{"audience":"Project managers, project control (PMO) teams and project accounting.","authorization_objects":[{"note":"Project display authorization by controlling area","object":"C_PROJ_KOK"},{"note":"WBS element authorization by controlling area","object":"C_PRPS_KOK"},{"note":"Order display authorization by plant","object":"M_BEST_WRK"}],"components":[],"countries":[],"effort_days_max":7,"effort_days_min":5,"effort_size":"M","faq":[{"a":"The report only reads. Ready elements can be selected and passed to the mass status change program, so TECO is given only to elements without blockers.","q":"Can WBS elements shown as ready be closed from the report?"},{"a":"Small balances of a few units can remain due to exchange differences or rounding. A balance below the tolerance does not block closing but is shown as a note on the row.","q":"Why is the balance checked against a tolerance?"},{"a":"Yes. Status management (JEST), purchasing account assignments and reservations are the same in S/4HANA. For the balance, the COSP compatibility view or ACDOCA is read; MATDOC-based stock views can also be used for reservations in S/4HANA.","q":"Do the same checks apply in S/4HANA?"}],"features":[{"code":"alv","label":"ALV list (sort, filter, subtotals)","note":""},{"code":"layout","label":"User-specific layout variants","note":""},{"code":"drilldown","label":"Double-click drill-down to the document","note":"The open PO count opens ME2J, the reservation count the CN52N component list and the balance CJI3 for that WBS element."},{"code":"excel","label":"Export to Excel","note":""},{"code":"background","label":"Runs as a background job","note":""},{"code":"email","label":"Send the result by email","note":"In the month-end closing week, blocked WBS elements can be sent to the responsible person."}],"functions":[],"gap":"When the TECO status is set in CJ20N, warnings about open items appear only at that moment and element by element; there is no advance checklist for many WBS elements. CN43N lists WBS elements with their status but does not check open orders, reservations, billing plans or balances. The custom report collects all blockers in one list and separates the elements that are \"ready to close\".","id":"ps-wbs-teco-readiness-check","industries":[],"input_columns":[],"kind":"report","language":"en","lastmod":"2026-11-17","logic":"1. PROJ and PRPS are read by project, WBS element, responsible person and company code. Active statuses come from JEST; elements that are released (REL) but not yet TECO or CLSD remain.\n2. Open orders: number and value of the EKPO items linked via EKKN-PS_PSP_PNR that are not deleted and not delivery-completed (ELIKZ blank).\n3. Open requisitions: EBAN items linked via EBKN that are not deleted and whose ordered quantity is below the requisition quantity.\n4. Open reservations: items linked via RESB-PSPEL without the final issue flag (KZEAR) or deletion flag and with BDMNG \u003e ENMNG.\n5. Unbilled billing plan: value of the FPLA/FPLT dates of the sales order linked to the WBS element whose billing status is not complete (FKSAF ≠ C).\n6. Balance: total actual cost and revenue in COSP (WRTTP 04); above the tolerance, settlement is considered necessary. If all checks are clean the row is \"ready\", otherwise the blocking reasons are listed.","module":"PS","object_type":"alv_report","output_columns":[{"calculated":false,"formula":"","label":"Project","source_field":"PSPID","source_table":"PROJ"},{"calculated":false,"formula":"","label":"WBS element","source_field":"POSID","source_table":"PRPS"},{"calculated":false,"formula":"","label":"Description","source_field":"POST1","source_table":"PRPS"},{"calculated":false,"formula":"","label":"Responsible","source_field":"VERNA","source_table":"PRPS"},{"calculated":true,"formula":"Text of the active statuses in JEST (e.g. REL, TECO)","label":"System status","source_field":null,"source_table":null},{"calculated":true,"formula":"Number of items with EKPO-LOEKZ and EKPO-ELIKZ blank","label":"Open PO items","source_field":null,"source_table":null},{"calculated":true,"formula":"Σ EKPO-NETWR (open items)","label":"Open PO value","source_field":null,"source_table":null},{"calculated":true,"formula":"Number of items with EBAN-BSMNG \u003c EBAN-MENGE and LOEKZ blank","label":"Open requisition items","source_field":null,"source_table":null},{"calculated":true,"formula":"Number of items with RESB-KZEAR and XLOEK blank and BDMNG \u003e ENMNG","label":"Open reservations","source_field":null,"source_table":null},{"calculated":true,"formula":"Σ FPLT-FAKWR (FKSAF ≠ C)","label":"Unbilled billing plan value","source_field":null,"source_table":null},{"calculated":true,"formula":"Σ COSP actual (WRTTP 04), all periods","label":"Balance to settle","source_field":null,"source_table":null},{"calculated":false,"formula":"","label":"Currency","source_field":"TWAER","source_table":"COSP"},{"calculated":true,"formula":"Ready if all checks are clean, otherwise Blocked","label":"Readiness","source_field":null,"source_table":null},{"calculated":true,"formula":"List of the checks that are not zero","label":"Blocking reasons","source_field":null,"source_table":null}],"parameters":[{"example":"P-26015","kind":"select_option","label":"Project","name":"S_PSPID","ref_field":"PROJ-PSPID","required":true},{"example":"P-26015*","kind":"select_option","label":"WBS element","name":"S_POSID","ref_field":"PRPS-POSID","required":false},{"example":"12","kind":"select_option","label":"Responsible person number","name":"S_VERNR","ref_field":"PRPS-VERNR","required":false},{"example":"1000","kind":"select_option","label":"Company code","name":"S_PBUKR","ref_field":"PRPS-PBUKR","required":true},{"example":"100","kind":"parameter","label":"Balance tolerance","name":"P_BALTOL","ref_field":"","required":false},{"example":"","kind":"checkbox","label":"Only WBS elements with blockers","name":"P_ONLYBL","ref_field":"","required":false},{"example":"","kind":"checkbox","label":"Also check elements already in TECO","name":"P_INCTEC","ref_field":"","required":false}],"part_of":["ps-project-closing-pack"],"performance":"First determine the candidate WBS elements via JEST, then read EKKN, EBKN, RESB and COSP once each with this WBS list via FOR ALL ENTRIES. If RESB has no secondary index on PSPEL, restrict the read by plant and date range.","process":"R2R","quote_url":"https://nekuhub.com/en/request-a-quote/?report=ps-wbs-teco-readiness-check","related":["ps-closed-wbs-unsettled-balance","ps-project-stock-on-completed-wbs","ps-wbs-mass-status-change"],"releases":[],"source":"custom","standard_alternatives":[{"note":"Open-item warnings appear element by element and only when TECO is set; no advance bulk checklist.","tcode":"CJ20N"},{"note":"Lists WBS elements with their status; no check of open orders, reservations, billing plans or balances.","tcode":"CN43N"}],"summary":"A custom ALV report that shows, on one row per WBS element that is a candidate for technical completion (TECO), whether there are open purchase orders, open requisitions, open reservations, unbilled billing plan dates and a balance still to settle. Project teams see what has to be cleared before closing, and post-closing surprises decrease.","tables":[{"access":"read","join_on":"","role":"WBS element: description, responsible person, object number (driving table)","table":"PRPS","variant":"both"},{"access":"read","join_on":"PROJ-PSPNR = PRPS-PSPHI","role":"Project definition","table":"PROJ","variant":"both"},{"access":"read","join_on":"JEST-OBJNR = PRPS-OBJNR","role":"System statuses: REL, TECO, CLSD","table":"JEST","variant":"both"},{"access":"read","join_on":"EKKN-PS_PSP_PNR = PRPS-PSPNR","role":"Order items with account assignment to the WBS element","table":"EKKN","variant":"both"},{"access":"read","join_on":"EKPO-EBELN = EKKN-EBELN AND EKPO-EBELP = EKKN-EBELP","role":"Order item: value, deletion and delivery completed flags","table":"EKPO","variant":"both"},{"access":"read","join_on":"EBKN-PS_PSP_PNR = PRPS-PSPNR","role":"Requisitions with account assignment to the WBS element","table":"EBKN","variant":"both"},{"access":"read","join_on":"EBAN-BANFN = EBKN-BANFN AND EBAN-BNFPO = EBKN-BNFPO","role":"Requisition item: quantity and ordered quantity","table":"EBAN","variant":"both"},{"access":"read","join_on":"RESB-PSPEL = PRPS-PSPNR","role":"Open reservations linked to the WBS element","table":"RESB","variant":"both"},{"access":"read","join_on":"VBAP-PS_PSP_PNR = PRPS-PSPNR","role":"Sales order item assigned to the WBS element","table":"VBAP","variant":"both"},{"access":"read","join_on":"FPLA-VBELN = VBAP-VBELN","role":"Billing plan of the order","table":"FPLA","variant":"both"},{"access":"read","join_on":"FPLT-FPLNR = FPLA-FPLNR","role":"Billing plan dates: value and billing status","table":"FPLT","variant":"both"},{"access":"read","join_on":"COSP-OBJNR = PRPS-OBJNR","role":"Actual balance still to settle","table":"COSP","variant":"both"}],"title":"WBS Technical Completion (TECO) Readiness Check Report for Open Items","url":"https://nekuhub.com/en/reports/wbs-technical-completion-teco-readiness-check-report/","vendor_id":"nekudos"}