# KALO — Costing Run: Costing Objects

> Holds every material and plant combination selected in a costing run (CK40N), with run name, run date, costing version and low-level code. It is used to see which materials a standard costing run covers and which cost estimate each one is linked to. Use KALNR to move to the cost estimate header in KEKO.

- Modules: CO
- Type: Transparent table
- S/4HANA status: Used the same way in S/4HANA

- URL: https://nekuhub.com/en/tables/kalo/

## Main fields

| Field | Description | Key |
|---|---|---|
| KALAID | Costing run name | Yes |
| KALADAT | Costing run date | Yes |
| TVERS | Costing version | Yes |
| DISST | Low-level code | Yes |
| KALVZAE | Counter for costing run tables | Yes |
| MATNR | Material number | - |
| WERKS | Plant | - |
| KALNR | Cost estimate number | - |

## Reports using this table

