Weaving Loom Loading Plan Report by Width, Design and Warp Compatibility
Short answer: A custom ALV report that groups open weaving orders by loom width, fabric design and the warp they use, and proposes a sequence per loom that keeps warp changes to a minimum. Planners see on one screen which order can run on which loom, how many warp changes are needed and how many hours of work each loom is loaded with.
- Estimated effort
- L · 10–14 working days
- System
- ECC and S/4HANA
- Tables
- 11
- Scope
- Global · 1 industries
- Built by
- NeKuDos Teknoloji
- Last updated
Why is the standard not enough?
The CM21 planning table dispatches orders to work centers by date and capacity, and CM01 shows the work center load; neither knows whether the fabric width fits the loom width or whether consecutive orders use the same warp. Setup-optimized sequencing can be done in PP/DS with setup matrices, but that needs its own implementation and maintenance. The custom report applies these compatibility rules from existing order, work center and classification data.
Who uses it? Weaving planners, production supervisors and loom setup teams.
Closest standard alternatives
Tables used
The tables the report reads and their join fields. ECC and S/4HANA differences are marked separately.
| Table | Role | Join | System |
|---|---|---|---|
| AFKOOrder Header Data for PP Orders | Order header: basic dates, MRP controller, routing number (driving table) | — | ECC + S/4 |
| AFPOOrder Item | Order item: fabric, order quantity and unit | AFPO-AUFNR = AFKO-AUFNR | ECC + S/4 |
| JESTIndividual Object Status | Order status: orders with TECO, DLV or deletion flag are excluded | JEST-OBJNR = 'OR' + AFKO-AUFNR AND JEST-INACT = ' ' | ECC + S/4 |
| AFVCOperation within an Order | Weaving operations and work center link | AFVC-AUFPL = AFKO-AUFPL | ECC + S/4 |
| CRHDWork Center Header | Loom (work center) code | CRHD-OBJID = AFVC-ARBID AND CRHD-OBJTY = 'A' | ECC + S/4 |
| KBEDCapacity Requirements Records | Remaining capacity requirement of the operation | KBED-AUFPL = AFVC-AUFPL AND KBED-APLZL = AFVC-APLZL | ECC + S/4 |
| RESBReservation/Dependent Requirements | Order components: warp material | RESB-RSNUM = AFKO-RSNUM | ECC + S/4 |
| KSSKAllocation Table: Object to Class | Class assignment of the loom (class type 019) | KSSK-KLART = '019' | ECC + S/4 |
| AUSPCharacteristic Values of Objects | Fabric width, design and loom reed width characteristic values | AUSP-OBJEK = AFPO-MATNR AND AUSP-KLART = '001' | ECC + S/4 |
| MAKTMaterial Descriptions | Fabric description | MAKT-MATNR = AFPO-MATNR AND MAKT-SPRAS = SY-LANGU | ECC + S/4 |
| I_ManufacturingOrderOperationManufacturing Order Operation | In S/4HANA it can replace AFVC with a clean core approach | ManufacturingOrder = AFKO-AUFNR | S/4HANA only |
Selection screen parameters
| Parameter | Description | Type | Reference field | Required | Example |
|---|---|---|---|---|---|
| S_WERKS | Plant | Range / multiple | AFPO-PWERK | Yes | 1000 |
| S_ARBPL | Looms (work center) | Range / multiple | CRHD-ARBPL | Yes | DK001–DK048 |
| S_DISPO | MRP controller | Range / multiple | AFKO-DISPO | No | D01 |
| S_GSTRP | Basic start date range | Range / multiple | AFKO-GSTRP | No | 17.11.2026 – 15.12.2026 |
| P_ATWID | Fabric greige width characteristic | Single value | CABN-ATNAM | Yes | GREIGE_WIDTH |
| P_ATDES | Design characteristic | Single value | CABN-ATNAM | No | DESIGN_NO |
| P_ATLOM | Loom reed width characteristic | Single value | CABN-ATNAM | Yes | REED_WIDTH |
| P_WARP | Warp material group | Single value | MARA-MATKL | Yes | CZG01 |
Output columns
| # | Column | Source |
|---|---|---|
| 1 | Loom | CRHD-ARBPL |
| 2 | Reed width (cm) | Calculated Reed width characteristic in work center classification (AUSP-ATFLV) |
| 3 | Proposed sequence | Calculated Sequence number within the loom by warp, design and basic finish date |
| 4 | Production order | AFKO-AUFNR |
| 5 | Fabric | AFPO-MATNR |
| 6 | Fabric description | MAKT-MAKTX |
| 7 | Greige width (cm) | AUSP-ATFLV |
| 8 | Design | AUSP-ATWRT |
| 9 | Warp | RESB-MATNR |
| 10 | Order quantity | AFPO-PSMNG |
| 11 | Unit | AFPO-MEINS |
| 12 | Basic start | AFKO-GSTRP |
| 13 | Remaining load (hours) | Calculated Σ KBED remaining capacity requirement, converted to hours |
| 14 | Warp change | Calculated X if the warp differs from the previous order in the proposed sequence |
