EKKO"},{"calculated":false,"formula":"","label":"Vendor name","source_field":"NAME1","source_table":"LFA1"},{"calculated":false,"formula":"","label":"Purchasing org.","source_field":"EKORG","source_table":"EKKO"},{"calculated":false,"formula":"","label":"Plant","source_field":"WERKS","source_table":"EKPO"},{"calculated":true,"formula":"Goods receipt lines counted in the period (net of reversals)","label":"Receipts","source_field":null,"source_table":null},{"calculated":true,"formula":"Receipts whose delay is within the tolerance window","label":"On time","source_field":null,"source_table":null},{"calculated":true,"formula":"Delay \u003c −early tolerance","label":"Early","source_field":null,"source_table":null},{"calculated":true,"formula":"Delay \u003e late tolerance","label":"Late","source_field":null,"source_table":null},{"calculated":true,"formula":"On time ÷ receipts × 100","label":"On-time rate (%)","source_field":null,"source_table":null},{"calculated":true,"formula":"Average delay of late receipts (EKBE-BUDAT − EKET-EINDT)","label":"Avg. delay (days)","source_field":null,"source_table":null},{"calculated":true,"formula":"Largest delay in days among late receipts","label":"Max. delay","source_field":null,"source_table":null},{"calculated":true,"formula":"Schedule lines received in full within tolerance ÷ schedule lines due × 100","label":"In-full rate (%)","source_field":null,"source_table":null},{"calculated":true,"formula":"Σ EKBE-DMBTR (VGABE = 1, reversals negative)","label":"Received value","source_field":null,"source_table":null},{"calculated":false,"formula":"","label":"Currency","source_field":"HSWAE","source_table":"EKBE"},{"calculated":true,"formula":"On-time rate ≥ 95% A, ≥ 85% B, otherwise C","label":"Grade","source_field":null,"source_table":null}],"parameters":[{"example":"1000","kind":"select_option","label":"Purchasing organization","name":"S_EKORG","ref_field":"EKKO-EKORG","required":true},{"example":"1100","kind":"select_option","label":"Plant","name":"S_WERKS","ref_field":"EKPO-WERKS","required":false},{"example":"100387","kind":"select_option","label":"Vendor","name":"S_LIFNR","ref_field":"EKKO-LIFNR","required":false},{"example":"01.01.2026 – 31.10.2026","kind":"select_option","label":"Goods receipt posting date","name":"S_BUDAT","ref_field":"EKBE-BUDAT","required":true},{"example":"01","kind":"select_option","label":"Material group","name":"S_MATKL","ref_field":"EKPO-MATKL","required":false},{"example":"NB","kind":"select_option","label":"Order document type","name":"S_BSART","ref_field":"EKKO-BSART","required":false},{"example":"3","kind":"parameter","label":"Early delivery tolerance (days)","name":"P_EARLY","ref_field":"","required":false},{"example":"2","kind":"parameter","label":"Late delivery tolerance (days)","name":"P_LATE","ref_field":"","required":false},{"example":"X","kind":"radio","label":"Compare with delivery date (otherwise statistical date)","name":"R_EINDT","ref_field":"","required":false}],"part_of":[],"performance":"Restrict EKBE by period and order list first, and read EKET for the same order list in one go. Even for a year of data the report usually runs in under a minute; the monthly scorecard can be prepared by a background job and sent by email.","process":"P2P","quote_url":"https://nekuhub.com/en/request-a-quote/?report=mm-vendor-on-time-delivery-performance","related":["mm-open-po-by-vendor","mm-overdue-po-vendor-reminder-email","qm-vendor-quality-scorecard"],"releases":[],"source":"custom","standard_alternatives":[{"note":"Lists the order history flexibly; does not calculate delay days or an on-time rate per vendor.","tcode":"ME80FN"},{"note":"Lists goods receipt documents; does not show the delivery date of the order.","tcode":"MB51"}],"summary":"A custom ALV report that compares every goods receipt posted in the selected period with the delivery date of the purchase order and shows, per vendor, the number of on-time, early and late receipts, the on-time rate, the average and maximum delay and the in-full rate. It gives a measurable delivery scorecard in one list for vendor evaluation and supplier meetings.","tables":[{"access":"read","join_on":"","role":"Order header: vendor, purchasing organization, document type (driving table)","table":"EKKO","variant":"both"},{"access":"read","join_on":"EKPO-EBELN = EKKO-EBELN","role":"Order item: material, plant, material group","table":"EKPO","variant":"both"},{"access":"read","join_on":"EKET-EBELN = EKPO-EBELN AND EKET-EBELP = EKPO-EBELP","role":"Schedule line: delivery date, statistical date, scheduled quantity","table":"EKET","variant":"both"},{"access":"read","join_on":"EKBE-EBELN = EKPO-EBELN AND EKBE-EBELP = EKPO-EBELP","role":"Order history: goods receipt date, quantity and value","table":"EKBE","variant":"both"},{"access":"read","join_on":"LFA1-LIFNR = EKKO-LIFNR","role":"Vendor name","table":"LFA1","variant":"both"}],"title":"Vendor On-Time Delivery Performance Report","url":"https://nekuhub.com/en/reports/vendor-on-time-delivery-performance-report/","vendor_id":"nekudos"}