{"audience":"Production planners, capacity planners and production managers who plan shifts.","authorization_objects":[{"note":"Display work centers by plant","object":"C_ARPL_WRK"},{"note":"Display production orders by plant and order type","object":"C_AFKO_AWK"}],"components":[],"countries":[],"effort_days_max":8,"effort_days_min":5,"effort_size":"M","faq":[{"a":"Yes. Available capacity is calculated from the capacity's factory calendar and, where defined, its interval variants (shift program); holidays add no capacity.","q":"Are shift programs and holidays taken into account?"},{"a":"The remaining requirement comes from the same source (KBED), so the totals match for the same period and capacity. The difference is that the result is one weekly table that compares work centers.","q":"Is the result the same as CM01?"},{"a":"Yes. KBED, KAKO, CRHD and CRCA keep the same structure in S/4HANA. For a clean core approach, CDS views such as I_WorkCenterCapacity and I_CapacityRequirement can be used.","q":"Does it work on S/4HANA?"}],"features":[{"code":"alv","label":"ALV list (sort, filter, subtotals)","note":""},{"code":"layout","label":"User-specific layout variants","note":""},{"code":"drilldown","label":"Double-click drill-down to the document","note":"A week line opens that week's operations; from an operation CO03 opens."},{"code":"excel","label":"Export to Excel","note":""},{"code":"background","label":"Runs as a background job","note":""},{"code":"email","label":"Send the result by email","note":"Overloaded weeks can be sent to the person responsible for the work center."}],"functions":[],"gap":"CM01 and CM05 show overload per work center, but the result is a set of separate screens split by period; there is no way to export several work centers as one table with weekly available hours, production order load and planned order load, or to email overloaded weeks. Planners combine the results of several screens by hand for the weekly capacity meeting.","id":"pp-weekly-capacity-load-by-work-center","industries":[],"input_columns":[],"kind":"report","language":"en","lastmod":"2026-11-17","logic":"1. Work centers of the selected plant (OBJTY = A, LVORM blank) are read from CRHD. CRCA gives the capacities (KAPID) of each work center; KAKO gives the capacity category (KAPAR), shift start and end (BEGZT, ENDZT), break (PAUSE), utilization rate (NGRAD) and number of individual capacities (AZNOR).\n2. Daily available capacity = (ENDZT − BEGZT − PAUSE) × NGRAD ÷ 100 × AZNOR, converted from seconds to hours. Working days come from the factory calendar in KAKO-KALID (or the plant calendar when blank); interval variants defined on the capacity take priority.\n3. Capacity requirement records of these capacities are read from KBED. The remaining requirement KBEAREST (unit KEINH) is converted to hours and assigned to the ISO week of the scheduled start date (SSTAD; FSTAD when blank).\n4. Records that match AFKO-AUFPL = KBED-AUFPL are totalled as production order load; records without a match are written, by selection, to the planned order load column.\n5. Utilization % = (order load + planned order load) ÷ available capacity × 100. Weeks above the threshold are flagged as overloaded and shown in red.\n6. Double-clicking a line opens the operations of that week (order, operation, remaining hours) in a separate list.","module":"PP","object_type":"alv_report","output_columns":[{"calculated":false,"formula":"","label":"Work center","source_field":"ARBPL","source_table":"CRHD"},{"calculated":false,"formula":"","label":"Plant","source_field":"WERKS","source_table":"CRHD"},{"calculated":false,"formula":"","label":"Capacity category","source_field":"KAPAR","source_table":"KAKO"},{"calculated":false,"formula":"","label":"Capacity name","source_field":"NAME","source_table":"KAKO"},{"calculated":true,"formula":"ISO week of KBED-SSTAD","label":"Week","source_field":null,"source_table":null},{"calculated":true,"formula":"(KAKO-ENDZT − BEGZT − PAUSE) × NGRAD ÷ 100 × AZNOR × working days","label":"Available (h)","source_field":null,"source_table":null},{"calculated":true,"formula":"Σ KBED-KBEAREST of records that match AFKO","label":"Order load (h)","source_field":null,"source_table":null},{"calculated":true,"formula":"Σ KBED-KBEAREST of records not linked to a production order","label":"Planned order load (h)","source_field":null,"source_table":null},{"calculated":true,"formula":"(Order load + planned order load) ÷ available × 100","label":"Utilization %","source_field":null,"source_table":null},{"calculated":true,"formula":"Available − total load (negative: overload)","label":"Free / over hours","source_field":null,"source_table":null},{"calculated":true,"formula":"Number of KBED records in the week","label":"Operations","source_field":null,"source_table":null},{"calculated":true,"formula":"Overloaded when utilization % exceeds the threshold, otherwise normal","label":"Status","source_field":null,"source_table":null}],"parameters":[{"example":"1000","kind":"select_option","label":"Plant","name":"S_WERKS","ref_field":"CRHD-WERKS","required":true},{"example":"PRES-01","kind":"select_option","label":"Work center","name":"S_ARBPL","ref_field":"CRHD-ARBPL","required":false},{"example":"001","kind":"select_option","label":"Person responsible","name":"S_VERAN","ref_field":"CRHD-VERAN","required":false},{"example":"001","kind":"select_option","label":"Capacity category","name":"S_KAPAR","ref_field":"KAKO-KAPAR","required":false},{"example":"17.11.2026","kind":"parameter","label":"Start date (default: today)","name":"P_FROM","ref_field":"SY-DATUM","required":true},{"example":"4","kind":"parameter","label":"Number of weeks","name":"P_WEEKS","ref_field":"","required":true},{"example":"100","kind":"parameter","label":"Overload threshold (%)","name":"P_LIMIT","ref_field":"","required":false},{"example":"X","kind":"checkbox","label":"Include planned order load","name":"P_PLAF","ref_field":"","required":false}],"part_of":["pp-production-control-pack"],"performance":"Read KBED only for the selected capacity IDs and date range. Calculate the factory calendar once per capacity and keep it in a buffer. In plants with many work centers, run the report in the background every morning and distribute the result by email.","quote_url":"https://nekuhub.com/en/request-a-quote/?report=pp-weekly-capacity-load-by-work-center","related":["pp-overdue-production-orders","pp-scrap-yield-by-work-center"],"releases":[],"source":"custom","standard_alternatives":[{"note":"Gives the work center load per period; it does not give several work centers in one Excel table by week.","tcode":"CM01"},{"note":"Lists overloaded work centers; it does not show order and planned order load in separate columns.","tcode":"CM05"}],"summary":"A custom ALV report that shows, for every work center of the selected plant, the available capacity, the production order and planned order load and the utilization for the coming weeks as a work center × week matrix. Overloaded weeks are flagged against a threshold and exported to Excel as one table.","tables":[{"access":"read","join_on":"","role":"Capacity requirement records: remaining requirement and scheduled dates (driving table)","table":"KBED","variant":"both"},{"access":"read","join_on":"CRHD-OBJTY = 'A' AND CRHD-OBJID = CRCA-OBJID","role":"Work center code, plant and person responsible","table":"CRHD","variant":"both"},{"access":"read","join_on":"CRCA-KAPID = KBED-KAPID","role":"Link between work center and capacity","table":"CRCA","variant":"both"},{"access":"read","join_on":"KAKO-KAPID = KBED-KAPID","role":"Capacity category, shift length, utilization rate and factory calendar","table":"KAKO","variant":"both"},{"access":"read","join_on":"AFKO-AUFPL = KBED-AUFPL","role":"Production order the capacity requirement belongs to","table":"AFKO","variant":"both"}],"title":"Weekly Capacity Load by Work Center Report","url":"https://nekuhub.com/en/reports/weekly-capacity-load-by-work-center-report/","vendor_id":"nekudos"}