# I_ProductCostEstimate — Product Cost Estimate

> Returns the header data of material cost estimates with costing variant, lot size and status. It is a released (C1) VDM basic view, so it can be used in custom CDS views, ABAP reports and S/4HANA Cloud / ABAP Cloud development. In classic ECC it corresponds to table KEKO.

- Modules: CO
- Type: CDS view
- S/4HANA status: S/4HANA only

- URL: https://nekuhub.com/en/tables/i-productcostestimate/

## Main fields

| Field | Description | Key |
|---|---|---|
| CostingReferenceObject | Costing reference object | Yes |
| CostEstimate | Cost estimate number | Yes |
| CostingType | Costing type | Yes |
| CostingDate | Costing date | Yes |
| CostingVersion | Costing version | Yes |
| ValuationVariant | Valuation variant | Yes |
| CostIsEnteredManually | Manually entered cost | Yes |
| Plant | Plant | - |
| ControllingArea | Controlling area | - |
| CompanyCode | Company code | - |
| CostingVariant | Costing variant | - |
| CostingLotSize | Costing lot size | - |
| CostEstimateStatus | Cost estimate status | - |
| ProfitCenter | Profit center | - |

## Reports using this table