| 15 | Cumulative load % | Calculated Σ remaining load / available hours in the planning horizon × 100 |
| 16 | Fit | Calculated Fits / Width mismatch (greige width > reed width) |
Sample output
| Loom | Reed width (cm) | Proposed sequence | Production order | Fabric | Fabric description | Greige width (cm) | Design | Warp | Order quantity | Unit | Basic start | Remaining load (hours) | Warp change | Cumulative load % | Fit |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| DK012 | 220 | 1 | 1004521 | HK-PNY-210-01 | Ham bez 210 cm desen 01 | 210 | D-0410 | CZG-30-NE-4800 | 3,200 | M | 11/18/2026 | 41.50 | 52 | Fits | |
| DK012 | 220 | 2 | 1004533 | HK-PNY-210-07 | Ham bez 210 cm desen 07 | 210 | D-0417 | CZG-30-NE-4800 | 2,400 | M | 11/20/2026 | 31 | 91 | Fits | |
| DK012 | 220 | 3 | 1004540 | HK-SAT-200-02 | Saten ham 200 cm | 200 | D-0522 | CZG-40-PE-5200 | 1,500 | M | 11/21/2026 | 22 | X | 118 | Fits |
| DK031 | 190 | 1 | 1004552 | HK-KTN-205-03 | Keten ham 205 cm | 205 | D-0611 | CZG-20-LN-4400 | 1,800 | M | 11/19/2026 | 27 | 0 | Width mismatch |
How does the report work?
- Orders in the selected plant, MRP controller and basic start range are read from AFKO; via JEST only orders that are created or released and not technically completed remain.
- Weaving operations are taken from AFVC and the work center (ARBID) is translated to the loom via CRHD. The remaining capacity requirement of the operation is totalled in hours from KBED.
- The greige width and the design of the fabric are read via AUSP from characteristics in material classification (class type 001). The reed width of the loom comes from work center classification (class type 019) via KSSK and AUSP.
- The warp of the order is the component in RESB that falls into the warp material group given on the selection screen.
- Orders whose fabric width exceeds the loom width are flagged “Width mismatch”. The remaining orders are sorted per loom first by warp, then by design, then by basic finish date; when the warp differs from the previous order a “Warp change” flag is set.
- For each loom the cumulative load is compared with the available hours in the planning horizon; the summary line shows how many warp changes are saved against the current sequence. The report only proposes and does not change the orders.
Performance notes
Limit orders by plant, MRP controller and date range, and read JEST only for the object numbers of the selected orders. Read material and work center characteristics once with unique keys and keep them in memory.
Features
- ALV list (sort, filter, subtotals)
- User-specific layout variants
- Double-click drill-down to the document Double-clicking the order opens CO03; double-clicking the loom opens the CM01 capacity load.
- Export to Excel
- Runs as a background job
Authorization objects
- C_AFKO_AWKProduction order display authorization by order type and plant
- C_ARPL_WRKWork center display authorization by plant
Frequently asked questions
Does the report assign orders to looms by itself?
No, it proposes. The planner applies the proposal in the planning table. If needed, the confirmed sequence can be transferred by an extra function that updates the work center and dates of the order operations; this adds 3–4 days to the estimate.
What if the warp is not in the bill of material?
If the warp is not kept as a component, the warp properties of the fabric (such as yarn count and end count) are read from a material characteristic, and orders with the same value are treated as sharing a warp.
Does it work on S/4HANA?
Yes. The tables are the same in S/4HANA; operations can be read via I_ManufacturingOrderOperation. In systems that use PP/DS, the report can also be used to try out compatibility rules before setup matrices are built.
Related reports
Overdue Production Orders and Remaining Quantity Report
A custom ALV report that lists production orders past their basic finish date that are not yet fully received, with days late, remaining quantity and …
Production Order Schedule Adherence Report (Planned vs Actual Start and Finish)
A custom ALV report that compares the planned and actual start and finish dates of completed production orders and calculates the days of delay and …
Weekly Capacity Load by Work Center Report
A custom ALV report that shows, for every work center of the selected plant, the available capacity, the production order and planned order load and …